SEVERAL NOTES SPECF�CATD
<br /> 1.00 - GENERAL SECTION 15400 - PLUMBING F. Condensate Drain Piping: 'Ad kk
<br /> 1 PLUMBING CONTRACT DRAWINGS ARE IN PART DIAGRAMMATIC, COVERING THE SCOPE OF WORK AND Copper water tube ASTM B88 71 OF
<br /> , Type "M", solder with 95-5 solder, lead-free type. 3.03 PIPING INSTALLATION
<br /> GENERAL ARRANGEMENT OF THE EQUIPMENT, PIPING, ETC., AND THE APPROXIMATE SIZE OF EQUIPMENT 1.01 DESCRIPTION OF WORK
<br /> AND MATERIALS. THE CONTRACTOR SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THE PLUMBING WORK. G. Gas Piping: Galvanized steel Sch 40 and fittings for outdoor. Black steel Sch 40 and buskin s will not be
<br /> PLUMBING CONTRACTOR SHALL CONSULT GENERAL, SPRINKLER, HEATING/VENTILATING/AIR CONDITIONING P g 9 A. Make changes in size of pipe with reducing fittings; g
<br /> CONTRACT AND ELECTRICAL DRAWINGS TO FAMILIARIZE HIMSELF WITH THAT WORK AND TO VERIFY THE Furnish all labor, materials, equipment and services required for and/or reasonably incidental to the fittings for indoor above ground. 3" and smaller steel pipes shall be threaded, 4" and larger steel pipes permitted except for bell shaped copper bushings.
<br /> SPACES IN WHICH THE PLUMBING WORK WILL BE INSTALLED. completion of the following work. are to be welded. Use approved Polyethylene yellow piping (PE) for all B. Install dielectric insulating unions in water piping between copper piping and ferrous
<br /> A. Sanitary waste and vent piping system including connections to building sewer as shown. outdoor underground piping with 14 gage tracer wire and shall not come in contact with PE piping. PE piping or equipment - Epco, or equal.
<br /> 2 BECAUSE OF THE NATURE AND SCALE OF THE DRAWINGS, CERTAIN BASIC PLUMBING ITEMS SUCH AS B. Domestic hot and cold water systems including water heater, and related accessories and controls. pipe must be joined by heat fusion method of connecting pipe and fittings or approved mechanical C. Install exposed polished chrome connections from fixtures or equipment with
<br /> UNIONS, FITTINGS, ELBOWS, ETC., MAY NOT BE SHOWN. WHERE SUCH ITEMS ARE REQUIRED BY OTHER Connection to building water as shown. fittings. special care. Show no tool marks or threads at fittings. ARCO
<br /> SECTIONS OF THE SPECIFICATIONS, OR WHERE THEY ARE REQUIRED BY THE NATURE OF THE WORK OR BY C. Plumbing fixtures, trim and accessories including installation and support. D. Cap openings in piping during construction.
<br /> CODES AND REGULATIONS, THEY SHALL BE FURNISHED AND INSTALLED AT NO ADDITIONAL COST TO THE D. Flashingand sealingof roof and exterior wall penetrations for water tightness. 2.01 PIPE FLASHINGS E. Provide 85% red brass pipe IPS in connection to faucets, flush valves hose
<br /> OWNER. THE DRAWINGS INDICATE GENERAL LOCATIONS OF PIPING, EQUIPMENT, DUCTWORK AND E. Caulkinand sealinof floor and wall penetrations and formed shaft penetrations. P P
<br /> SIMILAR. THE EXACT LOCATION TO BE DETERMINED BY THE CONTRACTOR TO BEST FIT THE LAYOUT OF g 9 P P bibbs or similar items requiring rigid piping. Extend brass pipe from fixture to
<br /> THE JOB. F. Backing for securing fixtures, trim and piping. AS APPROVED BY ROOF MEMBRANE MANUFACTURER. point where piping can be securely fastened to building construction. All exposed
<br /> G. Access doors where shown or required by code. piping and stop valves in connection to fixtures shall be chrome plated brass.
<br /> 3 ALL EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT, WATER, AND CHEMICAL OR H. Hangers, supports, and guides. 2.02 VALVES F. Install unions adjacent to valves and where necessary to facilitate disassembly
<br /> MECHANICAL INJURY OR THEFT. PLUMBING FIXTURES SHALL BE COVERED WITH HEAVY PAPER COVERINGS I. Cleanup of debris and final cleanup of drains, fixtures and equipment. of piping.
<br /> AFTER INSTALLATION AND SHALL BE THOROUGHLY CLEANED AFTER COMPLETION OF THE PROJECT. J. Record drawings and operating manuals. A. Gate Valves: Red & White 204 or equal, 3" and smaller. G. Escutcheons: Fit exposed pipes passing through floors, walls or ceilings with
<br /> 4 ALL MATERIALS SUCH AS VALVES, FITTINGS, PIPING, EQUIPMENT, PUMPS, COILS, ETC., SHALL BE K. License, permits and associated fees. B. Check Valves: Red & White 238 or equal, 3" and smaller. escutcheons. Manufacture special sizes of escutcheons from steel and prime coat
<br /> PROPERLY PROTECTED, AND ALL PIPING OPENINGS SHALL BE TEMPORARILY CLOSED BY THE CONTRACTOR M ,Gutting, drilling and patching for all surfaces in relation to plumbing work. C. Ball Valves: Nibco 580-70 or equal3" and smaller. same. Cut in round, rectangular or square space to provide a clean appearance
<br /> FOR THE WORK UNDER HIS CHARGE, ON A DAILY BASIS, AT THE END OF EACH WORKING DAY, SO AS TO M• Condensate drains from HVAC equipment, and gas piping acceptable to the Architect.
<br /> PREVENT OBSTRUCTION AND DAMAGE. THE ABOVE REQUIREMENTS ARE MANDATORY. 2.03 PLUMBING FIXTURES AND TRIM: H. Support piping independently of equipment to which it is connected.
<br /> 1.02 RELATED WORK INCLUDED UNDER OTHER SECTIONS 1. Make copper solder joints with 95/5 solder, or silfos; clean surfaces to be
<br /> 5 THE CONTRACTOR SHALL SEE THAT ALL MATERIALS, INSTALLATION AND WORKMANSHIP IS PERFORMED IN Plumbing fixtures to be furnished and installed under this contract. See plumbing joined free of oil, grease, rust or oxides and apply Flux to each joint before
<br /> ACCORDANCE WITH THE LATEST EDITION OF ALL APPLICABLE CODES, LAWS, OR ORDINANCES OF THE STATE, A. HVAC and Electrical Work. 15500 and 16000 fixture schedule. heating assembly.
<br /> AND ALL COUNTY AND LOCAL CITY CODES OR ORDINANCES, INCLUDING ALL STATE OR LOCAL BOARD OF B. Fire Protection Work 153000 (if applicable) J. Rough-in and make final connections to all other equipment furnished under other
<br /> HEALTH, FEDERAL AND STATE ENVIRONMENTAL PROTECTION REGULATIONS, 2.04 PIPE HANGERS AND SUPPORTS Divisions, requiring plumbing connections.
<br /> STATE ENERGY CODES AND UTILITY REGULATORY AGENCIES. 1.03 EXAMINATION OF SITE
<br /> 6 ALL WORK SHALL BE FURTHER PERFORMED IN ACCORDANCE WITH THE NATIONAL BOARD OF FIRE A. Superstrut, Grinnell, or approved equal. 3.04 SUBSTITUTIONS
<br /> UNDERWRITERS, THE PLUMBING AND BUILDING CODES, NATIONAL ELECTRICAL CODE, THE A. Visit site before submitting bid and check location of all existing conditions B. Installation per manufacturer's recommendations.
<br /> OCCUPATIONAL SAFETY AND HEALTH ACT, THE AMERICAN GAS ASSOCIATION, AND ALL SUCH OTHER which will affect this work, verify dimensions and locations shown on drawings and C. wrap Pipe hangers shall have non-metallic felt or elastomeric liner or applied to the A. One or more makes of materials and methods may have been specified to establish the GHAO
<br /> SPECIFIC CODES AS MAY BE REFERRED TO IN THE INDIVIDUAL SECTIONS OF THE SPECIFICATIONS. cover all costs. Contractor shall assume reasonable variations or minor omissions g P PP standard of quality, workmanship, finish and design required, but other materials or methods
<br /> pipe for electrolytic protection where hangers and supports are used to support copper q y> p� g q
<br /> and shall complete proposed work without additional cost. Failure to visit site tubing or pipe. The liner or wrap shall be designed to allow expansion or contraction of the equal or better in quality, workmanship, finish, design, and guaranteed performance, may be
<br /> 7 PIPE SIZES SHOWN ON THE DRAWINGS ARE THE MINIMUM SIZES ALLOWED REGARDLESS OF THE CODE will not lessen responsibility or entitle additional compensation for work not piping submitted for review and approval as substitution. All substitutions are subject to review and �"
<br /> approval by Architect, Engineer, and Owner.
<br /> MINIMUM, EXCEPT WHEN THE CODE MINIMUM SIZE IS LARGER THAN THAT SHOWN. included in proposal ,� J
<br /> 8 THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONTRACT PRINTS ON THE CONSTRUCTION SITE AT 2.05 PIPE SLEEVES11
<br /> ALL TIMES, ON WHICH HE SHALL ACCURATELY RECORD THE ACTUAL INSTALLATION OF ALL PLUMBING WORK.
<br /> B. Visit site of the work, compare it with the drawings and specifications as to the conditions under which B. Substitutions shall be requested in a written form and shall be accompanied with a signed
<br /> AS WORK PROGRESSES, MARK CHANGES MADE WHETHER RESULTING FROM JOB CONDITIONS, ADDENDA, work is to be performed, ascertain and check all conditions and elevations and take all measurements which Shall be provided to protect all piping through concrete and mason walls. statement that proposed substitution is equal, or better than specified. Additional documentation
<br /> FORMAL CHANGE ORDERS OR OTHER INSTRUCTIONS ISSUED BY THE ENGINEER. may affect the work. No allowance shall subsequently be made for any extra expense or claims due to Annular saces between sleeves and g i es shall be filled or caulked an approved to substantiated proposed substitution may be required by Owner, Architect, and Engineer. 0 U
<br /> failure or neglect under this requirement to make such examination, including examination of restricted P P P PP Contractor shall submit as directed. ® 11'W" I
<br /> 9 THE PLUMBING CONTRACTOR SHALL INDICATE PROGRESS BY COLORING IN VARIOUS PIPES, FIXTURES, AND working conditions or such other difficulties visually observed during site visit. Contractor is responsible for manner. Annular spaces between sleeves and pipes in fire-resistance . rated assemblies
<br /> shall be filled or tightly caulked in accordance with the building code. All underslab cast iron
<br /> ASSOCIATED APPURTENANCES EXACTLY AS THEY ARE ERECTED AND INSTALLED. becoming completely familiar with the architectural and structural conditions and limitations which will exist in , C. Contractor shall accompany request for substitution letter with a completed CSI Substitution
<br /> piping shall be covered with polyethylene sleeve (polywrap) and contractor must follow manufacturers Q
<br /> R I
<br /> the building and to provide all labor, tools and materials required to produce a completely concealed manual al proper installation. Form include the comparison for following: I°® d
<br /> 10 MARK ALL PIPE SIZES AND LOCATIONS DURING CONSTRUCTION. ALSO, MARK LOCATIONS OF ALL VALVES installation as indicated on the plans, specifications, and required by the code. 1. Performance Data �G ENGO\A
<br /> AND VARIOUS EQUIPMENT, APPARATUS, AND ASSOCIATED APPURTENANCES AS ERECTED WEEKLY DURING 2.06 TEMPERATURE AND PRESSURE RELIEF VALVE 2. Dimensions
<br /> CONSTRUCTION. 1.04 DRAWINGS 3. Costs and Delivery Schedule
<br /> 11 AT THE COMPLETION OF THE JOB THESE PRINTS, INCORPORATING CHANGES, ADDENDA AND ADDED DATA Temperature & pressure relief valve shall discharge full line size to an approved waste 4• Listed and Approved �e�215 7��® ��EUE SOUTH
<br /> NOTED ON MARKED-UP PRINTS, INCLUDING DIMENSIONED LOCATIONS OF UNDERGROUND PIPING BEYOND The accompanying drawings shall be considered part of these specifications. Work and receptor through an air a as indicated on plans or 6" minimum, 24" maximum. KENT, WA 98032
<br /> LIMITS OF BUILDING, SHALL BE SUBMITTED TO THE ENGINEER FOR FINAL REVIEW AND COMMENT. THE materials shown on the drawings and not mentioned in the specifications and vice g gap P D. A written signed statement from the General Contractor shall accompany substitution (425)251-6222
<br /> PRINTS WILL BE RETURNED WITH APPROPRIATE COMMENTS AND RECOMMENDATIONS. THESE CORRECTED versa shall be executed as if specifically mentioned or shown in both. The drawings request form assuring that:
<br /> PRINTS TOGETHER WITH CORRELATED PRINTS INDICATING ALL THE REVISIONS, ADDITIONS AND DELETIONS shall be considered as schematic in nature and minor modifications of the work to 2.07 SCALD GUARD PROTECTION 1. Dimensions has been verified with project conditions and has coordinated with other (425)251-8782 FAX
<br /> OF WORK, SHALL FORM THE BASIS FOR PREPARING A SET OF RECORD DRAWINGS. comply with the structure as found shall be made. trades. Substitution does not affect dimensions shown on drawings.
<br /> Provide and install lavatory scald protection for waste piping and hot water piping. 2. He shall pay and burden the costs for changes to the project including redesign, CIVIL ENGINEERING, LAND PLMNING,
<br /> 12 WHERE PIPING, AND OTHER PLUMBING APPURTENANCES PASS THROUGH FIRE PARTITIONS, FIRE WALLS, OR 1.05 RULES AND REGULATIONS reengineering and review of substitution. Only one engineering review time is allowed for each SU NG, ENVIRONMENTAL SERVICES
<br /> 2.08 DOMESTIC PIPING INSULATION
<br /> FLOORS, INSTALL A FIRE-STOP THAT PROVIDES AN EFFECTIVE BARRIER AGAINST THE SPREAD OF FIRE, product substitution. Contractor shall be responsible for additional review time and shall pay
<br /> SMOKE AND GASES. FIRE-STOP MATERIAL SHALL BE UL APPROVED, PACKED TIGHT AND COMPLETELY FILL A. All work and material shall be in full accordance with the latest rules and
<br /> CLEARANCES BETWEEN RACEWAYS AND OPENINGS. FLOOR, EXTERIOR WALL, AND ROOF SEALS SHALL ALSO BE A. Provide and install "insulation protection shield" for piping with foam or fiberglass Architect and Engineer's time at their professional rate schedule. NO. DATA DESCRIPTION
<br /> regulations of the State Fire Marshal and other applicable State and local rules and P P P g g 3. He has confirmed that the
<br /> MADE WATERTIGHT AS APPROVED BY THE ADMINISTRATIVE AUTHORITY. proposed substitution will have no adverse affect on other
<br /> regulations. Nothing in these drawings or specifications shall be construed to insulation.
<br /> 9 9 9 P trades, the construction schedule, or specified warranty requirements. 1.18.1: PERMOT SUBMITTAL
<br /> 13 ARRANGE AND INSTALL PIPING APPROXIMATELY AS INDICATED, STRAIGHT, PLUMB AND AS DIRECT AS permit work not conforming to these codes. B. Insulate all rainwater piping with 1 thick fiberglass insulation below the deck up to 25 feet of 4. He has confirmed that maintenance and service parts will be locally available for the
<br /> POSSIBLE. FORM RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS. KEEP PIPES CLOSE TO horizontal run. proposed substitution. 1
<br /> WALLS, PARTITIONS AND CEILINGS, OFFSETTING ONLY WHERE NECESSARY TO FOLLOW WALLS AND AVOID B. Furnish without any extra charge any additional material and labor when required C. Insulate all horizontal waste piping (Hung) with 1-1/2" thick fiberglass insulation above noise sensitive
<br /> INTERFERENCE WITH OTHER MECHANICAL ITEMS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER; to comply with these laws, ordinances and codes regardless of whether shown or areas ONLY. E. Cost savings resulting from substitution shall be returned to the contract or the Owner if a
<br /> SPACE THEM AT A DISTANCE TO PERMIT ACCESS FOR SERVICING VALVES. mentioned in these specifications of drawings. D. Insulate all domestic water piping outside the building or on roof with 1-1/2" thick Armstrong the substitution is permitted.
<br /> 14 WATER PIPING SHALL BE PITCHED TO POINTS OF DRAINAGE WITH CONSTANT UNIFORM SLOPE. Armaflex or approved equal, and sections butted firmly together.
<br /> C. All work and material shall be in accordance with the Landlord's Mech/Elect. Design E. Insulate all condensate drain piping with 1/2" thick Armstrong Armaflex or equal, and sections butted F. No work involving materials submitted for substitution shall proceed until written acceptance 4
<br /> 15 INSTALL HORIZONTAL PIPING AS HIGH AS POSSIBLE WITHOUT SAGS OR HUMPS. Criteria. All contractors shall obtain a copy from the Lndlord's Tenant Coordinator or firmly together. is received from the Owner. The Owner is the final judge of acceptability of preferred
<br /> Mall Operations manager and become familiar with the requirements contained within F. Insulate all hot water piping with 1" thick fiberglass insulation. substitutions. 5
<br /> 16 GRADE DRAINAGE AT UNIFORM SLOPE OF NOT LESS THAN 1/4" PER FOOT TOWARD THE POINT OF DISPOSAL. prior to bidding the job. Where Landlord's requirements conflict with Codes or G. Provide and install scald guard protection/insulation under sinks with exposed p-traps and hot water
<br /> WHEN APPROVED BY ADMINISTRATIVE AUTHORITY, PIPE SIZE 4" AND LARGER MAY HAVE A SLOPE OF NOT LESS Ordinances the strictest interpretation shall apply. supplies. 3.05 COORDINATION - AL
<br /> THAN 1/8" PER FOOT. H. Minimum R-values for hot water piping insulation having pipe diameter of less than or equal to 2" is
<br /> 1.06 SUBMITTALS R-4, for larger than 2" diameter is R-6. A. Coordinate work with other trades to avoid conflict and to provide correct rough in and
<br /> 7
<br /> 17 WHERE CHANGES IN PIPE SIZES OCCUR, USE ONLY REDUCING FITTINGS. connection for equipment furnished under other trades that require plumbing connections. 8
<br /> A. Submit for review to the Owner a complete and all-inclusive list of equipment and I. All outdoor insulation shall be protected with aluminum jacket. Inform Contractors of other trades of the required access to and clearances around equipment
<br /> 18 FOR DRAINAGE PIPING CHANGES IN DIRECTION, USE LONG SWEEP WHERE POSSIBLE, OTHERWISE, SHORT materials proposed for use (6 copies), accompanied by manufacturer's data sheets. 2.09 CLEANOUT to maintain service ability and code compliance. g
<br /> SWEEP 1/4 BENDS, OR COMBINATION WYE AND 1/8 BENDS; USE SANITARY TEE BRANCHES ONLY FOR Data shall be forwarded in a single package written 15 days after award of contract.
<br /> HORIZONTAL BRANCHES DISCHARGING TO STACKS. Submit six blackline prints and one reproducible shop drawing showing proposed plumbing B. Verify equipment dimensions and requirements with provisions specified under this Section.
<br /> P P P 9 9 P P P 9 A. Accessible cleanout shall be provided at the base of each waste stack and Check actual job conditions before fabricatingwork. Report necessary changes in time to
<br /> 19 INSTALL SECTIONALIZING VALVES AND ON EACH BRANCH LINE TO MULTI-FIXTURE GROUPS. installation. Include sizes, locations and other required information to coordinate rainwater leaders. Additional cleanout shall be provided in a drainage line for each P ry g
<br /> LOCATE VALVES IN A READILY ACCESSIBLE LOCATION, DO NOT CONCEAL. DO NOT LOCATE installation with other trades. horizontal change of direction exceeding 135 degrees. Cleanout must be provided on a prevent needless work. Changes or additions, subject to additional compensation, which are
<br /> VALVE SYSTEMS BELOW HORIZONTAL UNLESS INDICATED ON PLANS. LOCATE ANGLE STOP VALVES BELOW THE horizontal drain line exceeding 5ft or more in length serving sinks or urinals. An approved made without written authorization and an agreed price, shall be at the Contractor's risk and SEAU
<br /> SINK OR WATER CLOSET. B. Within 5 days after award of contract, submit 6 copies of a letter stating any type of 2-way cleanout fitting shall be installed outside of a building at the lower end expense.
<br /> materials that contractor wishes to substitute, to the Owner for approval. Include of a building drain and extended to grade. �® �®®®kms
<br /> 20 WATER SUPPLY TO ALL FIXTURES AND CONTAINERS SHALL BE SO INSTALLED AS TO PREVENT POSSIBLE E5�/
<br /> BACK SIPHONAGE OF POLLUTED WATER. ALL SUPPLIES SHALL BE EITHER ABOVE THE FLOOD RIM OF THE such information as manufacturers name, type of material, certified ratings, 3.06 MARKING AND IDENTIFICATION Q
<br /> overall appearance, and necessary information to explain function and operation of 2.10 WATER HEATER �°d
<br /> FIXTURE OR SEPARATED FROM THE DRAINAGE END BY MEANS OF AN APPROVED VACUUM BREAKERS. PP ry P P 4,
<br /> material. All proposed substitutions shall be equal in quality, design, utility and A. All domestic cold water, hot water, sanitary sewer, sanitary vent, condensate drain, and ° '
<br /> ® . *. O -
<br /> 21 PROVIDE PIPING AND FIXTURE TRAPS. CONNECT TO FIXTURES AND OTHER EQUIPMENT INDICATED OR appearance to material, equipment or method specified. A. Provide anchors and straps to resist horizontal displacement due to earthquake motion. natural gas piping shall have visible permanent labels at every 20 feet, the direction of � . �'�
<br /> SPECIFIED AS REQUIRING SOIL, WASTE, DRAIN AND VENT FACILITIES. B. Stra in shall be located u er 1 3 and lower 1 3 of its vertical dimensions. Stra s normal flow shall be clearl shown, at least once er room, and shall be visible from the floor level. '� Z:
<br /> 1.07 AS-BUILT DRAWINGS Strapping PP / / P The minimum size of the letters shown on table 6 1 below. Valves shall be labeled with stenciled or % M269 1 �
<br /> shall be a minimum 2x16 gage properly secured to wall studs. Elevate water heater at iir�,
<br /> 22 LAY ALL PIPING TRUE TO LINE AND GRADE, FIT ENDS TOGETHER, MATCH SO THAT SEWER OR DRAIN WILL stamped metal tags bearing the name of the system they carry. '•. i�II tg • b
<br /> HAVE SMOOTH AND UNIFORM INSERT. FOLLOW LOCATIONS AND ELEVATIONS AT SITE. AS THE PIPE A set of plumbing plans will be furnished to the Contractor on which he shall least 4" minimum above the finished floor with an approved base. Provide a 22 gage ��A •.,IN
<br /> LAYING PROGRESSES, CLEAR PIPE INTERIOR OF CEMENT, DIRT, AND OTHER FOREIGN MATERIALS. DURING water tight drain pan, corrosion resistant, at the bottom of the water heater. Drain pan ,_6 �
<br /> indicate the installation "as-built" as the work progresses. Upon completion of the �> TABLE 6-1 ! CA01 fly
<br /> WORK STOPPAGE PERIODS, PROVIDE EFFECTIVE PLUGS OR COVERS FOR OPEN ENDS OF PIPE AND DRAINS. work, a set or reproducible drawings shall be obtained from the Owner r at cost, and all shall have a 3/4 drain line to be discharged into an approved receptor by means ����® ,;
<br /> of an air gap. A properly sized thermal expansion tank shall be provided at the water
<br /> changes as noted on the record set of prints shall be incorporated thereon. This PIPE SIZE (INCHES) SIZE OF LETTER (INCHES)
<br /> 23 PROVIDE CLEANOUTS WHERE INDICATED AND AT INTERVALS OF 100' OR AS REQUIRED BY LOCAL PLUMBING heater. Hot water supply for the lavatories and hand sinks shall not exceed 110°F temperature.
<br /> CODE AND WHERE REQUIRED AT CHANGES OF DIRECTIONS OF SOIL AND WASTE STACKS. INSTALL set of reproducibles, along with one set of blueprints, shall be delivered to the Ya - 1 Y4 Y2
<br /> CLEANOUTS SO AS TO BE ACCESSIBLE FOR EASY REMOVAL AND TO PROVIDE CLEARANCE FOR RODDING. Owner upon completion and before final acceptance of the project. 2.11 TRENCHING 1 YL - 2 3/4
<br /> CLEANOUTS SHALL BE THE SAME SIZE AS PIPE SERVED EXCEPT THAT NO CLEANOUT NEED BE LARGER THAN 2 Ya - 6 1 X
<br /> FOUR INCHES. 1.08 GUARANTEE A. All trenches deeper than the footing of any building or structure and paralleling the 8 - 10 2 Y2
<br /> 24 EXTEND VENT PIPES 12 INCHES ABOVE ROOF AND 1OFT MINIMUM AWAY FROM ANY FRESH AIR INTAKES AND The Contractor shall leave the entire installation in complete working order free same shall be at least 45 degrees therefrom.
<br /> AT LEAST 48 INCHES AWAY FROM A PARAPET WALL. from any defective material, workmanship or finish. He shall guarantee to repair or VALLEY SANITARY DISTRICT
<br /> replace, without charge, defects due to faulty workmanship or material for a period 3.00 - INSTALLATION AND EXECUTION GENERAL NOTES
<br /> 25 SANITARY VENT PIPING SHALL BE GRADED SO THAT THE AIRFLOW TO THE OUTSIDE WILL BE CONTINUOUSLY 1. Construction and materials for the onsite sewer system in public right-of-ways shall conform to the current
<br /> UPWARD AND SO THAT NO LOW POINTS WILL BE DRAINED. of one year from the date of filing of the Notice of Completion. 3.01 GENERAL Standard Specifications of the Valley Sanitary District. The on site system on private property shall conform to the
<br /> 1.09 OPERATION MANUALS AND OWNER INSTRUCTIONS current edition of the "California Plumbing Code".
<br /> 26 MAKE TIGHT CONNECTION BETWEEN WATER CLOSET FLANGES AND EARTHENWARE FIXTURE BY MEANS OF AN A. Cast-Iron Hubless with stainless steel shielded coupling shall be supported horizontally at every other
<br /> APPROVED MOLDED WAX RING OR SETTING COMPOUND AND BOLTING. joint, unless over 4 feet, then support each joint adjacent to joint, not to exceed 18", brace at not 2• ABS or PVC SCH 40 DWV pipe of PVC, PSM, SDR 35, ASTM D 3034-80 and PVC, PSP, SDR 41 ASTM D 3033-90
<br /> A. Provide complete operation and maintenance manuals covering all Plumbing
<br /> 27 VENTS: PROVIDE FLASHING FOR STACKS PASSING THROUGH ROOF. MAKE WATER-TIGHT AT ROOF. DO NOT systems and equipment that have been installed. Three (3) copies of the manual shall more than 40ft intervals, support at each horizontal branch connection. Hangers shall not be placed on non pressure pipe shall be used in sizes four (4) and six (6) inches only.the coupling. Support vertical pipes at the base and each floor not to exceed 15ft. Hangers and Supports �T INFORMATION:
<br /> LOCATE VENT THROUGH ROOF be bound in hardback binders. for all tin shall comply with the CPC 2010 Table 3-2. 3. Extra strength vitrified clay sewer pipe may be used in sizes four (4) inches and larger. ABS plastic drain, waste,
<br /> LESS THAN 24 INCHES FROM A PARAPET WALL. piping g P y and vent pipe having a foam core ASTM F628-81 may be used in four (4) inches or larger. All 4 inch plastic ARC® NTI
<br /> 28 ALL PLUMBING FIXTURES AND PIPING ARE TO BE LISTED BY AN APPROVED LISTING AND TESTING AGENCY B. Provide instructions to owner as to operation of all equipment. Instruction 3.02 SPECIAL REQUIREMENTS, RESPONSIBILITIES AND TESTING fittings must be schedule 40 per ordinance.
<br /> AND PROPERLY LABELED. period to commence for minimum of (2) hours and shall be scheduled at owners E �
<br /> pm/ QSR
<br /> convenience. A. Install piping generally level, free of traps and unnecessary bends, to conform 4. It shall be the responsibility of the sewer contractor to locate all existing utilities, verify elevations and notify all
<br /> with building requirements. Pipe to be free of defects, and installed to avoid any utility companies at least twenty-four 24 hours prior to construction.
<br /> 29 COORDINATE ALL LOCATIONS, SIZES, AND ELEVATIONS OF ALL SLEEVES THROUGH WALLS, BEAMS, SLABS AND Y P y- ( ) P FUEL Y
<br /> FOOTING WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS. ALL PIPES SLEEVING THROUGH FOOTINGS SHALL 1.10 CUTTING AND PATCHING possible galvanic action by isolating dissimilar metals. °�
<br /> HAVE A SLEEVE DIAMETER OF TWO PIPE SIZES OVER THE PIPE PASSING THROUGH THE FOOTING. NO PIPE TO 5. All sewer manholes frames and covers shall be left 6" below grade. Sewer contractor shall raise the frames and
<br /> BE PLACED THROUGH FOOTING UNLESS APPROVED BY THE STRUCTURAL ENGINEER. A. The contractor shall do all cutting, drilling and patching which may be required B. Test and record available domestic water pressure g static and dynamic conditions covers to finish grade upon completion of surfacing as per Valley Sanitary District Standards Drawing S-3.
<br /> 9 P 9 Y q For dynamic testing record pressure and flow rate in gallons per minute.
<br /> 30 ALL PIPES SHALL BE PROTECTED AT THE POINT THEY CROSS BUILDING EXPANSION JOINT, for the installation of the work under this Section of the Specifications. Transmit this information to the engineer before proceeding with the work. 6. All sewer laterals shall bae constructed to a point 1 foot behind sidewalk with a cleanout and cover brought to
<br /> EITHER WITH AN EXPANSION FITTINGS OR IN ANOTHER MANNER ACCEPTABLE TO THE ENGINEER. grade as per Valley Sanitary District Standards Drawing S-2. SITE A
<br /> B. Patching shall be of the same workmanship, material, and finish and shall match C. Provide all tests specified hereinafter and as otherwise required. Provide all
<br /> DDRESS-
<br /> 31 PLUMBING CONTRACTOR SHALL CONNECT ALL GAS PIPING TO ALL GAS RELATED UNITS PER PLAN WITH LISTED accurately all surrounding construction in a manner satisfactory to the Owner. No test equipment, including test pumps, gauges, instruments and other equipment 7. The Valle Sanitary District shall be notified twenty-four 24 heurs prior to construction twenty-four of the structure shall be permitted without written approval of the Owner. gY rY Y ( ) P action and a twenty four (24)
<br /> AND APPROVED GAS SHUT-OFF VALVE, SEDIMENT TRAP, AND UNION. 9 P PP required. Pressure gauges used shall be graduated in increments not greater than 5 notice for inspection is required.
<br /> 32 FAUCET CONTROLS SHALL BE OPERABLE WITH pounds per square inch.. No plumbing or drainage system or part thereof shall be @ HIGHWAY 120
<br /> PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER E HAND AND SHALL NOT REQUIRE TIGHT GRASPING, 2.00 - MATERIALS - PIPING covered, concealed, or put into use unless it has been specified. Conduct all tests 8. No trench work shall be covered until approval to do so had been givern by the VAlley Sanitary District inspector. ESCALON,CALIFORNIA
<br /> in the presence of the Owner's representative, and obtain the necessary
<br /> THAN 5 POUNDS. Building drain and vent piping materials shall comply with the local authority having jurisdiction. 9. As-built plans to be submitted to Valley Sanitary District prior to final acceptance.
<br /> All sanitary system materials shall be listed by an approved listing agency. jurisdictional authority inspections.
<br /> 33 PENETRATION OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE-RESISTANCE 10. The contractor shall arrange a Pre-Construction Conference at the District office at FACILITY D
<br /> RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE BUILDING CODE. A. Interior Underground Sanitary and Waste Piping: D. Apply a water test to the waste, and vent systems whether in its entirety or in least three working days prior to beginning any sewer work on the project.
<br /> No-Hub C.I. pipe and fittings or ABS DWV sch 40. sections; if applied to the entire system, tightly close all openings in the piping DESIGM eY ALUA
<br /> 34 WHERE WATER PRESSURE WITHIN A BUILDING EXCEEDS 80 PSI, AN APPROVED WATER-PRESSURE REDUCING P P g except the highest opening, and fill the system with water to the point of overflow. 11. The contractor shall present the District with a copy of his valid OSHA Trenching A �J o S S e i I I
<br /> VALVE CONFORMING TO ASSE 1003 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE PRESSURE IN THE Permit prior to beginning any sewer work on the project. 3:
<br /> BUILDING WATER DISTRIBUTION PIPING TO 80 PSI STATIC OR LESS. B. Interior Suspended Sanitary and Vent Piping: If the system is tested in sections, tightly plug each opening except for the --
<br /> 1. 3" and Larger - No-Hub C.I. or ABS DWV sch 40. highest opening of the section under test, and fill each section with water, but 12. Entry into all manholes must be done in accordance with CAL-OSHA Confined Space Engineering DRAM BY CE `
<br /> 35 DISINFECTION OF POTABLE WATER SYSTEM SHALL COMPLY WITH THE LOCAL AND THE STATE PLUMBING 2. 2" and Smaller - Schedule 40 galvanized steel pipe with screwed durham cast test with no less than a 10' head of water. In testing successive sections, test at Standards. 9
<br /> iron fittings for waste and vent , esC;9� CT K�
<br /> least the upper 10 of the next preceding section so that no joint or pipe in the 13. Manholes covers shall be cleaned to remove any debris. Covers shall have a L° L C.36 PROPER ACCESS MUST BE PROVIDED FOR THE TESTING AND MAINTENANCE OF THE BACKFLOW PREVENTER. IF building (except the uppermost 10' of the system) shall have been submitted to a bitumstic sealer applied to the surface of the material frame and cover. 17223
<br /> THE BACKFLOW PREVENTER IS INSTALLED MORE THAN 5'-O" ABOVE THE FLOOR, SPECIAL PROVISIONS C. Interior Domestic Water Piping Above Ground: pp
<br /> 3" and Smaller Type L hard tempered copper with solder end fittings. 95-5 tin test of less than a 10' head of water. Keep water in the system or in the portion
<br /> MUST BE MADE. yp P pp g under test for at least 24 hours before inspection starts, with the system tight at AWING TITLE-
<br /> 37 PROVIDE AND INSTALL A SINGLE GAS ISOLATION VALVE FOR THE MULTIPLE GAS METER BANKS FOR THE and antimony solder jointing (lead-free). all points. MECHANICAL - ELECTRICAL PLUMBING
<br /> ENTIRE BLDG. D. Outdoor Above Ground Domestic Water Piping: CIVIL - LEED
<br /> 3" and Smaller Type L hard tempered copper with solder end fittings. 95-5 tin E. Domestic water system shall be tested and proved tight under a pressure of not (GENERAL TE
<br /> 38 ALL PIPING SHALL MAINTAIN AT LEAST 5'-O" CLEARANCE IN FRONT OF THE HVAC SUPPLY AND RETURN yp P pp g less than 120 PSI. Piping must stand the test for a period of 24 hours without FIRE PROTECTION
<br /> OPENINGS. and antimony solder jointing (lead-free). leaking. 2100 112TH AVE. NE & SPECIFICATIONS
<br /> 39 PLASTIC PIPES ARE NOT PERMITTED TO BE INSTALLED WITHIN THE AIR PLENUM SPACE. E. Domestic Water Piping Below Ground: F. Chlorination of the domestic cold and hot water piping systems in accordance BELLEUUE WA 98004 SHEET Na
<br /> Type K copper pipe shall be used. When piping is installed within a building and under a concrete slab, it shall be s .
<br /> installed without joints. When joints are unavoidable the shall be brazed. with standard testing procedures and local health department requirements. Testing
<br /> 40 HUNG WASTE PIPING SHALL BE STRUCTURALLY SUPPORTED AS TIGHT AS POSSIBLE BELOW THE STRUCTURAL Y by a firm such as Bennet-Marine or equal. Submit certificate of satisfactory test PH: (425) 462-9441
<br /> BEAMS TO GAIN MORE HEAD SPACE AS IT PITCH TOWARDS THE LOWEST POINT TO KEEP WASTE PIPING a.Protective pipe covering shall be factory or field applied accordingly to manufacturers written instructions. results.
<br /> WITHIN THE CEILING SPACE. b.2 X" or larger: Products shall be Polyken No. 1027 primer and Polyken No. 910 tape coating, 10 mil, minimum FAX: (425) 462-9451
<br /> 1" overlap required. G. Upon completion of testing, certify to the Architect, in writing that the
<br /> 41 CONTRACTOR TO PROVIDE AND INSTALL QUICK DISCONNECT GAS LINES AT ALL COOKING EQUIPMENT. c.2" and smaller: Products shall be 10 mil plastic sleeve protector. specified tests have been performed and that the installation complies with the E-Mail: eservice@abosseia.eom
<br /> 42 NO NON-METALLIC PIPING IS ALLOWED WITHIN THE RETURN-AIR PLENUMS. specified requirements. www.(ibossein.com
<br /> H. Gas piping system shall be tested with 10 PSIG air for eight hours. 11 I
<br /> I I I I I I . - POM2