Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> 91 product secondary line failed, test boots need to be replaced in UDC 314, 718 and 9110. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />