Laserfiche WebLink
(4 1" CONDUITS <br /> a. <br /> NOTE: <br /> TO BUILDING r WHEN END-TQ-END LAYOUTS ARE USED, CLIENT: <br /> g 5 6 POSITION THE TANKS SO THAT THE FILL WHEN WORKING BELOW GRADE, EXTREME CARE MUST BE TAKEN TO ASSURE WORKMEN <br /> LOCATIONS ARE FACING ONE ANOTHER, SAFETY. SLOPING AND SHORING SHALL BE PROVIDED TO COMPLY WITH OSHA <br /> PROVIDING MIN. DISTANCE BETWEEN FILLS Q CONSTRUCTION INDUSTRY STANDARDS 29 CFR PART 1926 SUBPART P, OSHA <br /> TO FACILITATE TANKER DELIVERIES. STANDARDS-EXCAVATIONS: FINAL RULE OCTOBER 1, 1989. HARDHATS SHALL BE WORN <br /> BY ALL WORKMEN OPERATING IN EXCAVATION OR WHERE OVERHEAD WORK IS <br /> PROGRESSING. <br /> 4 4 A TANK ANCHORING REQUIRED WHEN A HIGH WATER TABLE IS ENCOUNTERED OR IS <br /> o REQUIRED BY LOCAL REGULATION. CONSULT WITH OWNER'S REPRESENTATIVE. <br /> 2'-p" v 23'-8 1/2" 2 _0" 37'-5 1/2" 11 2'-0" INSTALL DEADMAN ANCHORS PER TANK MANUFACTURERS INSTALLATION INSTRUCTIONS. <br /> 0 14 DIMENSIONS OF MANUFACTURER SUPPLIED DEADMAN FOR 10' DIA. 15,000 GAL. TANK <br /> 8 5 14 ARE 18"x8"x14'L, QTY: (4) EACH TANK. DIMENSIONS OF DEADMAN FOR 10' DIA. 20,000 <br /> "co 44 54 GAL. TANK ARE 18"x8"x18'L, QTY: 4 EACH TANK. <br /> 4 5 44 54 4 54 20.000 UNLEADED TOTAL LENGTH OF FIELD CONSTRUCTED DEADMAN IS MIN. 12" GREATER THAN OVERALL <br /> 4 15 �_ LENGTH OF TANK. <br /> Q6 EACH TANK REQUIRES DEADMAN ON EACH SIDE. <br /> 5 Q HOLD DOWN STRAPS ARE REQUIRED FOR 10,000, 12,000, 15,000, & 20,000 GALLON <br /> \\0o 8 6 7 TANKS AS SPECIFIED AND SUPPLIED BY TANK MANUFACTURER. <br /> O <br /> °(�°❑°010 ��° �; LOCATE STRAPS ON RIBS WHERE INDICATED ON TANK. <br /> 12 <br /> 00 FASTEN WIRE WITH AT LEAST THREE CLAMPS AROUND DEADMAN AND THROUGH THE ARCO <br /> 151 60 9Q END POINT OF THE HOLD DOWN STRAP. CLAMPS SHALL BE ALTERNATED 180° FROM <br /> 16 1 EACH OTHER. E?l;" T COAST FIRM=LLC <br /> 4 4 ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES. UNIFORMLY TIGHTEN <br /> 15 55 TANK SLAB1 p ALL STRAPS TO ACHIEVE EQUAL TENSION WITHOUT TANK DEFLECTION. MEASURE TANK <br /> 17 <br /> DIAMETER BEFORE AND AFTER TIGHTENING STRAPS TO ENSURE NO TANK DEFLECTION. <br /> 1 2 3 4 <br /> 11 WIRE ROPE MINIMUM DIAMETER 1/2". <br /> 1 50 59 14 <br /> I 14qp <br /> N 1 1 <br /> 12 TURNBUCKLES: HOOK TYPE — 1-1/4" DIAMETER, JAW TYPE — 3/4" DIAMETER, <br /> EYE TYPE — 3/4" DIAMETER <br /> 13 z �- 44 54 _>=z w w o 50 59 D_ w o' n_ _J -i w 5 16 = z V^ to D' w, 44 54 { <br /> O � O O wC9 -� QO <t0 � -� w0 <br /> m Q w U- >7) 0,,� o U a_ V)o LL < z 13 COAT ALL EXPOSED STRAPS, CABLES, TURNBUCKLES, AND REINFORCING BARS WITH <br /> ''' `t 1=Z t=z Q Q o> -'v PITCHMASTIC. <br /> o w >t-Ow O J (n0 (n0 O >�Ow O <br /> Z -U)oz wZ Z J �� Q_'� J -(n0Z �UI- J 0 <br /> m w 0 z w z m z v¢ 0 0 14 INSTALL USTs SO THAT TOP OF TANKS ARE AT SAME HEIGHT. o <br /> 0 z z Imo- mo�� �z 0 o m v-'i �9 <br /> I— Q oz _ Ld <br /> ~ N<a z <<z `"o m o IN UNSTABLE SOIL (AS DEFINED BY SOILS REPORT) THE DIMENSION MUST BE 4 FT. <br /> ��? �Qw �m � z 4 4 15 18 4 5 9 <br /> �- » NOTE: 15 FROM BOTH SIDES AND ENDS (WITH FIBERGLASS TANKS) ENG' <br /> TANK STATIC x > z 2" INSIDE 3" STAGE II <br /> w 9SEE 0 INSTALL 6" WIDE DETECTABLE UNDERGROUND <br /> GROUNDING w ov D ¢ PRODUCT LINES 3" INSIDE 4" FRP MARKING TAPE EMPIRE MAGNATEC #31-143 FILTER FABRIC (DUPONT TYPAR OR MIRAFI 500X) IS REQUIRED FOR WET HOLE <br /> SYSTEM m 0 �' TO DISPENSERS TO DISPENSERS " 16 INSTALLATIONS. FABRIC MUST EXTEND TO SLAB AND MAY BE PINNED TO SIDE OF 18215 72ND AVENUE SOUTH <br /> L > BURIED 6"-12 BELOW FINISHED GRADE HOLE WITH WIRE, ETC. SEAMS MUST BE LAPPED 1' MINIMUM. <br /> Q (TYPICAL) WHERE UNDERGROUND PRODUCT & VENT KENT, WA 98032 <br /> PIPING RUN (425)251-6222 <br /> 5- TANK INQ �o ® �� y MEW BLENDING <br /> NOTE: (425)251-8782 FAX <br /> END TO END ®� ALL PRODUCT, VENT AND VAPOR PIPING CML ENGINEERING, LAND PLANNING, <br /> SCALE: 1/4" = 1'-0" SHALL BE PIPING BY SIZE M THOVER SIZE FI ERCASTFIBERGLASS SURVEYING, ENVIRONMENTAL SERVICES <br /> NOTES UST WSTALLAT� No. DATE REVISION DESCRIPTION4. <br /> ® <br /> 2 <br /> NOT USED. <br /> O SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN. 3 <br /> LAYOUT TANKS & STAGE II VAPOR RECOVERY PIPING SUCH THAT THE <br /> OFIBER REINFORCEMENT TO BE USED. PREMIX UNIFORMLY THROUGHOUT STAGE II PIPING DRAINS & ENTERS INTO REGULAR UNLEADED TANK <br /> CONCRETE. FIRST W/ 3" CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS. <br /> OREINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" 1 p BALL VALVE ON MANIFOLD LINE TO REMAIN OPEN DURING NORMAL <br /> FROM SURFACE. OPERATION. <br /> 11 <br /> REINFORCE CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" NOT USED. <br /> IN LENGTH. PLACE REBAR 6" FROM SIDES OF BOX. <br /> TO ABOVE GROUND VENT RISERS, SEE DETAIL ON SHEET G.0.6.2. <br /> Ag <br /> SINGLE 1" CONDUIT TO EACH SUBMERSIBLE PUMP. PROVIDE SEAL-OFF <br /> AT SUMP & BUILDING WIRING TROUGH. CONTAINS LINE VOLTAGE WIRING. TANK PAD MINIMUM 2'-0" OFF OUTSIDE WALLS OF TANKS, AND MUST COVER THE <br /> ALL CONDUIT PENETRATIONS MUST BE MADE WITH ROBROY PVC COATED CONDUIT FOOTPRINT OF THE TANKS. REQUIRED TO PROVIDE FOR PROPER TANK HOLD 91 <br /> ONLY. DOWN, AND TO PREVENT ACCIDENTAL DRILLING INTO TANK. <br /> CUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE z Q <br /> 14 SEAL: <br /> ONE 1" STANDARD MONITORING HOMERUN CONDUIT TO EACH TANK. FOR CORNERS WHERE MEETING CONCRETE. <br /> STANDARD MONITORING DEVICES, LOOP CONTAINMENT SUMP SENSORS, FESS/ <br /> PLLD, VAC SENSORS & TANK GAUGE TO TANK INTERSTITIAL SENSOR 15 DIESEL OPTION USES JUST ONE PRODUCT LINE TO DIESEL DISPENSER. ® ®�,q <br /> M. <br /> LOCATION AND HOMERUN TO BLDG. PROVIDE SEAL-OFFS IN BUILDING & �� <br /> PRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO INTRINSICALLY SAFE REFER TO DIESEL UST INSTALLATION DRAWING FOR STAND-ALONE UST C-2 C-) <br /> C>�� <br /> TROUGH IN BUILDING. CONDUITS SHALL CONTAIN ONLY LOW VOLTAGE 16 OR AS AN EXTENSION TO THIS UST DESIGN. <br /> WIRING FOR SENSORS. ALL CONDUIT PENETRATIONS MUST BE MADE WITH <br /> ROBROY PVC COATED CONDUIT ONLY. SEE SITE SPECIFIC PLANS FOR ACTUAL TANK SIZES, <br /> PLACEMENT AND 9 <br /> QORIENTATION. FINAL SITE SPECIFIC TANK LAYOUTS SHALL BE APPROVED <br /> BY THE LOCAL DISTRIBUTION TERMINAL MANAGER OR HIS AGENT. FINAL <br /> USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN LOCATION SIGN-OFF SHALL BE DOCUMENTED. <br /> OYa" & MAX OF X" IN SIZE, FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. C j V 1 �� <br /> ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S & OWNER'S 18 REFER TO SITE SPECIFIC PLANS FOR ACTUAL PIPE RUNS & NUMBER OF �E` ® iF®� <br /> FIELD REPRESENTATIVE. PRODUCT LINES (1 OR 2 PER UST SUMP). F CA_ <br /> ASPHALT AND STONE PER <br /> ASPHALT & STONE AS PROJECT SPECIFICATIONS <br /> SPECIFIED BY PROJECT 14 <br /> SPECIFICATIONS EXTEND CONTINUOUS ro <br /> FILTER FABRIC TO SLAB <br /> NOTE- <br /> �/ SLOPE DEVELOPMENT INFORMATION: <br /> 16 FILTER FABRIC OR USE SIDES OLE <br /> SHORING FOR ALL <br /> TANK EXCAVATIONS IN ARCO H fl <br /> 15 ACCORDANCE WITH OSHA 1926 <br /> \\� „ / SUBPART P, OSHA STANDARDS 3= am/pm <br /> 2 10 -6 2 /\// - EXCAVATIONS; FINAL RULE <br /> UEL CANOPY <br /> \j MIN. MIN / // OCTOBER 1, 1989 <br /> 3rd LIFT OF PEA <br /> GRAVEL TO TOP OF <br /> 7 8 13 /\\/ — — /\\/� TANK <br /> SITE ADDRESS: <br /> o X _ ° \ `V 2nd LIFT OF PEA GRAVEL �A <br /> 1st LIFT OF PEA GRAVEL FACILrTY 0. TBD <br /> 1'-oar MIN: ° \\� iv BED <br /> DESIGNED BY: AWANCE Z&DM: <br /> AL <br /> i\\ \\\/��/\�\/� �®v <br /> 2 3 4 5 6 MIN a�E <br /> 10 12 ov BP REPS: <br /> 6" MA>. FILTER FABRIC ON 18„ DRAM BY: AL AWANCE PM: <br /> 18" BOTTOM & SIDES OF A VERSION: <br /> TANK HOLE (WET 16 11 V-12.0 PROJECT Na <br /> HOLE ONLY) 7 1'—O" MIN. PEA GRAVEL 12/14/2015 �� � <br /> OTE: NOTE: INSTALLED OVER COMPACTED SOIL. DRAWING TITLE: <br /> ALTERNATE ANCHORING BY USE OF DEFLECTION MEASUREMENT BEFORE & AFTER IN WET HOLE INSTALLATIONS, <br /> A CONCRETE ANCHORING PAD IS TANK INSTALLATION SHALL BE ACCORDING TO INCREASE TO 18" MINIMUM PER UST INSTALLATION <br /> PERMITTED. CONSULT WITH MANUFACTURER'S REQUIREMENTS AND SHALL MANUFACTURER'S RECOMMENDED (1) 10'01OK& (1) 1V0 20K <br /> OWNER'S REPRESENTATIVE AND BE WITHIN MANUFACTURER'S TOLERANCES. INSTALLATION GUIDELINES. BLENDING <br /> SUCH SHALL BE INSTALLED ALL INFORMATION SHALL BE COMPLETED AS ®���� ����� � ����� <br /> ACCORDING TO MANUFACTURER'S PER THE MANUFACTURER'S WARRANTY <br /> RECOMMENDATION. DOCUMENTATION. <br /> SHEET No: <br /> 0 TICAL TANK ANCHOHNG DETAIL <br /> SCALE: 1/4" = 1'-O" NOTE: INDICATES ITEMS FOUND ON MATERIALS <br /> 8LIST SHEETS M.5.3.01 & M.5.3.02 Mm5m3i,8 <br />