Laserfiche WebLink
LOBBYVESTMULTI-PURPOSELAUNDRYARTLOBBYVESTMULTI-PURPOSELAUNDRYARTF.D.ITEMTAGQTYDESCRIPTION1P11Soak Sink3P3125 LB Washer/extractors4*1Floor Trough6130 LB Dryers10P101Chemical Dispensers*1/2"1/2"3/4"3/4"1/2"ALL FLOOR OPENINGS TO BE SEALED WATERTIGHT.FLOOR ROUGH-INS TO STUB UP 2" ABOVE FINISHED FLOOR OR CURB. AREAS. ALL SUCH LINES ARE TO BE COLOR CODED ACCORDING TO LOCAL CODES.E. INSULATION ON ALL STEAM, HOT WATER AND CONDENSATE LINES IN THE LAUNDRYD. VACUUM BREAKERS AS REQUIRED BY EQUIPMENT MANUFACTURER.BUCKETS, SET FLUSH WITH FINISHED FLOOR, UNLESS NOTED OR REQUIRED BY CODES.C. ALL FLOOR SINKS, COMPLETE WITH TOP GRATES INDICATED, AND REMOVABLE SEDIMENTAND ANY OTHER EQUIPMENT AS REQUIRED BY MANUFACTURER.B. PRESSURE REDUCING AND/OR REGUALTING VALVES FOR DRYERSAT HEIGHT INDICATED FROM FINISHED FLOOR TO CENTER LINE OF OUTLET.ROUGH-IN AS SHOWN ON PLAN. ROUGH-IN OUTLETS TO STUB 4" OUT OF WALLSA. ALL WATER, WASTE, GAS, AIR AND STEAM SERVICE TO POINT OF4. PLUMBING DIVISION TO FURNISH AND INSTALL THE FOLLOWING:REQUIRED MATERIALS, SUCH AS STOPS, VALVES, FILTERS, TRAPS, CHECK VALVES, PIPING3. FINAL CONNECTIONS TO ALL EQUIPMENT TO BE BY PLUMBING DIVISION INCLUDINGSIZES, POSITIONS AND LOAD REQUIREMENTS. ANY DIMENSIONS SHOWN ARE FROM2. PLUMBING ROUGH-IN PLAN IS INTENDED TO SHOW LOCATIONS, HEIGHTS, CONNECTIONSEE ENGINEERING PLANS FOR ADDITIONAL PLUMBING INFORMATION.1. ALL CONNECTIONS SHOWN RELATE TO LAUNDRY EQUIPMENT ONLY.TUBING, ETC..FINISHED SURFACES.13P131Soak Sink1/2"1/2"LS-2 1/4" = 1'-0"LAUNDRY EQUIPMENT PLANJOB NO.:SHEET:DATE:REVISIONS:The Wolff CompanyÄ0QXReynolds Ranch Senior LivingLodi, California%114&+0#6+10%+6;%1//'0654'8+5+10LAUNDRY ELECTRICAL & PLUMBING PLAN'%JCODGTU5VTGGV2JQGPKZ#<X<br /> ÄHZ<br /> Ä 1/4" = 1'-0"LAUNDRY PLUMBING PLAN