Laserfiche WebLink
25'-101 2"4'-71 2"9'-6"30'-112"5'-41 2"35'-111 2"11'-6" <br />1'-2"19'-0"26'-9"24'-0"8'-8"24'-0"5'-6"6"22'-212"24'-112"4'-0"8'-1"92'-7" <br />1'-2"19'-112"6'-4"20'-2"24'-0"8'-1"32'-3"9'-112"6'-4"28'-212"15'-7"30'-0"9'-512"3'-4"21'-4"8'-612"3'-4" <br />27'-7"1'-2"88'-0"14'-2"5'-6" <br />107'-712"16'-0" <br />26'-3"10'-0"36'-0"31'-2" <br />7'-6"8'-101 2"24'-0"5'-6"44'-8"45'-0"19'-4"6'-4"33'-512"34'-9"39'-812"6"4" <br />9'-2"4'-9"9'-2" <br />1'-012" <br />9'-2"2'-81 2"11'-112"1'-2"11'-212"9'-2"812"2'-2" <br />5'-0" <br />31 2"13'-612"8'-8" <br />5'-0" <br />1'-4"10"17'-0"3'-0"8'-312" <br />11'-812" <br />412" <br />11'-81 2" <br />41 2"1'-2"15'-7"3'-2"8"01A2.7 01A2.5 <br />01A2.6 <br />A <br />B <br />01 <br />02 <br />04 <br />05 <br />06 <br />07 <br />08 <br />09 <br />10 <br />11 <br />12 <br />131415 <br />16 <br />17 <br />18 <br />19 <br />A4.0 <br />A4.0 812"20'-0"24'-0"4'-0" <br />3"AAA <br />21 <br />21 <br />B <br />A <br />B <br />124'-0"107'-11"122'-111 2"109'-8"7'-512"412"412" <br />5'-0"5'-6"124'-0"8'-812"3'-412"3'-11 2" <br />11'-10"11'-11 2"3'-612"6'-4"4"Toddler Area <br />Large Playground <br />Baby <br />Area <br />Sand <br />Tables <br />Arcade <br />Area <br />8' Climbing Wall <br />Playhouse Area <br />Men <br />Women <br />Kitchen <br />Mop <br />Party <br />Room 1 <br />Check In <br />EntranceRedemptionPOS <br />Storage <br />Office <br />Maternity <br />Party <br />Room 2 Party <br />Room 3 <br />Party <br />Room 4 <br />Hall <br />Audio Video <br />CL CL <br />CL <br />CL <br />Storage 241 2" <br />7'-312" <br />412" <br />8'-0" <br />6" <br />8" <br />41 2" <br />12 <br />1 <br />1 <br />12 <br />10 <br />10 <br />10 <br />1 <br />1 <br />10 <br />4 <br />12 <br />1 <br />8 <br />8 <br />1 <br />COLUMN TABLE - FINISH SCHEDULE <br />MARK LOCATION NORTH EAST SOUTH WEST <br />A1 Playground 1'-3" finished 1'-3" finished 1'-3" finished 1'-3" finished <br />A2 Playground 1'-3" finished 1'-3" finished 1'-3" finished 1'-3" finished <br />B1 Playground 1'-3" finished 1'-3" finished 1'-3" finished 1'-3" finished <br />B2 Playground 1'-3" finished 1'-3" finished 1'-3" finished 1'-3" finished <br />•All column sizes are to the finished dimensions. <br />•All columns are existing steel, exposed. <br />•G.C. to Furr to these EXACT dimensions for pre fabricated foam wraps- see playground notes. <br />•Notify Architect and Luv 2 Play with any column discrepancies. <br />SCALE: <br />01 Floor Plan <br />1/8" = 1'-0"0 4 8 16 <br />1801 <br />job #dateissue descriptiondrawn bypm/picproject titleconsultantarchitect stampcopyrighttitlesheetarchitectall designs, ideas,arrangements and plansindicated by these drawingsand specifications are theproperty and copyright of theARCHITECT and shall neitherbe used on any other work norbe used by any other personfor any use whatsoever withoutwritten permission. writtendimensions shall takeprecedence over scaleddimensions and shall beverified at the job site. anydimensional discrepancy shallbe brought to the attention ofthe ARCHITECT prior to thecommencement of work.----------18.08.27----------City Submittal I----------ISOS--------WGA--3702 e. hammer ln.suite cstockton, ca 95212OWNER:Hammerlane Associates, LLCluv 2 play stocktonWGA wendy gilmartin architecture10371 mississippi ave.los angeles ca 90025323.793.1559213.334.3950307 W. Latham StreetPhoenix, Arizona 85003www.isosarchitecture.comBrent Armstrong 480 323 6928brent@isosarchitecture.comA2.2 <br />D i m e n s i o n e d <br />F l o o r p l a n <br />Playground General Notes: <br />1 All playground structures are diagramed on the floor plan with centerlines of the <br />playground structure in 24"x48” and 48”x48” increments. The playground structure <br />pipe is approximately 3” in diameter, approximately 4” in diameter with foam <br />padding. <br />2 Foam Flooring- 3/4” thick to be provided and installed by playground team. <br />General Contractor to coordinate floor transitions between foam flooring and any <br />additional flooring surface. <br />3 All playground structures, padding, netting, and accessories to be provided and <br />installed by playground install team. <br />4 General Contractor to ensure all utilities are free and clear of the large <br />playground structure near the ceiling, including but not limited to HVAC supply and <br />return, lighting, roof drains, sprinkler lines and sprinkler heads. <br />5 General Contractor to ensure that the space provided for the playground <br />equipment allows 6” minimum between any wall finish and centerline of the edge of <br />the playground structure, for installation. <br />6 General Contractor to coordinate electrical locations for arcade games and ball <br />blaster below large play structure, and in baby/toddler areas in the general <br />designated on the drawings. Specific locations of receptacles to be coordinated <br />with the playground installation team. Provide conduit as required on playground <br />structure behind foam. <br />7 General Contractor to coordinate the electrical locations of convenience <br />receptacles at the playground perimeter seating, below the “bar top". Provide <br />conduit as required. Conduit to be attached to the playground structure prior to <br />adding foam padding by others. All gaming receptacles to be set on timers or <br />separate switch. <br />8 Foam padding at structural columns to be provided and installed by Playground <br />Contractors. General Contractor to coordinate columns to receive foam padding. <br />See schedule for column sizes. General Contractor to build to and/or verify these <br />sizes are plumb. Smaller column sizes are acceptable, larger column sizes may <br />require revisions. <br />9 Entry area to have playground panels installed as noted, with counters for the <br />check in kiosk, movable foam benches, and plastic shoe cubbies. All of these items <br />are provided and installed by the playground install team. General contractor to <br />provide power and low voltage as needed for electronics in the gates and kiosks <br />prior to foam padding installation. <br />10. Playground foam material and all other playground materials meet CBC section <br />424.24 requirements;See spec book for ratings. <br />N NTrueProject <br />Wall Type Schedule: <br />1 3 5 8" Steel Stud w/ 5 8" Gyp. Board (both sides) <br />2 3 5 8" Steel Stud w/ 5 8" Green Board (both sides) <br />3 3 5 8" Steel Stud w/ 58"Green Board (wet side)/ 58" Gyp. Board (dry side) <br />4 6" Steel Stud w/ 5 8" Gyp. Board (both sides) <br />5 6" Steel Stud w/ 5 8" Green Board (both sides) <br />6 6" Steel Stud w/ 58"Green Board (wet side)/ 58" Gyp. Board (dry side) <br />7 8" Steel Stud w/ 5 8" Gyp. Board (both sides) <br />8 8" Steel Stud w/ 5 8" Green Board (both sides) <br />9 8" Steel Stud w/ 58"Green Board (wet side) / 58" Gyp. Board (dry side) <br />10 8" Masonry Wall w/ 3 5 8" Steel Stud w/ 5 8" Gyp. Board <br />11 8" Masonry Wall w/ 3 5 8" Steel Stud w/ 5 8" Green Board <br />12 Existing Stud Wall w/ 5 8" Gyp. <br />13 Existing Stud Wall w/ 5 8" Green Board <br />14 Existing demising wall 6" steel stud w/ 58 " Green Board <br />C-35047C-35047 <br />10.31.19