My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 10:53:21 AM
Creation date
1/10/2023 9:07:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for TRACY SHELL as of May05 , 2023 . <br /> Open violations from January 30 , 2023 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #319 - Failure to comply with overfill prevention equipment requirements . <br /> OBSERVATION Overfill prevention testing has not been conducted . Overfill prevention testing was last performed <br /> on 5/ 19/2019 and was due by 10/ 13/2021 <br /> REGULATION GUIDANCE: Overfill prevention equipment inspections were required to be conducted by October <br /> 13 , 2018 , and every 36 months thereafter, and within 30 days of completion of a repair. <br /> CORRECTIVE ACTION : Immediately schedule this testing and provide 48 hours notification to the EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.