My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 9:42:05 AM
Creation date
1/10/2023 9:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC. #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7150-'FOOL PROCEDURE BUA)W STEP I" T1G}iTFM THE 71 SO•TWL <br /> FOR 71 SO-TOOLC,SEE PAGE 9 Use the three view holes to ensure that the tool seats <br /> FOR 71 SO-TOO=Sly PAGE 10 out fiat against the top of the Wet tube. To pfevent <br /> verdcaI movement of the twl during drilling,hand <br /> Now. 71SO-TOOL can on ly tea used with tastable tighten al three knobs rvvnly to the upper drop tube <br /> aYQrfr3l valves If modified as shown below. A 2' Set FIqum 1 BA. <br /> +gide slut must ba added to accommodate cast lug <br /> S'['EP 11A: PREPARE DRILL AND BIT <br /> Add 2'wide Confirm that the stop ort ttte 3/1Wdrill bit supplied <br /> sd usa � wlth the 71SO-TOOL Is in the correct position before <br /> dri long. The stop Is fwWry installed at a distance Ire- <br /> testable valves <br /> _ , l tween r to 2-1/1 b"fracn the tip with the 7150-TOOL If <br /> the stop is not at the correct position it must be frxed <br /> before dulling. <br /> — CAUT10Ns If the drill stop b not in the prepay lota- <br /> k+ k ` tion failure of a prossune d*W Wak tut rsray resuk. <br /> 1• <br /> 71 SG-TOOL Modlfiwtians for Te0able Inlet <br /> STEP 9& INSERT 71S0-TDOLOYMINLET TUBE <br /> To install the 715&TOOL(sold separately)over the inlet <br /> tube,first loosen all three ImoW,w the tool can pass Tip to stop~dimensim must be <br /> f r eely over the inlet tube flange. Align the slot on The 2"to 2-1116". <br /> tool with tyre key on the Inlet tube and inset(tbt tool <br /> down. See Flgtma 911. r+�g 7 TA <br /> LOOSMNi, -Und STEP 12A: DRILL NOW <br /> TOGA 4W baps YliwW holes "hwn With the inlet tube and 71 SO-TOOL 1n prate,carefully <br /> w,obs drill a 311 b'dlarneter hole in the upper tube using the <br /> eye* drill bushing in the knob as a guide. The drill stop is po- <br /> �� si tioned so It will bottom out again st the knob after the <br /> -- bit has drilled through the upper drop tube. If the stop <br /> is positioned wrong either m hole will be drilled,or a <br /> / thwugh hale could potentia *be drilled t wouph H-6-- <br /> inlet <br /> fieinlet tube. If no hole is drilled return to step 11Aand <br /> check th¢stop dimenslen. tf a help is drilled through <br /> the Inlet tube or into the screw We the assembly is not <br /> inln salvageable, Drill(2) more holes in the two remaining <br /> "Tub,! knobs. <br /> i ke+r <br /> I <br /> Dill thru upper <br /> Fiyrrrrs 9A rigum 100 rube m ty <br /> 1p f�i 1,1A <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.