Laserfiche WebLink
CLIENT: <br /> Q� The Contractor shall submita lotter stating thal�he has revrl.oWed all conditions.of in I tonad <br /> fn�staljafflon:Oetos Rd thating.tedla I is in c m ­ stalar n 4. :Misoellaheous sheat matel.Accessories, :10a JOINT SEALANT RACKING A. Site Verification,of Condition%Morify substrate boticlitiont(which have been,provlout)V installed,under <br /> A.. Mop . o. pif.qnp��*th�manufacturemrecommeridatons. Alsothat . Water block seal shall be corn atibi a rid m <br /> P" pterals,With,Wtaph It Is usodand furriishod by emorribicari <br /> C. FAbricatoexteriordoors,panel ,a.. ot.hersecifons)are accepUblefoir productinstpli0on Imaccordance,wi .anufa.c.tu.reft Instructions. <br /> bp <br /> All materials uaod for the roof installation are acceptable to the roofing manufacturer. manufacturer, 11.02 �PROJECT CONDITIONS A. Provide..sealant backings.of material and iypewhichare nonstaining;areumpialible with.joint a.ub.strzites, Close top.andottom e4gesof extedordoors,As,integral part.of door construction,or by addiftonef Verify openings are.sized to receive storefront sstemand air plate is level inc.c.ordence with <br /> sealants,primers and fter�jointflftom%And are approvedforapplioations indicated by sealant minimum 10 gauge Inverted a"!channels <br /> 1,04 QUALITY ASSURANCE 0. atten strips shall be compatible with materials with which It is used and'furnished by the membrane A. Coordinate work of this section with interfacing and adjoining work for proper sequencingof each, manufacturer based ion field perience,and laboratory testing. 1, field:Measurements,Verify actual measurements/openings by field measurements before <br /> manufacturer. inatg1l.afroh.Ensure best possible weather resistance an d ra Ilit ma algon D� Exposed fastehery unless otherwise indicated 0.e co ntersunk Aal or ovalheads for OV Coordinate field measurements,, <br /> d u b yofworkandprot" tell 1 1 <br /> of <br /> .o f cation:show recorded m a ure nts.on$hp 0 <br /> 000 screws A. Apply,roofing system using a roofing contractor authorized by,#is oofin manufacturer. finishes, rmed,com ess b e,resli -of ftotile, <br /> B. PI foarnjoirtt fillerw.Preto pr R I !ant,nonwxi and bolts, f cation schedule with construction progr%is-tq PWd construction delays, <br /> P. Prefabricated pipe flashing shall be,.QornpatiblovAth�meite.rialowtih.whfr. i0sWodandifurnishod.bythe indi go <br /> of mallen WWdtlia.low,.n,onobs.brberitto:wat6r!a.rid as.;andftize,sho.po <br /> 0. Rpoifing system shall be�dasslflocf byUriderwri rnaterialfDruse.in merri rane:manu cturer PART 2-PRODUOTS: anddensilytD control sealant depth an otherwise cottributetoproducin op :."Alan <br /> fa d perform <br /> fimum nco.. E. Thermally rated(ins ill n assem <br /> g N.g blies:atexterilo [Qcationsa oft a shown orschedu.d., 3. <br /> c ewhere,a 1p, <br /> onstruction,of ClIess A rocifitna assemtifiea� Either open cell polyureilharre foam or.closed ff polyethylonefoom,unless othetwise,indicated,subject to h <br /> provide doors fabricated.as them-of insulating.door and frame assemblies and tested..in Accordance wit <br /> 0- A41o.hor components(patent pending�shalf be furnished and used as specified by the manufacturer. <br /> ZOI HEET METAL FLASHING AND TRIM MATERIALS approval oftealarit manufacturer,for.cold appliedsealants only. ASTM C 236 or ASTM 0 976.1 on fully-Operable door assem4110s, A. <br /> ;C. inspection'Upon completion of the installation,an inspeollon.shal[ltie made by the manufacturers General I nstoll storefront systems plumb,level,and true to line,Wthout.warpr rack of frames:with <br /> I.. Provide thermally rated.as.semblies with U facto.r of 0.41 BTUI(hr xsq:ft x0s.ig F)�Oretler manufactUrees,prescribed tolerances and installation.instructions.Provide stipportand anchor in plae� <br /> ropresontativetoasce intholth to rig membranes stem:has been Instlled According to the R� MetallicTermination Oars shall bymembranomn4ractuter, A, Zimcoated steel;corn Fdal q y with 0.20 percent co ASWA.626 It A0_ A 0 tyi 0 .1 W49 f TM Q 1056, <br /> ppe 527 ib ck- <br /> rM rl 0, Elastomeric tubing:jo s:neopretie,liu EP M,orsliconetu com yingwith AS <br /> idose ral rces f corrosion o <br /> a 0 from su o r <br /> manufactur,ees�appro.ved-speciffoaflons and details. Upon approval ofthe Prefect,a Warranty-shall be forming,G.9.0 hot-dip,galvanized,mill phosphatizedwhere Indicated for n n I <br /> painti.g.G.W594 ch1h ck f12G �nonabsorbent to water-and gas,capable of remaining resilient a temperatures%down-to-26 Deg�F(45 F. Hardware preparatlow prepare doors:and.frames ta receive mortised andconcealed hardware In electrolyticactlon.contactipoints.. <br /> writto.n. Protective.Matz b.y membrane.Manufacturer shall:be.installed unOorme gnicalpipinglafockin , gage)except as otherwise Indicated. :Do 0).Pro w com salon set and of ki <br /> ch size: n!shape toprovicte a woonclar Awordnce with final door hardware sch yhrd revuplp oomofvwith [ A nstal_1 ionag vida pr0ocW wM., pre ay.so0j�to edula and templates,provt d;b we p ight Construct o.:1. .. I all m mbom and other members in a bed of sealant.or with loint <br /> control sea(antdepth, nd otherwise contribute.to.optirii urn sealant perfonnance, applicable requirements of ANSI al 15 series specifications for door anci frame -tion for hardware. <br /> fillar.or gaskets to provide woothertight constructon.Coordinate.installation with.wall flashings and <br /> 6 ildth6tabe devot s� rchange <br /> h..V � torio $:from this a eciffeat writte "ll tre furnished and installed as specified by membrane manufacturer. p <br /> T. Walkway Pads a 8. Solder; B 34 <br /> rvid.0.50-501]. leadsolder,�ASTM :i6ft rosin.flux otherco. onen ofoonstruction. <br /> manufacturer and the.Architect of Record the roofing systemis not authorized for Installation and is not is 0- Bond,breaker tape*..polyethylene tape or other plastic tape aarecommanded by sealant manufacturer for G. :Locate.hardwa finaf shop.drawings or,if not indicated,in accordance with: a. Refer to Division 7 Joint Treatments(Sealants)for ins flatio requirements. <br /> re as.indicated on In n <br /> lellgitito for W.irratity mverage. 2.02 ROOF INSULA <br /> 31ON <br /> Fastehos:tarro�Metal As flashirwshoet Metal or other nohwtorroolvt metal as recomma clecl.by stwat ahlings �ftoiti Igicl,inforable joint fillor Matterfals or joint surfaOsat back of joint, "Renornmended Locations.for Builders Hardware.on Standard Steef Doo andFram6s,"Putills, <br /> manufAc.turer,Match finish of exp I osed headswith r ,lerial bein n. prev I Oalant .adhOong to r beO by the <br /> V g lastered, whereamphad0ealo w ea t ri,pald result in a tan failure.Provide self adhesiVe tape where applic le. O'Har4ware.institute, <br /> Door an B. Related,Products!nslaftation.Re Larements: <br /> E. All sealer,priffierond:adhesiye products ftit.ni!§he.d;shWl,,00rnplYWth�tholo.CjOt A. Roof insviatloh.shall be ri id pOl.)6sOOyAilUtate:Mcif-irisUl��on,vAth a MinarntAftlithickness and with a ... ..q <br /> 'ju 11 Sealants.(Perimeter)p Refarlo Div. <br /> Compliant for thabuilding,I"Im noh n s rinn..,nor 1 non Igragn.0 gellan't. 00ap,treat,And point exposed surfaces.orstoet doorand including galvanized Z Glass:,Refer to.Division.8 Arid GI) in on <br /> mintmium"W value after aqfng�In accordance with RICITIMA procedures as indicated on the Contra D�, Mastic soalant�polylsobutylow, ard-ening oil 10 1 9 i-dryhgt m .2.04, MISCIELLAN15OUS MATERIALS Ad%L <br /> Sh P*Painting 0Z .9 Pjaffings. Polylsocyanuratestiall haveatypical r=ipresalve strength of 20 psi. Polylsocyanuraite roof surfaces,Clean steel surfaces of mill spate,rust,.oil,grease,dirt,arid other foreign matertalabefore: <br /> insulation,shall meet Federal ocIfic0eonHH-fw1j012J2_CiasgI ULCI Arain an ractorymutual emoommerided by joint sealer in anufactutor where of alarrit to op <br /> 1.06 ELIVERY AND 9TQ.RAM , pr .pli;;ian of Paint Aho 'Reference.AN$[Zg7.1 CPSO 1,6-CF 1201 QANA.Glazing Manuel. <br /> E. Elasto io se lant,generic type recommended by manufacturer of metal arid fabricator ofconV. onents A. Plitmew, ovidlotyp se fin shed.Ai All ma Oft provided (17M),Class,lapproval. being sealed and complying with requirements for joint sealants as specified in DivisiorvT section"Joint joint substrates indicated,as.datermined from preconstruction joint seller substrate lests-and�fiakl tests. surface ready to receive.finish paint <br /> toe, by tho,-Membrane manufacturer shall be delivered With propriato 06ckadIh lab 1, 1.w Prov e in:44 locations. <br /> p id <br /> eaters.' feCoindica n a proprote warnings,sla. and usage instructions. 2� Provide 1 aglAtign At All prefoTmed curbs without floor <br /> g p y IhsWe0 insulation. R. Cleaners for nonporous surfaces:prqvido nonsta I g,Phomical.cl an of lypp,Whi hare accepjoblia to. L GfpA tv -removal) at -an se jjM e Q Aterior panels. <br /> in n e 1s. stop <br /> Ad.e.noq to opt . c sid i <br /> F; Adhes:ivew type recommended by.flashing eet manufacturer for Waterproof/weather-rastistant georraing Ant <br /> h. MO h jjat Provide screw Applied roMovabl#9OA09 'pg... A. F(6[dTesta-.Architeot.shallseleiagtor4afroritunitsto.be,tosted�asso as <br /> R It materials shall be delivered dry 1 m bOOds on inside of glass nals. on . 0.f-ppresentative.portion of the <br /> packagoand be property:slored.Off 8, Allinispipflon shall be mechanically faetenee eet the FM uplift requimmorlis Indipatecl on and a4boalve applicaron Of lahing sheet. <br /> Ito the deck to m nonporous materials,and w veolly residue or otherwisa:have a detrimental'affect on <br /> hich do not lea <br /> Project has been installed,glazed,perimeter Oulked and-cured,Conduettests for air infiltraffon And water <br /> e ground on pallets,minimum 4 high and off the,roof, ompletetycover all material with.canvas the roof plan. Additional fasteneirs shall.be located.as required to.or rinate P�spols in boards.., PART 3-EXE�CUITIO <br /> tarp '.,p int r, sealant adhesion or i-ser0ce perfOrmancei penetration with manufacturer's represeritafive present.Tests not meeting specified performance ARCA0`0 <br /> ayliris to proventth orkofwato a <br /> rusi m n <br /> Regletv,meta)units of type and profile icompatiblawth flashingin,410 n noorrosive. <br /> R's 940ficie.. as shall be epmactoo as.part of:the contract.amount, <br /> 0, Insulation joints shall.be 11.14�'-or l[assia-w. 0th. Repair all jointswider then 1/4"with Insulation, Stagger all 0, MaskJng:1Ape.*provido.rionstaiing,nonabsorbent type compatible withjoirit sealants and to surfaces 3.01 INSTALLATION I Testing:Testing shall baperformed by a qualifiedindepandent testing agency..Refer to.Division 1 BP WEST COAST PRODUCTS,LLC <br /> jolnts,:It two layers of insplaflonare installed to meot the required IRrvalue,the Joints between the two HI provide shoot metal dips,sapA,ancho n devices.,and similargecassory un as. <br /> its adjacentlojpInts. Testing:Section for payment of testf and testing roqojirements.Testing Standard Per AAMA 503, <br /> 1,06 CONTRACTORS OBLIGATION layers arelo be offset to improve he thermal performance,of the assembly. required for installation of-work,matching or compatible with m I aterial- eing installed,noncorrosive,size rig <br /> A. Install standard steel doors,firames and accessories in accordancewith final shop drawings, including reference to ASTM E 783 for Air Infiltration Testand ASTM.E 1105 Water Infiltration Test <br /> idrod.for p Coodpot.tests,In accordance with A-9TM E 185.Allowable Air infiltration <br /> orlorMance, PART, T WftUfActGrer!S data,and:As�herein 8�e Air I nfiltrallon Tests. <br /> �A. After award of contract and after all materials.methods and procedures for the workare approved a pre,- D. Broken cornertshall be cut out and replaced with sections of Insulation lar <br /> ge.enough to be supported on shalt not exceed 1.5 times the amount Indicated in.the perfonrnance requirements or 0.09 <br /> roofing meeting may be held At the site o include,the manufcturer and.the Foreman actually Assigned to two or Mo.no k flutes. comply with proOsIbrig of SO f66"Recommended Erectibn InsVocrons for Steel. ofirriff;whi ever is greater, <br /> 24Z MRICATP-D UNITS <br /> acinlhe�prqject. Thismeeting should bescheduled at or before the actual day the Contractor is set up to:start Frames unless otherwise Indicated.Install at:least 3 wall anchors per jamb at:hfnge and.strike levels. b. Water Penetration Tests�Conduct tests in accordance with ASTM E 1106.No uncontrolled <br /> -work, The project shall be reviewed With.the.Foreman,the specifications discussed,.and an.orderly and E. Tapared.roofinsulation where indicatedn.drawings)and neoersaary fill bordsfo.rminq all crickets A. Shop fabricate work.to greatest extentposable,Comply with details-shown and with applicable A. Exan-une joints indicated to receive.jointseaters,with Installer present,forcompfianca with requirements Attach.w`afl.anchors tostuds with screwsi water leakage is permitted when tested at a stato test pressure of two-thinittherapeolfted <br /> practice a reach to theproject aryl the probable weather during constructiOn resolved, betweeneacb soupper�crickets on the high sfde�of roof scuffle.crickets formed.-on.hl tr <br /> ig side of skylight requirements of SMACNA'Architectural Sheot'Matal.Manuail`A rjoin confl urption,instalfgrilon tolerances and other conditionso <br /> n01her recognized Industry practices, fo t g <br /> "for pene.tr0i n Pressure.but not less lha 624 <br /> n HVAC-units and allther roof penetrations.with curbs",as shown on roof Man shall bepolylsocyanurate: Fabricate.for waterproof and.w-eather�resi-stant.p.erformance,with.exponsion provisions for-runningwork. not proceed with installation ofjoint sealers unfit unsatisfactory conditions have been corrected. C�� Door installation:-fit hollowmetal doom accurately in frames.,:withinclearancies specified.in ANSIISO-1.0.0. <br /> ocifinsulation. moetf onsHH-1497212:06%Ian FactoryM tual(FM)Coast suffide uto,permonently preyoritfoakage,damage,Or deterioration ofthe work-F Upon Owners re <br /> d r u <br /> in, B, M6nufacturer's Field S ice <br /> sN ..r .quest,provide manufacturoes field service consisting of <br /> substitutes, It is understood And agreed:that-the,use of materials other than thosespecified or approved in approval. Taper Insultion to provide 114P per foot,minimum stopeat areasnoted as.crickets on roof plan. substrates.Comply.with material manufacturer instructions and recommendations for forming material, 3,02 :PREPARATION END OF SECTION <br /> product use recommendations and periodic site visit for inspection of productnstallation in accordance <br /> writing by the Architect of Record sh011.constitute,al�iolafionof the contract and the Architect of Formexposed sheet metal Work without exCessivecil--canning,buckling,onct tool true to 1. manufactureft iinstrucrons� <br /> ine and <br /> Recor /Owner shall have the right to require the removal-cif such materldlis at.the Contractor's expense. F. Insulation must be accepted in:writing by Roof Membrane ManulOcturer. levels Indicated,with exposededgies folded backto,form hems. A. Surface c4eantrig of joints:clean out jointsmmediately before installing.joint.sealerstocomply with 08410i-ALUMINUM ENTRANCES AND STOREPRONT <br /> 0 <br /> ropqrrimandatl lot seater Manufacturers. arid Cleariling <br /> ans.of <br /> 0 <br /> intractor Arid spboontractors shall eactiprovide a competent full tinle Forerngn on the project,who sb seams�Tim edges to be soameicf.form seams.. <br /> left Z03z ACCESSORIES B. Pabricatenonmovin seems,in sheet metal with flat <br /> be res g PART I-GENERAL <br /> ponsible.for giving instructions for installation of the Work. Contrac.for'sforeman or supenritendent -on- <br /> nd solder. R. joint pritning:pTiMeJoint, Indicated orwhore recommended by joint sealer manufacturer A. Protect .Prot insialledpr6cluoVs1hish surfaces frOm damage during construction.Protect aluminum <br /> abaft be approved by the Owner a d a At[be replaced on with his pe 's Wood nailors shall tie new pressure trep d IUmb r(Wolmantz <br /> ..n. h Contractor. foreman or A. te ...-e, #2 or better. ce.ApplypT <br /> n finer to comply wilhpInt 1.01 Summary -storefront system from Oama d <br /> go from giln.ftng And po b(n compounds,,plaster,lIM -me <br /> tsr.OprOsentthe.CbntTaotorin hi.absenc and all direclions�qjven tolhe Foreman.or =(d nt,or <br /> C. Expartsibaprovisions:where,tapped or hayonet*po expansion provisions in.work cannot be.usad.or seatermanufacturer a recommendations.Confineprimers to Areas.of joint seater bond,do not Allow other harmoul.conlarnanants. <br /> :S-Uperfintotiden sh.a1b bindin a If.givern:tOtheConfractor. S. f sulation,fasteners,and plates for:roofiraula on shall be by,roof membrane,u n <br /> _n s PpRora dshallmeetFM would not be sufficien :w 'rig pon <br /> fly .atertweatherproof,form exporision joints of Internieshing booked flanggs'pol: spiraga,OrAiligraron on.to adjoiriln a <br /> 9 surface A, S tt.orilncludev..Arrhite.atural.Al.uronumStorefrIon.t$,v..stem.s.,In.dudJ imetortrim stool,% <br /> ENG <br /> requirementsfor Class.I construction. less than I inch deep,tiled with mastic sealant(concealed wifftin joints). <br /> accessories,shimsand anchors,and perimterseeling.of storefront uraits, B. Cleaning.Repair or-replace damaged installed products..Clean Installed products in accordance,with <br /> D. Upon,pomple Ion of the roofing work.tovered by m <br /> h 'fidationo,thoAr itec <br /> pact W %(>rid sy perform g pe�us.eMao.WingtapoWhejrereqpirl�dtoprovent.onta ofsea t su . .. ...pta <br /> . . . ct Ian Ithp a <br /> rojol.nl rig� rroce manufacturer',- tons prior to owner's a0m fire Remove Construction debris from project site.an.0 <br /> -an inspection of the project prior to acceptance-of the Wor ny <br /> k1bytho-Owner. ifa. discrepancles are found C. Insulationprotection boarlshall.be7/16'onented strand board, -wood or equivalent. D� Sealant joint&*whe move le,nonexpansion type joints are indicated or required for proper performan which Otherwise would be perm r <br /> ly <br /> re. b <br /> e. anently.stained o damaged by such contact or Oy�qfeqrflng.methods B. Related Sections:. le <br /> du n gally,dispose of,debrist <br /> .rig the Ingpeolon,subsequent costarforthe Archl Ro.cordle.daternaMfInail cornpliancewith the <br /> of w an <br /> ork,lonrimetol to rowd for orooer installation of elastomotle seal th SMACNA :roquired to smears.kemovelapo Im I allortodfing.w! utbi Section 00000-Glazing: <br /> p I,in complibnoewl mediate <br /> apeoficatigns-will a charged against the Contractor. PART 3-EXECUTION. standards. Y. uOft gjdint lKENT, WA 98032 <br /> E. Wherever the word"Orfifipallons'qr"cerfiffed'o.c.curs;in the be dertied As A, 3�01 INSPECTIONS e. Separations:provide for separa#prip molat.from non 103 INSTALLATION OF JOINT SEALERS 1.02 SYVIOM Desch'..ollon EAD OF SECTION (425)251-6222 <br /> .two compatible metal or oiarrosivesubstratas by coating (425)251-8782 FAX <br /> statement m,to before allotary and.signed by a representafiveof the membrane.manufacturer making oncealdaurfaces at locations of contact,with bituminous:coatingor other permanent separation as. A. %C.-omplywith.,jo.intseol.er..man.ofactijr..er.elp.rinted,instat.Won.ir)stuc#onsappltc.able:to oductsand A. StorefirantsyatemPerformance Require.ments,, 0.8710-FINISH HARDWA <br /> pr <br /> .the statement thatthe.time.,sere or mpterial referred to conforms in all respects tq the roquirer nrls of A� All work shall be done to sall0floton of-the Owner or Ate f Record Mo shall decide,all questi t a h I <br /> on recommended by manufactorodfabricetor.. exce Wh to more stringent requirements apply. I., ir Infiltration.,The testspecimen:a a I be tested in corirdancovll�AATM.P 281,Nr infiltration rate <br /> the:spedficatiort , rtang to.Ithequality:4nd,adce CIVIL ENGINEERING, LAND PLANNING, <br /> ,plabillity-of.materials furnished,work performed inarinlrof L Elastomefic�sealant standerd.,ASTIVIC.96.2. :2 <br /> shall not exceed 0.06.cfrWft7 at a static air pressure differential of C 4 psf, PART I-GENERAL <br /> e.tote.of.progrossof the.w v Cia, ELASTIC-EXPANSION JOINTS ERVICES <br /> rk ntW ., .n <br /> 1. tioncifthe. rwi s,Specificai nd acceptable 2 Water Realstanow,The testspecimen:shall.bo4estied 1 <br /> F� The-Roofing ontractOr shall.take Oil precautions necessary,to avoldover stressing structural members fulfillment of the Contract Installation ofsealantbackings:Installjoint-fillers of-typeindicated.to.-provide support.of sealants dunn.g be.no leakag#at a minimum static air pressure differential of.8 asefinedi in AAMA.501. 1.01 SUMMARY <br /> Andior causing structuralda to improperly placingtoric �psf <br /> clue -fabricated urais of size.and profile indicate complete with pre bit ated ap I,..ant!at.position requ -and deoffisof installedsealants 9. U <br /> A. P ov!do factory d fa c corner plicat on [red to produce the,cros;s sectional shapes nWorm I-Oqd:'!A star r esign load of 2o.psf$flat[.be,Applied in the p itil, a 01 0 a v <br /> pai d egffe NO. DATE REVISION DESCRIPTION <br /> Bt in casef ofa d1wrepanoy between the:Drawirtgs:And SpociAimations,or ifanobviopsermr oromission in intersection unit andspi! materials.Provide complete with ela tic sh et fia hi forming the primary -sealant mover. ritcap4trifily, <br /> s. . e. .....a rig rela ve to int vAdths which Allow optimum <br /> e direction.in Accordance with ASTM E 330.There shair be n dappation in excess of L/ 7�pf the A. Fu ish labor and material to complete hardware wqrkIndicated as specified he n,or a may.be <br /> G. The Roofing Contraclarlqhall state thenom ItectoffRacord shall be Permitted to -corrb ons 0 in Vellatio b join Me. rano,inasu ppftod,'�be ber.of.businost..davgtetiUir.adfbtoo"16ii.b.ri.6f.thb:t Work eithor.th Arch mako s ch <br /> r to naasmay e ...flows' arMngernorit dest nod for securerronitto both sides of <br /> span of#nyfrarring Member-At a Structural tatload equal to 1;6 timesftspociflod design to ul <br /> ad req red by a0lualtondiftions at 01/18/16 BUILDING PERMIT SUBMITTAL <br /> building <br /> cry the:bid form. deemed necessary for the fulfill rrontof the intent.of the Or4wirrot aloSpecillpations. ados 11 rubber or -no _Z� <br /> pans!oir jointis,Un C. InstIallatiom Of sea a Install asplant0y proven tech iques thatresult inseall d ctly coritac n a-0 lass breakage,or p ne <br /> der insulated with aditesively-appred,rem e -ce M in.excess f air 0 aplastic not,loss thon.3/0-itiob thick. fully weltin0jointaubstratO,ponipletolyfillih.9 recesses provided forbach.joint configurations and $half.occur. B. The work in this section shall inclV40,the furnishinq of all Items,of finish hardware <br /> H, TheRpoling Co r shall ashereinafterspecified <br /> nts ire .y g n <br /> nts inthe.fira in rnem0er, 02% th.' r span <br /> Ma a oeof$300, O:W kiths.which allow.optimum s <br /> Intain an allow <br /> day ocoyer t.a <br /> -von questionssKaff Arise as1e the Jitterpretaff-ops of. f <br /> y C, Inthoe t <br /> the decision 01 providing.tiniftir-M,croatseotionalshaes and depths relativeo joint wi <br /> or obviousfy,necessty to com rig tems wh Are specifically excluded from <br /> ich <br /> costs laexcess.of stated number of days required tor oompletingroof-Wodc-, the Architect of Record shall.be:final. B. Type:rnotal flanged.edgs,3 to 4 inches wide,formed to profiles at Indicated to fitcurbs and designed tot :wvemebt capability. 1.04 Submittals thit section Of#16 specification. 2 <br /> A <br /> nailing to curb sub%lratp,Provide metal flanciesin the followingthicknesses, extonorjoints;provide appropriate"el"tonlelle- s0allnt� <br /> 1. Owner's construction coordinator willac.eivo�and pay for ll.tesfinglaboralory invoices directly. O� The Contractor shall promptly remove.from the premises all work condemn,ed by the Owners I Zinc-coated-stoeL.0.0179 inch <br /> (2 A. General:Prepare,,review,approve,and-submit specified submittals i.n:a=.rd.ance�,Mtb:"Co.nditions.of the 1.02 QUALITY ASSURANCE A3 <br /> ropraza tative as failing,to conform toltrev.Contra <br /> ct-whether such.work:has be porated into a D. Toolln onsa soalarlisimmAdfatat Oterseakinta 011ca oriand[priorto-Ames riningor rl ctiomProd at.dAta;shoo drawings,samples.,andsimilar. <br /> otConteacV and,bivisi <br /> 9 <br /> 1.0 -WARRANTIES�AND GUARANTI Of 'air 'a <br /> sbruclVre.ornot.. Prior to the gnp(p�ky.ment,.the.ContraQtorishalI replace and re�execule Any such workiln C. Loopedbell 5vswfdth .6 inches,exclus! a, -begin tool ealants fig r on in rpa 0 riate <br /> pockets,q0th,uniform bead$of con V at! ;J do to submittals Are,defined.in�Condlfions.of the.Contrvvi:V�Quality Aiisuranpe/Cqntrol$ubrrattala.. M Mate heroin a cified shall egital.*§h thestanoiard for the matert 1 used end shall be considered the, <br /> Accordance with.hilt contmot­Any such removal,repi.10cament Or r0wexecVtion Shall be.maide by the: and to ensure contact and Adhotion,of soalaril.with tides of joInt.RsmOveexqoss:s6aIaqts firom OV440 I.. TostRopcirtt:�Submit certified totraports showing:cOmplianbe With specified perfdrmancoi inimu ality acceptable. <br /> & Ypn successful completion,final inspectionAnd acapptypp. of the in a I I on, h e:follawri n g warrano es fiContractor without expense la the wn . ThoCor1trgctDrs.alI.a b artheexpenseofrripkin 9Q9dar D. Ma <br /> Wso_e pufacturers:subject to compliance with raq <br /> ui�I menta,provide products by one of the adjacent to joint,0.9 not use <br /> follpyAng, catihall be issued to.the Ownert d jr0--oxecution. <br /> work of other contractors,.destroyed or damage by such removal,replacement r I.. AFCO.Pro.ductsj.Itio. approv6d.by.sealaninlart <br /> afacturer. R, :Include Id <br /> all necessary.screws�belts,expanslomshie...s�o.th6rdevioe%4,,if.necossary,.ps required lbrpropr <br /> 1. The Roofing Contractor shall issue ,"full system warrantr two <br /> for a-petiod of (2),years from.date:.f 2.. Celotax Corporation I ProVide concave joint confi uration per figure,6afn ASTM_C Oa2,unless otherwise indicated. 1.06 Warranty hardware,application.The hardware su plier shall assome all rgspapsib1fifyfor cm <br /> ect quantiffe <br /> Grand Opening Under this warranty th p <br /> a Contractor shallremady any defects resulting from E. The Owner shall have the,right to.inspect,assess progress and vertify performance to Specifications. t an 3, International Permalite/Roo.fing Components Group.. <br /> 'y <br /> workmanship.in the roofing sy0em. Repairs shall:be me <br /> de by theConfractor at hiswn cost and time that the.work is.in preparation:or progress and the Contractor shall provide for such & anvillplRoofin .tems Division(#e4-4.). 3,04. 04EANING A, PrPlact Warranty�,Refer to'Conditionspi'the Contract.'for roe n ov n, A har0w ap J c.tw.arm ty pr laid a .11 are,shall mpe the requirements of federal,state and local.codes hg*g jun naver this <br /> keep roof I ri:a wate loop <br /> expense,,as may be.necessary to maintain; arranty and to rtight.conditiort. The inspection. S. York Manufacturing,Inc. <br /> project,notwithstanding ani:i real.cir apparent conflict there with in these specifications. <br /> roofing systomJs defined as Including All oon on from thereof de.oku sul.. A Clea A[ nt ors"lant sow <br /> ants: un off excess se at$adjacent to Joints as work <br /> a -Progress <br /> Os by methods and with a, Manufacturers Product warranty.A�Submit.for Ownet's 40ce la is . ter-swarraoWforstorefront. <br /> qcernanu. atu <br /> fasteners,membrane,lashings,adhesivesi sealants,and any�rrascollaneous Items required for a F. The Ownermay stop work when necessary to prevent nonconformance With the Plans and.Specificattons Z04 WARRANTY clearang materials approved by.manuthoturers of joint sealers and of products-imwhich.joints occur. system:as,follows: <br /> D_ Fire-ratiad*openings <br /> compIete Installation. and mayrejectall nonconfo ingwork and materials. TWO,(g)y <br /> ......I.. rM Wa Ped. eatsfrorn:Date Subtantial-Comp <br /> of dqon.ofthop provided f. Provide hardware fdrfirerat6d a nfn 1 c m iancewithATAI(NEI mphlet nd.,80 And <br /> roject pe <br /> 2 Theroofing membrane.manufacturer-shall'issue a membrane material warranityfor a period of ten A. All sheetmetal and lashings to have a 2 year material and workmanship warranty, however that the LimiledWarranly shall begin in no event later than six.months:fromate of NFPA standards no.80 ando.10.1.This requirement takes precedence over other reqmirements: <br /> �10)years from the.d9ta of Grand Opening. The manufacturor�%memb warrant s 11.0over the G.. Nothing in these.Specifications shalt be construed as plaidin, <br /> y_to q the w <br /> ork prider the direction or END:OF SE 10.19 <br /> CT shipment by ator0front system manufacturer.. f6r.stichbardware.Provide only hardware Which has beeri tested and listed byVI fbrthe topas-.atid <br /> :Membrane,flash n :ad eal splice tape,and sealants,aswella5l4bor cost to:re A v ervislonf therA -on <br /> ves, move ind! _p, rchitect of Record,orm.lieving the C tractor from his liability as an 19.4liqpendenAr fth the require -Of t 0oora 0oorfiramprijabelis <br /> full w sizes of doors required,and compile w; <br /> . �S . I he <br /> replo oofing Contractor's. nd,at such,he.shaltsuperylse an&cotrol hlg:ow. n personnel arid schedule hisworkas CU 1.06, QualityAssurarim. <br /> co:defective aterials. Prior to the-expiration of the R syste <br /> Warranty.,.theme q Manufacturer shall prvidea letter acce ing the mem ratio fpsiallation required to insure its properand fimelypqrformanep, SEAL <br /> mbran p.1 .08111-STANDARD STEEL DOORS AND FRAMU Et Where panic exit d <br /> and.confirming the additional.membrane coverage for upto ten(1-0 years fir.om the Grand Opening eviw4s are mqul*on fire-rated doorsprovift supplementary marking oq door ul labol <br /> 3.01 INSTALLATION REQUIREMENTS A. Quallficaffo= <br /> Indicating fire doorto be equipped witftfibeiaxlt hardware and provide ut label on exitdevice,indicating Ire. <br /> date, H,_ The Owner resorves the tight to requirie tha Contreaor 10v <br /> tploo of.the wo k.And repair the c is <br /> PART 1 GENERAL I, installer Qualifio.ations.:Installor experienced(�a date ed by contraclory to perform work of this exit hardwarov. <br /> 3 The insulation manufacturer shall,issue an-insufation.material.warranty.for a period:o.f ten(10)years OiF C <br /> X Comply with manufacturers installation instructions and recommendations and with.SMACNA section who hasspecialized In theinstaltation of work-similar to that required for thisproject and <br /> from the clate.of Grand Opening, Thorrianufactiuret's insulation Warta shplfcovar the 1 -The owner shelf hire toartng�laorator e eats: M111teeturo Sheet Metal manuall�enis asotheyWiseinO'ipatisd.Ao;�horuhitsotwork.securely,'Iii.pjalc*. I.()I SUMMARY 1AMOIsacce abletoprogluctmanullpturer, <br /> y_to�Oonduct th following t A pt 0 <br /> of 1.03 SUBMITTALS <br /> as well as.labor cost to.remove:and replaco,defective materials. Prior-to. ton of1b -Peel Real AS Ill <br /> V_ D�A <br /> the explia i <br /> e I. T istAnce ofAdhosive. <br /> 0 TM by methods indicated,prQvid! g for thermal expansion of Metal u I ,c .2, ManafactVre Q aliftMilons:Manufacturer cap <br /> able of providing flof r rvipe twasentA on <br /> 0.is,,.prim[fasteners where pQss.71ble, EL RIAN <br /> 'w. 11 protvide Alett Standards for Testing RkibberCeMent ASTMD-816;1110squares. --at units true to1he and level As itidipated,Install Workwith ta 0,joints,And seams,that will bo proce res,govemi "ter and app e sh,hordware,supprior,t,.haltpr.eporoOhd 7 <br /> Roofing Contpactpes"full.systom �.er she :A. �Thls.se <br /> orrartty�the-Insulab.ohrronUfactur e includes proviticns�and d' tiotho funif. construction,Approving g0ceptablo In roving ap <br /> and, <br /> P thin and:Jinsialtation ofstoot doors;, pligation melhod A. Th fira submit to the.Archilect four if�Op mp ete GOALVAN <br /> Accepting the insulatloninstallation and conflrming the a Mo a insulation.cover <br /> age <br /> for up to ten a. Cement Classification:Type it permanently waterfightand weetherproO <br /> frames,and integral acce, <br /> sphedule l0ptif�i 9 each do r and each tot number,fogom b <br /> irig Ays <br /> nq the door prim.W !ter a a <br /> tern $upp <br /> (1 0)years from the�Grond Opening cfate� :b� Den and.Viscosity Tests Of& Pre-frisli Orion M nglw:0.9110vict,pre4tistallatfoh meeting to Verify project requiremeh%,substrate, at C-1 8865 <br /> ibmit.the.schedulo for review,make.corrections as Oire.02.0 and submitthe corrected sqheduleforf <br /> 4 Warrantles�and repoir.reports from the.membrane And insulatiori.su p ri <br /> liers shall be-sent 4ftepAy.to 3� Monlito rig;Work In progress. B, Install re lets to receive counter flashing manner and by methods.indicated.Whera.show.n in oncm% B., rs,:seamless, OR eel doors. s,, *a.installation instructions,.and MO uIbckurees wartanty pproval.Approval of schedule will not relieve Contractor of the responsibilities for famishing,a In oessory <br /> p Doo h ow rdard at n <br /> reqgiromOnts'. I e, <br /> the Divisibriall O.ffio.e.MaiMe.nance.Departmeiit; fumish work <br /> reglets,to trades of concrete .for Installation as work of Division 3 sections,Where shown in h4dware,and ootrect quantities. <br /> &OZ ROOF MEMBRANE INSTALLATION masonry turn r ats to taldesof masonry work,for Installation as workpf Division 4 sections. CA P as:prossed steel frames and intarlor glazed panels of W load unit t 0 <br /> rem ypp. 1.07' Delivery.storage,arid Haptill REN. 8/31/17 <br /> B Neither the Owner's acceptance,nor payment.,nor any provision in the.Contract Documents shaTrelieve: riB. Furnisin tomplates.required by manufacturing contractor for maklIng proper provisions in-their work for <br /> theContrad r%(>f.r4�.5pp.nsibilityfbrfaulty:r(tatorials:orw.or.k 'an hipandli 11 remedy,any defact&due A. :The Contractor shall com ly with,all precautions recommended b roof membrane Manufacturer during to rees,ordering instructions and 'facif <br /> e sha <br /> p , 0i Ins 0 wunteirflashing in seal arrangement or byWoldin inplaceforanchorago, D, Assemblies.:proVIdestand rd steel dwond from A <br /> P e assemblies as required for thermal rated(insulated A. Ordering.Comply wit mAnufactu lad4mer requimmon ottirtg.Furnish to <br /> %tovoid a CCU ratO WIN N� -hardware tripiates to ample timeto it to progress of work. <br /> sh appearwithin a Poriod.of two(2)years from date of the-Grand Opening. :Installation. <br /> thereto which, all nd fiIII roglet with m-astie.or elastomedc,a !ant as Indicated and de <br /> rg Oa pendin On degree-of,sealant applictions. construction:delays- <br /> exposure. CNIINS <br /> C TheOwner has the rightin t ac a of emergencyat any firrieduring the warranty period and witho B. Roof membrane installation sh libeinst btamor.dancavAthmembr.ane.manufa.ctureilsprin.ted <br /> , h are .1 ut . a , ri E. Provide factory primed doors-and frames to be.field painted. B. Packing,Shipping,Handlingi and Unloading:�Deliver materials in rrranufactureea�prlginsl,unopened, <br /> invalidating any warranty.,to make.any tem ora;y repairsihat ate required in order to protQc.t.flne building instir.o.ctIQns anO recommendations_ <br /> P Q, Nail flanges Qf-expanslonjoint units to curb nilers,at maxitriorrispcing of 6 inchas O.c.fabricate seems undamaged containers withidentificaWn latiets Intact, identification <br /> A. Coordination:coordihate hardware with other Work,Tag each item or package separafelyi <br /> ,and..the contents-ofthe building from dam go.dwo1o,the roof]"king, Lo SpIlipase mate -0 sh,1111tie:0110eined". a ficepritnerors.piloewas a db000ptedwith,one <br /> P a '' p ffs th. p h n, at, n etween units,with minimum 14 overlaptofo ace nwus.watorp.roof.systom. 1.02 SUBMITTALS d <br /> rM nti <br /> relate <br /> layer of splice adhesive..Allowsplice adhesive todry before.applying lapsestant. C. Storage and:Pro.tectionz.Store materials proteclAdArom,exposure to harmful weather conditions..Handle hardware.items.of proper design for use n doors.and iramesof.the thicknesses,profile,aLm. rig,security. <br /> PART 2 PRODUCTS 2, AtContracto opti prime membranewithmembrane marruticturoesprime and Install 3'or7" A. Pro date of door a fram --apo d <br /> ft r, duct rid,., Offd,inctu ing datafls of storefrontmaterial And components to avol da ge,Protect slorefront.material Against da 96fro andsil ilar reaufroments indicated,as necessary for proper insta Istion and function.Deliver individually <br /> Ma splice tape as required. <br /> END OF SECTION dimensions,hardware preparation, omlabell compliance,soundratings,profiles,and finishes. lements,construction activities,And other hazards:before,dUdn%and after storefront installation.. ackag#d hardware Items at theproper times to the,proper locadions.for installation. <br /> 2.Of EPDM ROOFING p <br /> C, Flashing and perimeter detallsshall.be.in strict accordance with.manufacturers printed instiactions and: 1.03 QUALITYSSURANCE PART 2-PRODUCTS S. Tomplates:fumish.hardware.templates toeach fabricator of doors,frames.,and other work to factory- <br /> Pro Id e tire:m be. <br /> V1 a n ,ofing system.1 Opcordance v iffai o As unte d. Treatediwaod,nailers shall be Ihstalled where <br /> OthFirestone�rehfcireed.mecha�hiea,y step cifir. tone cturars details for all:conditions ono re <br /> pniipairod.for the-Installation ofhardware.U rl requea thock the shop.drawings.of other-work to confirm. <br /> Rubbergard EcoWhIfte Roofing System or Sure-Seal.Sure-White Reinforced Mechanically Fastened indicated on.drawings and as specified by the membrane manufacturer.. Nalters.shati.beinsta led by the 07901-JOINT SEALER Po <br /> 1. 1 . . .1 A :Provide 0oorsand frames�complying with.Steel Door Institute"Recommended Specifications.Standard 2ffl Manufacturers:(Acceptable ManufacturetzlProducts) that ade Vats provisions d, <br /> Roofing Systdirn�y Carlisle$YhTec:Systems,high-albedip,reflacfivefoofljng� . .1 . I q are ma a for the properinstallaron of hardware. <br /> roofing contractor Steel oors.and Frames"ANSIISOI ,00 andas herejo.ap led, <br /> PART I�GE-ERAL <br /> X 4- ceptablo Manufacturers.; <br /> B. Phase construttlan D� Roof Membrane sbitill be Anchored to Wood.nailaramheno Indicated.On drawlings andat ail roof I_ Kawneer Company�Inc. PART 2-PRODUCTS <br /> will.not be pormi and issufficiont cause forefieption of the complete sstorn� Atlfiq end of ejaph ds!(s penetrations.over 10'in diameter,per marmfocturer's standard details, <br /> 40 1 1 1 ".. I M SUMMARY PART 2 -PRODUCTS 21 or approved equal <br /> work,water cut�oft shall be applied�to seal the-insulation and,edgef the.roof membrane.from moisture 2,01 MATERIALS ANO:FABRICATION DEVELOPMENT INFORMATION: <br /> ,entry., Thesa Water out-oft must be complet"I removed prior to the resumption of work. E, <br /> A. This seqtjOn.irv.dude$provisiqns.end,prqpedua governing:the,fur"i hin andinstallation,of.jointseaJers ACCEPTABLE:MANUFA0WRRS: 2.42. Materims, <br /> for the folkiing locations: A. Fasteners:provide hardware manufactured to conform to.published templates,,.generally <br /> its shall oom with th physical pro ortle. listed In the most cistren red OrASTIVII P. All membiran fa g twp sheets Of r4bber,shall have an add[# coverofflashing material and I, Exterior toInts In vertical surWos Acturers <br /> C, All roofing mated. ply �. I$ s� oral preparedfor ARCO HT� <br /> p <br /> pg.e redin A. Ayoflabla manufacturers,;subjectio corn I arice with requIroments.manuft offering standard steel A. AJurninu (Storefront and CDmponents)', <br /> PH mathiriescrewinstalld .Do not providahardware thathas.been prepared for$elf-ts' sheet mat <br /> M <br /> on .I 4PP)r9PnAtRFe0erWcrA$TMpro artyrequir me tsshal of su <br /> Specifications. Materials that do not comp y P P n Aficient sze to be property sealed and to conceal the-joint, Non4r rporaed. . screws,oxc-W.as specifically I <br /> affic horizontalzurfaces as irid[cated below.. d.o.m.p.rydfr.ames:yinich.qWbe:inco t in1hawpikinru bvta g:, <br /> renctli elto,lb-pTolkiwin, 1� Materl I Standard,Extruded.AAumtrivm,ASTIVI B Ul.;�006345.allpy and temper. ndicated. <br /> not be Used. TheContractor shall furnish to the Attkttept of.Record written certification from the a� Joints between different materials listed Above. 3000 am/pm <br /> ArnwOld Building ProducKinc, 2. Member Wall'Thicknesst Each framing morribershall:provide structurat strength to Meetape Iffed <br /> manufacturers that the materials supplied to,the,projed conform to.these:specifications. 0, Overiap adjacent.sheets a minimum of P"and.fold top sheet to expose splice surfaces, Broomexceas b, Perimeter joints between-materials listed above and frames of doors and.w1dows, 2. Coco Corp. performance requirements. B. Famish screw for Installation with each hardware item Providephlilips#at.headar ews exce as FUEL CANOPY <br /> Pt <br /> dust.and debris from mating.surfaces. Prepare splice with Splice Cleaner faimishod by,tha me.mbraro, c.. Otherjoints-is indicated,.. 3, Sleelpreft.Manufacturing Go- a. Tbleranizoa;:Reference to tolerances.for wall.thickness.:and other cmssTs.ec.VQnOI dimensions of- Otherwise indicated..Finish exposed(exposed.under-,any-oondfilm)screws, o match hardware finish or,if <br /> .D� Roof mombraroshall ty.e:.046!nches.:(4$ml�)tbtchreinfbrced EP I <br /> manufacturer using cotton rags(no mops.or to fairs), Apply butyl base splice corriterit to suggested wet Oil <br /> storefrod members are norrifnal and'.1n:compliance with AA.Afumlnum:Standards and.Data, *xposed.lin surfaces of*or work,to match finish of this Qftrw.o*as Closely 4%possibfe inclu I W/ 6 MPD's <br /> ,conforming to.the following physical pyDporffes� Alrackness:usinfla medium nap.r.oller Apply In m8eae sealant approximately%*fromback: 1.02. SYSTEM PERFORMANES 2.02 MATERIALS *prepared for paintlaurfacetto receive painted finish. <br /> edge of is property driied,mate the zudacoa.toprovidea 6",splice rig, <br /> avoid.! 403: Accosson <br /> PROPERTYTEST METHOD SP-.ECIFIQ-ATION wrinklesor'fishinouths!'.. Roll splica.4completoly either by hand roller or-by Clean-top A. Provi.dejoint sealeirs.that have.been produced andinstalled toestablish and maintain watertight and A. Coldrotted-steel sheew.carnmercial quality carbon.steel,complyingmith ASTM A1366 and,ASTM A 568. C. Provide concealed fasteners-for hardware units that are expo.sedmben door is closed except to.the extent <br /> adgqa.of splico with.Splice prior leppilicatiorr,of Lao sealant-. waitappmorrialeiv 1 to 2 hours a . u <br /> confinuo, a seats. Where all <br /> 'A. Fasteners; 0"sod,sh- Stalrdeft:$teei_ no stand be not utoth u�bottslb <br /> Am <br /> Sheet Thickness-overall ASTM D-412 0.054 before and:feathering Lap-Sealant Complete Lap Sealant eachbay� B. Galvanized steel sheets:zino--coated oarbDnsteel sheets of commercial qualityeomplying with ASTIM A SITE ADDRESS: <br /> T installation where bult head r nuton opposite face is exposed in other workunless 1heir use is the only <br /> .erisile Strength AISTIVI D-411.12 13,015 psi (w)Mpa) 1.03 PROJECT CONDITIONS :526,or drawing.quality,AS.TM A(1412 p in,Ad APO With ASTM A 5225i ' A0 .Or B. Gask6 sh <br /> cord with a <br /> 0:b6extru rheanS.Of reinforcing,the work ode to fasten th hard retedure Where Ahm-boltsare used as <br /> Factory Seam Modified StrengtIT ASTM D�81.6 Mambrane Rupture 3.03 ROOF SURFACE PREPARATIO14 :,060 coating designation,millphosphatized. WA.. . 1.11 r, ly�' .. a <br /> Elongation ASTM.D-41 2 300%.Minimum n means:of reinforcing the work,provide sleeves for each fhr�ubott r use sex screw fasteners. <br /> A Joint width condifio s:do riot proceed with Installation Of joint seaIerwher.ejoI0t:Wdtlhs Are less than Pe <br /> rimater Anchors.AlurrilhUm,.Whon steel anchors are.,used,provide insulation between steel Material <br /> Tear resistance A M.D424 1.50 Itis n minimum(20.27 Nimnj) A�. The Contra shall be refsponsi le forproviding adequate.surfaces to receh. insu Aron rqofirigand wed,by joint se C, <br /> b v , lermanufacturerfo applicationladicted. Supportsand anchors.febricate.of net less th n18- tige.sh etsteel; Ivanizedwhere.us dlAqth and aluminum m8tarfall to prevent galvanic aptio A <br /> _0 nh. @ HIGHWAY 120 <br /> 2,02: AW.JFACTJtJRER � S. ECIFIEDINDRA".KS <br /> Shore A Durometer ASTM D-2240: 65 10 fla�hlno, PdottothL,.Qtit;etdiW.Ork,thO.AOPtOVOd.Aoplfij.atorthall�ospbett galvanized framOs. ESCALON,CA <br /> tcepys/lOOPPRUI ASiM.0-1.149 w1b..50%extiarialon, Defects an I peroo d tions,Affecting the roof histall4rion shall be b Vghtto tho.attention.ofth 8, Joint substrate conditfonsI-do notpropeodwith arlon of Joint sealers until contarninarris,capable of and pivots-to be I onroly(both leavesy into wo.ed doorsand frames, <br /> mpro I Of install Z04 Related Materials A- TomPlate%exckpt-for hinges <br /> Heat Aging 28,days at 240o F ASTM 0­573� Tensile minimum 1205 <br /> 'psi(8.3 Mpa)Elongation.- Contractor in writing for correction, interfering with.their adhesion.are:removed from joint.substrates. Q. Inserts,boltsand fasteners;manufacturer's standardonits,Where items are to,be built ntae),dedor walls, provide nly template produced units. <br /> nimum 2001% hot-dip g6va pilarroe w as r a Ap be Sealants'Refer to Joint- roafffient(Sealants)Section. <br /> nizoln-oDirn Ith ASTM A 153,tia Co C. s. plica I <br /> t scrawt providia ptifillpa flat"ad sprows comply! Q the fllowin 0.roquirem. tJ <br /> with <br /> Brittleness Temperature ASTM D-7.40 -49.' Cl B. Pondedwatershall be rernoved from.the roof surface so as not.to contribute to potential damage.. PART 2-PRODUCTS. FAMMY TBD <br /> a. For metat doors and frames install machine.screws into dilledand tapped hote. <br /> Water Resistance ASTMI D-471 +8j 4 Chanigs in weight after IMMersto y at <br /> aE. Sho :applie ph paint:rustAnhibifive I idn <br /> d g,saitableasebasefor B. Glass: to.Gf Ass and v 8, <br /> �r b� For"od,4ocirs And frames install wood.scrws. <br /> 115QQ F, 3.04 FIELD QUALITY.CONTROL MA ..IAL$.q�.NERAL fied fin!sh.paints c m -test DESIGNED BY- ALUANCE Z&DM: <br /> e ' Q and acceptance criteria for prim <br /> sp rA plying with ANSI a22-4, procedure a C. Fail h screw heads to match surface of hi es or pivots, <br /> Water'vaporpemlepbility.max.perm mils AST E-96 2:0, <br /> 'Painted steel 9 forst"I doors aframm a y after fabd tion. 2.05. Fabricor* <br /> .00 on Z inge pins:except as otherwite indicat4di provide hinge Vinsias.follows: <br /> Tolerance on CHECKED BY: BP REPM: <br /> Nqmin I'thicknoss 0/ o" atibilily;prokide joint sealers,joint liters and other relat d materials lhat are compatible m4ft one A� Oot-swing lxterlor doors'.non-removable pins, <br /> aASTM 0412 100/0 A, Tbs.Owner will employ nd pay for,qualff 10 Roofing Consultant or Independent te 0ing agency to per,form A. <br /> P <br /> the following testing andt.or inspections,for.feld.quality contrOL ReW.!rig of materials failing,to,meet ontherand With joint sobs,"Aes.undiar-,cQnditons.of.iservipe.and application,as.demo.ristrated b -sealant �2.03 DOORS b, ut-swing conidor doors.with locks.,rion-removable.pins. DRAVM BY- ALLIANCE PM: <br /> Goneral'I <br /> �E Memb.raneaheet size shall 0 the largest sheet osob e, outf4citory seams,as detpm11nod,by existing zpociffed requirements shall be done at Contraclpfs ax nse,ReAn pe.ct!6.n cc to-shall b qt th - with Mini umc4earanceappd ridoors:no"Mrising.ping. <br /> p p I witil pe P.. manufacturer based on testing and field experience,, 1, Fabricate components per ma0utacturees Installation Instruct <br /> job site conditions. C.ontractor.s expense. A. '.Provide metal doors of SDI 9rades and.mod s.specified below or asindicaled onDrawings.ortchedules: shiMspacfng,aroun.d.per[meterof'ass.embl.y�,.yete.nablihgin <br /> of stallation and dynamic movement of 1 Tips-flat button and matching plug.finished to match.leaves. VERSION: PROECT NO� <br /> 1. U on notification,by lh �contractor that,the roof andassaclated.items:aro pe 8, Colors:provid000lor.of exposed int sellers.as 8elocted to.match adjacent materials from.ManufactVrier's .1 Exterior doors.ANSIISDI 100 Grade <br /> p lli,.extmhOay.yL4t4tyMaOO(4,.MiniMUM16,9".ge: a n <br /> g Iva Ized. perimelerseal., Number of hines:.provide nVmbor of KIA <br /> gesinificated butriol-logs.than.3,hingos pordatirloof for <br /> F. Flastangs shall be elf curing EPDM.060 inches:thickand fumished by the membrane manufacturer.. Owners.authorized testing I inspecton agency and the roof membrane manufacturer(warrantor) standard colors.. -steel faces. Accurately-fit arid secure joints and comers,Make joints flush,hairline and weatherproof, doors'90 inches or less in height and one additional hinge for each.,30iriches Of Additional height. <br /> :Flash shall ma2. 17223 <br /> 4%cWrof a:.requirements arid:approved..dotalla� <br /> shall provkfd.therflihol inspect an shall.occur simultaneously for 0,0 <br /> parties.. Any,.jesUng or inspqctionsaffe�the finalinspection-will be.done-.4t.contractors expense, 2.02 ELASTOMERICJOINT SEALANTS R. :Provide metal frames for doors.a <br /> ndather openings,oftypes nd:Wesasshawn.pin D Wingsand 4� Arran ..-ANPKEYING DRAVANG TITLE: <br /> Ow Ouick�searn flashing shall be furnished by th ra ge fasteners And aflachirmnla tiponOal from viow�. 2.03 LQCKCYLINDERS <br /> a Membranelma.04factur6r. s:0hedples,Qqnwal fastenings,unless othenvise indicated. .Fabticaterframes of.rranimum la gauge cold <br /> A. Elasforneiric sealant standard-ASTM C 920.Subject to com farce with requirements,provide one f the tolledsteeL <br /> .. Pi 2.06, Finishes A. Standards stem:except as.otherwise.indicated,provide new master key system for project.Review the <br /> H, primer wash:and splice dhO,6ive shall be furnished.by.-the membrane:marnifacturer... E�NQ 0 y ARCHITECTURAL <br /> F SECTION -ames with mitered, oped,or welded comers. keying ay0em with the Owner And provide the type.required, <br /> I Fabricate fr <br /> I, one part norisiag preth,ane sealant for use nt: Z Fo exte r fraestr9tri 16 gauge galvanized steel. A Finishing; I. EquIpmentlopKs with manutledureaspecial 6-oin tumhlory.1frider w-ithionstrpotion Master key <br /> rM tic <br /> I. Bonding adhesiveshall.be compatible with-materials to which the membraneis tobe b.onded:and a� 70ynatroll L�Pecora Corp.. <br /> fVnIish t, Architectural0ass 11 Clear Anodic Coating(Standard). feature that permits voiding of construction keys without cylinder removal. SPECIFICATIONS <br /> 00 by the membrane. b.. "Permppol IRC_L*,"ugtesoarch&�Che.rrdcal Corp. Piaster guardsl inimum 0 gaugeateel plaster.guards or mortar boxes at back of b. <br /> 1rdwaire <br /> 076W-FLASHING AND SHEET METAL 01 "Sonolastic.NO 1�_Sonneborn Building Products.Div. cutouts. 2.071 Source.quality Control B. Meta.W construct loc.lik-cylinder parts from brass..or bronze,.stainless steel,.or racket silver. <br /> Ji. Lap seatont ahitl�be:compatible with Imaterials:with which it is.used,shall bia used to seat thoexposed d. Vymonidll TrOmpa Inot <br /> :edge of all.field fabrIcatesplices and furnished by membrane manufacturer.. PART 1.-GENERAL 2. One part pourable.urethans sealant foruse T: 2.0.5. FABRICATION A. Source:Quality:.Provide.aturrilburn storefronts specified herein from.a single source. C. Key material.provide keys of racket silver only. SHEET NO: <br /> 0. "NFL201 Urox dt g ..Whohal.UMinUM Sto, Mar are:pan,of..1 bui(diri end <br /> .Pari'�Potato Corp. Rod Enclosure system- refro. <br /> K Night-Relapy)tshpit be compatible.with matariplaw. osure systom� <br /> thwhlchJt'isVwdand1fv ipher;tbytha mOr e 141 SUMMARY <br /> m me an b. 'SQnolg $qnnebom.Building PmOuQt§.Div., A. Fabricate steel�door and hameanits to be 694,neat III appearance APO free frQ m.clefects,warp or buckle. in -n Its And related pr-90vots provide D, Key quantity fumish.2 cha 6 <br /> entrance hardware,windows,curtat <br /> D99 jcpys for ezLqh loc.. 4.master keys for each master tomp All <br /> manufamirer. . Butyl polyisatkot <br /> yle!ia tape sealant: 'Wherever prarticablo,fit.and asserriblo:-urati in rhandapturers pliant,Clearly W 6.uijdirig6nQ[O$Ur,6systsmprd.d otsfrorna.sin <br /> -ntify Work that cannot be glepurce manufacturer. permanent,me <br /> sterkoys with key set riumberand O-rio <br /> t Identify,permanent keys 1(n env <br /> asfurniahing and installai aTape;Pa-corp.Cor <br /> A This section Includes.provisions and procedqresovqmIng the fabrio4ron oni of pamiariently faciery-assemb4od before shipment,to assure proper Assembly at projed,site,Compty:Wth and send directly:to,Owner by registered mail. <br /> L. ostenerseatant:shall be furnished by%the.tm.mbrane.,manufac.tLtrer. flashing,sheetmetat,and inlegrallaocessories,including b,. �ShitrLS.eal Tape,;Pecora Corp. ANSIISDI,-100 requirements. PART 3-EXEGUTIQN� <br /> 1,� Metal coariforfashing and base flashing(if not�m h <br /> $0 Prteov. Treatmonfs�line i,� Clearances. re than I ion 6 HE$1 AND SOL <br /> a hoods.Not.r.nore then 34 n,h Of b flom .2,94 OCWLATO <br /> Pourable sealer shalt be,compatible with materials with which it is used and furnished by-the membrane Z Mota[wall lashing and expnsion joints. d. Tre=o,440 Tapdl,Tramco.Inc. &01 Examination <br /> manufacturer. Exposed.metal,ttimlfat.�dla units,. Toleranoesicomplywith.SDI:117:' a Steef.Dooraandfmme%� <br /> M nd rd <br /> A7s4 <br />