Laserfiche WebLink
TEST INSTRUC"ONS Socket <br /> POPPET&FLOAT MOVEMENT <br /> FOR TESTAOLE>>I ODELS ONLY ad��r <br /> TOOLS NHMD VOR TESTING: � �a <br /> 1. 1/4"Aware drive exitensiDn or 3/8'square dnve ear- I 1 , <br /> ten5lon with 31W to 1/4'sotketadbpter. j k < < 1 <br /> 2. Torque wrench/1/4`or 3/8"squafe drive ratchet 1 <br /> wrench. t ' <br /> 3. Pipe doge. <br /> 4. Flashlight(optional). <br /> open Poppet Closed Poppet <br /> T'rST STEP is <br /> Remove Will container cover and fi 11 cap from fi 11 adapt- Test figrrry t <br /> er and took down into the tube and make sure no debris Pull on exten5iort ar�d <br /> or fo t*9n ablects are present- If dlehris er foreign ob.- <br /> J"are present take appropriate steps before proceed- ��adaptor <br /> irsg. Look down into the tube and ensure poppet is <br /> cnmplmMy protected by titin d~lon shield. See Test <br /> Figure 1. If poppet is exposed and tank is nvt full the =r <br /> oyetfil I valve should be replaced. A flashlight may help <br /> when inspecting the tube. <br /> T111ST STEP 2: S <br /> Unthread the socket adaptor assern*from the inlet � <br /> tube uslN a 1/4`sgowe4kive extension and wrerKh. <br /> The extension wall attach to the socket adaptor. Seeure rte. <br /> all tools to unsure they don't fall into the tank or valve- <br /> With <br /> alve-With the exterssion still attached pull on the socket <br /> aQa ptor and cable aasernbly and ensure float and pop- - -- <br /> mt movie I frxtiction properly. ft should only require 3" -- - . <br /> 16 u"oyf movement and less than 5 lbs of force i n of der �- <br /> to actuate the float and poppet. When looking down <br /> into the upper tube ensure poppet 15 vislble and mows <br /> into the flow path{see Test Figure 1 &2)when socket Open <br /> adaptor is puWaM+Mets prapefltr where socket adap- Poppet � � Closed <br /> tar is released. If poppet doe's not actuate freely lake I � pots <br /> Float moves <br /> appropriate Steps to correct. i <br /> up <br /> i <br /> MST STEP 3: � <br /> Apply pipe dope to the socket adaptor threads, Piper-- <br /> dope should be a non-hardening gasoline resistant pipe <br /> thread seat compound. Maid sure poppet and float <br /> have reset properly and are notvis]ble then insta)I sock- <br /> et adaptor abd torque to 35 ft-lbs(42 InAbs)minimum i s <br /> to 5,0 ft4b6(60 in-)t*)mayrimum. After installing socket <br /> r <br /> adaptor,to ensure vapor tightness,OPW recontmends <br /> conducting pressure testing per GARB TP201.1 D. Some Test F*me 2 <br /> areas may re,,luire pr enure testing of overfill va Ive per <br /> GARB TP201.10 to ensure valve Is vapor tight. If the <br /> drop tube fails pressure testing it may be necessary to <br /> check the seal at tete poppet adaptor threads, ReinsFall <br /> AN cap and rpiH tanta&varcawq.after t4wtvng. <br /> 17 <br />