Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5 . MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TLS -350 336 . 02 <br /> Attach the post-certification reports if the monitoring system is capable of generating Yes No NA <br /> either; ® Monitoring System Set- up © Alarm History Report <br /> All monitoring equipment is operational per manufacturer' s specifications ? <br /> Secondary containment systems are free of damage , debris , or liquid ? <br /> Are the audible and visual alarms operational ? <br /> All sensors have been : 1 ) visually inspected for wiring kinks , breaks and residual <br /> buildup on floats ; and 2 ) tested for functionality and confirmed operational ? <br /> Are all sensors installed to detect a release at the earliest opportunity in the <br /> secondary containment? <br /> The monitoring system set- up was reviewed , and proper settings confirmed ? ® © r] <br /> Was the monitoring control panel ' s backup battery visually inspected , functionally © rl <br /> tested , and confirmed operational ? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under. <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system fails to operate or is electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release ? Which sensors initiate positive shut down ? © Q <br /> Check all that apply) ® Sump 0 UDC <br /> If monitoring system alarms are relayed to a remote monitoring center , is all <br /> communication equipment operational ? <br /> Describe all answers marked "No " or "Fail" and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />