Laserfiche WebLink
Vapor Recovery Fill Riser <br /> w <br /> OPW <br /> w&, I <br /> Ball Float <br /> 14"Mi nim urn <br /> Clearance for <br /> Tu be Cut Float 4"NPT <br /> per Local Nipple <br /> Requirements <br /> a <br /> .— Align Float Along length of Tank �. SWiVeI <br /> Product B Jack <br /> F�grene,� <br /> Adaptor Screw <br /> Kit <br /> orient socket <br /> adaptor be- FOR TESTABLE 11110100ILS ONLY: Check insmlla6or% <br /> tween jack agaln as done in Step 23 to ensure poppet actuates and <br /> screw felts resets properly. See page 17 for f"testing detail& Ap- <br /> ply pipe dope to the socket adaptor threads. Pipe dope <br /> should be a norrhardening gasogr►e resistant pipe <br /> thread seal compound. Install socket adaptor and <br /> Marque to 35 ftabs(42 in-ts)minimum to 5_0 ft-lbs(60 <br /> In-ItM maximum. After in sial ling socket adaptor where <br /> required,pressure test testable overfill valve per CARD <br /> TP201.t D to ensure valve is vapor tight. <br /> Fiipa>x 24A <br /> 15 <br />