Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Dsl=Diesel. CSI=Containment Solutions Inc.. Compt=Compartment. Prodt=Product. <br /> PS=Piping Sump. FRS=Fill Riser Sump. Western FG=Western Fiberglass. <br /> *Tanks have Brine Filled Tank Secondary Containment, and are exempt from periodic testing. <br /> Tank #1 and Tank #3 is a 20K two compartment. Tank #1 is designated for 12K Super 91 Octane <br /> Gasoline. Tank #3 is designated for 8K Diesel. Tank #1 and Tank #3 have a common Tank <br /> Secondary Containment. <br /> Note: Gas Vapor Piping is manifolded between Tank #1 Super 91, and Tank #2 Regular 87. <br /> Replaced Test Boot on Gas Vapor Pipe in Tank #2 Regular 87 Piping Sump, prior to testing. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />