My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
1600 - Food Program
>
PR0542138
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 5:17:38 PM
Creation date
1/12/2023 8:27:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0542138
PE
1617
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIENT: <br /> GENERAL NOTES <br /> A. SEE GENERAL PROJECT NOTES T1.1 <br /> B. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL FLASHING AND <br /> FOR ALL ROOF EQUIPMENT CURBS. <br /> C. GENERAL CONTRACTOR RESPONSIBLE FOR FURNISHING AND LOCATING ` <br /> ROOF TOP EQUIPMENT. <br /> D. SEE STRUCTURAL DRAWINGS FOR COMPLETE NOTES AND STRUCTURAL <br /> FRAMING DETAILS. �� <br /> E. REFER TO TYPICAL WALL SECTIONS FOR DIMENSIONS AND MATERIALS. <br /> ,YT <br /> 01 01 01 <br /> A4.1 A4.1 A4.1 <br /> PRE–FINISHED SHOP PRE–FINISHED SHOP PRE–FINISHED SHOP <br /> FORMED METAL COPING FORMED METAL COPING FORMED METAL COPING ARCO <br /> — BP WEST COAST PRODUCTS,LLC <br /> +2T.0.1 PARAPET I T.0.1 PARAPET T.O. PARAPET <br /> ±2 1_10 A. <br /> THREE COAT CEMENT PLASTER <br /> s/s" HARDIPANEL SIDING OVERI I ( ( OVER METAL LATH OVER (2) <br /> 30# FELT OVER SHEATHING %s" HARDIPANEL SIDING OVER LAYERS WATER RESISTANT ROOFING MEMBRANE <br /> 30# FELT OVER SHEATHING BARRIER OVER SHEATHING OVER SHEATHING <br /> REGLET AND COUNTERFLASHING <br /> REGLET AND COUNTERFLASHING <br /> WRAP MEMBRANE UP WALL AND CANT STRIP11 <br /> � <br /> TERMINATE BEHIND FLASHING WRAP MEMBRANE UP WALL AND <br /> TERMINATE BEHIND FLASHING ROOFING MEMBRANE OVER Q� <br /> CANT STRIP PROTECTION BOARD OVER RIGID ®�� ANG <br /> CANT STRIP <br /> INSULATION OVER SHEATHING <br /> J – CHANNEL <br /> PRE–FINISHED 22 GA. <br /> ROOFING MEMBRANE ROOFING MEMBRANE KENT, WA 98032 <br /> 18215 72ND AVENUE SOUTH <br /> METAL FLASHING <br /> OVER PROTECTION BOARD OVER PROTECTION BOARD (425)251-6222 <br /> OVER RIGID INSULATION OVER RIGID INSULATION (425)251-8782 FAX <br /> OVER SHEATHING OVER SHEATHING <br /> CIVIL ENGINEERING, LAND PLANNING, <br /> u SURVEYING, ENVIRONMENTAL SERVICES <br /> STANDING SEAM <br /> NO. DATE REMSION DESCRIPTION <br /> ROOFING, SEE <br /> STRUCTURAL FOR o�/1B/Is BUILDING PERMIT SUBMITTAL <br /> CONNECTIONS BEAM, REFER TO N <br /> MONO TRUSSES, STRUCTURAL PLANS z <br /> SEE STRUCTURAL <br /> FOR FRAMING <br /> 3 <br /> 2x4 BRIDGING, SEE <br /> STRUCTURAL PLANS <br /> 2x LEDGER, REFER TO <br /> STRUCTURAL PLANS <br /> 12'-0—A. <br /> B.O. JOIST Qi <br /> WEB JOIST, REFER TO <br /> STRUCTURAL PLANS <br /> BEAM, REFER TO A° <br /> STRUCTURAL PLANS <br /> �-1 2x FIRE BLOCKING <br /> SEAL:- <br /> " <br /> B.O. CANOPY WINDOW HEAD <br /> {' OF C�q4; F. <br /> 5/8" GYPSUM BOARD � DANIEh`BRIANO�� <br /> " OVER 2x10 ROOF JOIST G I LIMN 7 <br /> 2 MIN WIDE CONT, W/ BATT INSULATION <br /> SCREENED VENT `b-1 8865 <br /> THREE COAT CEMENT PLASTER CLEAR ANODIZED n, REFI. 8/31/97 <br /> OVER METAL LATH OVER (2) ALUMINUM STOREFRONT USED ARCS\ <br /> LAYERS WATER RESISTANT <br /> BARRIER OVER SHEATHING <br /> THREE COAT CEMENT PLASTER <br /> f J OVER METAL LATH OVER (2) 5/8" GYPSUM BOARD <br /> LAYERS WATER RESISTANT OVER 2x6 CEILING JOISTS, <br /> BARRIER OVER SHEATHING SEE STRUCTURAL PLANS <br /> 5/8" GYPSUM BOARD 5/8" GYPSUM BOARD — <br /> OVER 2x6 WALL FRAMING OVER 2x6 WALL FRAMING <br /> W/ BATT INSULATION W/ BATT INSULATION <br /> DEVELOPMENT INFORMATION: <br /> CLEAR ANODIZED <br /> ALUMINUM BAND ARC® NTII <br /> BEYOND, MATCH <br /> PREP WDW LINES 3000 am/p[ <br /> ALES <br /> FUEL CANOP ( <br /> w/ 6 M P ID's <br /> WINDOW SILL <br /> SITE ADDRESS: <br /> C% <br /> 5/8" GYPSUM BOARD ESCAWN AVENUE <br /> 8 OVER 2x6 WALL FRAMING <br /> A4.2 W/ BATT INSULATION @ HIGHWAY 120 <br /> ESCALON,CA <br /> SIDEWALK, REFER <br /> TO CIVIL PLANS FACIILIITY # TBD <br /> CONCRETE SLAB, REFER TO `- CONCRETE SLAB, REFER TO CONCRETE SLAB, REFER <br /> DESIGNED BY: ALLIANCE Z&DM: <br /> STRUCTURAL PLANS STRUCTURAL PLANS ( TO STRUCTURAL PLANS CHECKED BY BP REPM: <br /> a,— " �,— " O�— DRA BY: ALLIANCE PM: <br /> ° II FINISH FLOOR ° <br /> 'oil <br /> All FINISH FLOOR II a 4 Q a 4 ° FINISH FL00R VERSION: ® PROTECT No- <br /> ` ` ` ° _ II II — — — — a a p a II ° ° 17223 <br /> 0000a II — — — ° 000 — — _ a 0000000om 0oa000 <br /> 0 0 0 0 0 a I— I ovoovo all �I ' — fl o Q o� o o a II °a o ov000000000000 DRAWING TITLE: <br /> I {—III=III=� I � <br /> C I 1=11=' WALL <br /> FOUNDATION, REFER —I i FOUNDATION, REFER <br /> FOUNDATION, REFER ° <br /> TO STRUCTURAL PLANS a TO STRUCTURAL PLANS a a a E` <br /> I <br /> ° ° I II�) a- Q a TO STRUCTURAL PLANS <br /> SEMONS <br /> 4 .a <br /> SHEET NO: <br /> 01 L 02 WALL SECTIONWALL S TI ON <br /> SCALE: 3/4"=1'-0" – SCALE: 3/4"=1'-0" – SCALE: 3/4"=1'–O" A3m3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.