Laserfiche WebLink
SITE PLA ( <br /> Application <br /> '191-L <br /> Z; <br /> W <br /> 40' 0 20' Al BP low, f � <br /> .� flow <br /> LEGEND: ZIP <br /> d p CONCRETE PAD <br /> ASPHALT �II AL <br /> I� <br /> �If�` w <br /> — — — — <br /> PROPERTY LINE <br /> RVSPACESto <br /> E3 RV UTILITY HOOKUP TLS i <br /> ® BACITLOW PREW I ER ASSEMBLY N3r 2F• Ora <br /> GATE VALVE <br /> 06 <br /> abs �9 oIL f <br /> rr <br /> GENERAL NOTES: rj` / �- <br /> O <br /> 1, THESE PLANS SHOW EXISTING FEATURES INCLUDING BUT NOT LIMITED TO TREES, UTLITEB, AND ol <br /> '9 <br /> STRUCTURES THAT MAY BE AFFECTED BY THE CONSTRUCTION OR PLACEMENT OF THE 7 vAREB + \ <br /> PROPOSED ENGINEERED IMPROVEMENTS, THECONTRACTOR ISLL IMMEDIATELY NOTIFY THE � / �•`' ' , . , \� , , Q <br /> ENGINEER IF THERE ARE ANY EXISTING FEATURES, WHETHER SHOWN OR NOT SHOWN ON THESE 'ti . • . G <br /> PLANS, THAT COULD N ANY WAYSE N POTFNTN.CONFUCTYATHTHE DESIGN OF THERE PUNS. <br /> ALL WORK WITHIN THEVICINITY OF A POTENTIAL CONFLICT SHALL CEASE UNTILAN ADEQUATE ' NA1' RRCMIE . � v J <br /> Z48Y . <br /> AND APPROPRIATESOLlRIOEIINDETERMINED BY THE ENGINEER AND APPROVED BY THE PUBLIC , �\ d .. \ 2 <br /> WOW DEPARTMENT. If <br /> �v., l •� h.fr \ <br /> 2 SHOULD ITAPPEARTHAT THE WORKTO BE DONE, OR ANY MATTER RELATIVE THERETO, ISNOT L \ <br /> SUFFICIENTLY DETAILED OR EMPLANED ON THESE PLANS, THE CONTRACTOR SHALL CONTACT / �{� . � ' \:' JiR�ey <br /> PROJECT ENGINEER FOR SUCH FURTHER EXPLANATIONS AS MAY BE NECESSARY. L <br /> 3. QUALITY CONTROL PLAN: THE CONTRACTOR GRILL BE RESPONSIBLE FOR CONTROLLING THE 7o A- 5 \ All <br /> QULNATY OF MATERIAL ENTERING THE WOW AID THE WORICPERFORNED. AND SHALL PERFORM i , <br /> TESTING TO ENSURE CONTROL PRIOR Twill OF WORK THE CONTRACTOR SHALL SLBMTA '� 1 \ �vw 4 <br /> QUALITY CONTROL PLAN THAT MUST DESCRIBETHE METHODS AND FREQUENCY OF TESTING f \ <br /> IMPLEMENTATION OF CORRECTIVE ACTIONS AS NECEBRARY, AND REPORTING OF TEST RESULTS, <br /> SPECIFIC 70 EACH MATERIAL TO BE USED. 5 <br /> 4, ALL REVISIONS TO THIS PLAN MUST BE REVIEWED BY THE PUBLIC E'IORKS DEPARTMENT PRIOR \ • �Q <br /> TO CDNSTRUCTON AND SHALL BE ACCURATELT SHOWN ON REASED PLANS, STAMPED AND \ \ <br /> DISTRIBUTED BY THE ENGNEERNG SERVICES DIVISION, PPORTO ACCEPTANCE OF THEWORK fo <br /> ASCOMPLETE, : 0 <br /> 54 NO TREES SHALL BE REMOVED UNLESS THEY ARE SHOWN AND NOTED TO BE REMOVED ON THE / <br /> IMPROVEMENT RAMS, F ANY TREES ARE TO BE REMOVED,THE IMPROVEMENT PLANS MUST BE <br /> REVIEWED AND ACKNOWLEDGED BY THE COMMUNITY DEVELOPMENT DEPARTMENT. Al <br /> CONFUCTNO 'ATTH GRADING UTIRF3, OR OTNER IRPROVEUENTS, OR OI'ERFIANGNG THE \ evo <br /> SIDEWALK OR PAVEMENT BOAS TO FORM A NUSANCE OR HAZARD, SHALL BE TR&iMED, / <br /> PROPERLYTREATED AND SEALED, A TREE PEI MAYBE NECESSARY AND CANOE OBTAINED <br /> FROM THE COMMUNITY DEVELOPMENT DEPARTMENT!, 05 ♦ \ ' ` ,� : ,, <br /> B. COMPACTION REQUIREMENTS (RELATIVE DENSITY PER Al 0.155/1: 1 1 <br /> 4 <br /> A ' PF C ' <br /> EXISTING SUBORADE. 90% IN THE I7 FROM NATIVE OR CUTSJ A E O <br /> 2 <br /> B. TRENCH BACKALL: / 3gO • O <br /> I, N PUSUC RIGHTAFWAY: PER CJTYSTAFDARDS \ / A tZ . <br /> 2 IN LANDSCAPED AREAS: 557E IN THETOP I7 FROM FINISHED GRADE BO% BELOW I2' ATP \ p �T�I}' �I�I' I�( \ LY <br /> FROM FINISH GRADE / / A \ 44 a t Z 2 9 <br /> 3. N BUILDING PADS: 90% FULL DEPT VV!' W wo <br /> G ROAD RIGHT-0FWAYI '— — _ wl <br /> ' a <br /> 1. PERCITYSTANDARDS •q `L•P O U <br /> 2 NPARKWAYS: 90% MBNAN THETOPSFROM FINISH GRADE, 857E BELOLVF FROM ' \ _ \ W �1 <br /> FINISH GRADE. X91 t� � " \ C W Lu <br /> 000 <br /> T. APPUCABLE FEES TO BE PAD AND PERMITS TEOIIRED SHALL BE OBTAINED BYTHE \ <br /> CONTRACTOR BEFORE COMMENCEMENT OF CONSTRUCTIDN. C^- -s <br /> & CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE V'ATHGENERALLYACCEPTED ss \ S \\ C y N sS <br /> CONSTRUCTION PRACTICES, CONSTRUCTION CDNTRACT WILL BE REOURED TO ASSUMESOLE <br /> AND CTOTERAOFE ,I�ENGANDEDGPPCCONNTI� OR FURHGRETDENDIINGY D HOLD THE CONSTRUCTION <br /> HARMLESS FROM ANY AND ALL CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE \ <br /> PROJECT, INCLUDING SAFETY OFALL PER.RONSAND PROPERTY, THAT THIS REOUIREVENT SHALL \� •• •�' • \ <br /> BE MADE TOAPPLY CONTINUOUSLY AND NOT BE UNITED TO NORMAL UABLITY, REAL OR O \ \ <br /> ALLEGED, IN CCNNECTION YITHTHE PERFORNANCE OF WORK ON THIS PROJECT, EXCEPTING <br /> LABILITY ARISING FROM THE SOLE NEGUGENCE OF THE DESIGN PROFESSIONAL <br /> 9, PRIOR TO ANY CORRECTIVE ACTION BY THE COIRRALTORW4BGH IS NECESSARY TO ALLEGED •�� .,` <br /> STAKING ERROR, THE CONTRACTOR SHALL NOTIFY RDGEUNE ENGINEERING FOR REBTAKING - \ <br /> AND VERIFICATION OF PREVIOUS STAKING SHOULD ANY CORRECTIVE 'i.'OPK BE DONE PRIOR TO \ <br /> NOTIFICATION, OR F THE ORIGINIAL STAKING ISDONE BY OTHERS, RIDGELIFE ENGINEERING I \ `•,, <br /> ASSUMES NO LIM TIES FOR THE =78 INCURRED FOR THIS WORK WHERE IT HAS BEEN \ <br /> DETERMINED THAT ANY CORRECTIVE ACTION 'A8L REQUIRE FINANCIAL PARTICIPATION BY - <br /> RIDGELINE ENGNEEyNG, THAT AMOUNT SHALL BE AGREED TO BY RDGEUFE ENGINEERING N \ <br /> WRITING PRIOR TO TAKING CORRECTIVE ACTIOI FAILURE TOOBTAIN 'ARuiTEN ACCEPTANCE BY — _ — — — �� \ u 1 <br /> PDGEUNE ENGINEERING WILL NEGATE ALL REQUN9JENTS OF OUR FINANCIAL ASSISTANCE. — — — 221,1 <br /> 10. RIDGELINE ENGINEERING HAS EXERCISED A REASONABLE AND ACCEPTABLE STANDARD OF CARE <br /> IN THE PREPARATION OF THESE BINS. HOWEl4Ii, THE DESIGN PROCESS INCLUDES ACTIVMES ` 9BBY Zt' 00'E <br /> OCCURRING AFTER RAN SIGNATURE THESE ACTIVITIES INCLUDE CALCULATION, PUN CHECK 2 !' <br /> AND VERFDATIONS WRING TE CONSTRUCTIOI, SXOLAT) PERSONS OTHERTHAN RMI NE <br /> ENGINEERING PERFORM THE CONSTRUCTION STAKING OPERATIONS. THEY SHALL INDELTUFY (D KEYNOTES: 3 <br /> THE RDGEUNE ENGIN EE RING FROM ANY DAMAGES RESULTING FROM FAILURE TO PERFORM <br /> THESETASKS ORANY EXPENSE OR DAMAGE RESULTING FROM OMISSION OR ERROR CONTAINED 1 (E) WELL <br /> s <br /> IN THE PLANS WHICH WOULD REASONABLY HAVE BEEN DISCOVERED AND CORRECTED BY E ENGINEERING, 2 (E) WELL 1504BUFFER <br /> 11. RALLAPNFLICABLE CLEANOUT$. VALVE BOXES, PULLSOXES AND PELATEDAPPURTERANCE 3. (E) 16' WDEASPHALT ROAD PROJECT ND.: 22E-022 qq <br /> SUBJECTEDTO VEHICULAR WHEEL LOADING SEOUL BE CONSTRUCTED WTH A TRAFFIC IHM 4. (P) MOBILE HOME LOT PER DETAIL 2, SHEET CI.1 \ DRAWN BY: MA s <br /> LOAD RATING. 5. (P) RV SPACES PER DETAIL I \, SHEET C1.1 / CHECKED BY: JB RN gI <br /> 12. THE CONTRACTOR SHALT. NPLErENTSMLP.T000NTROL ALLSOL AND DUST FROM LEAVING \ LLLJJI DATE: to 1=Z 3166 <br /> THE SDE \ <br /> SHEET NO.: <br /> ci A <br /> SHEET: 3 OF 7 <br /> 22[022-CI .O-9b.Eeq ARCH D 21X35 <br />