My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 11:27:43 AM
Creation date
1/13/2023 9:04:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FFSD RO <br /> fill 11110 <br /> Facility Name . " I Owner . <br /> Address 7LILI (K Lr <br /> City, State , Zip Code . & CA CA q4S 2LI ? Phone . <br /> Testing Company. (� n Phone . 610 3 7 Z _ ) g >r Date . 1 Z . f0 ? 3 <br /> Product Grade : <br /> 1. REFER TO THE MANUFACTURER'S TANK CHART. <br /> Tank Volume (gal ) <br /> Tank Diameter Ift) Gi L <br /> 954 Tank Volume (gal ) <br /> ( r Multiply Tank Volume by 0 . 951 <br /> 95 %) Volume Height fin inches ) Based <br /> on Calculation Above <br /> 2. PERFORM THE OVERFILL PREVENTION VALVE INSPECTION. <br /> Inspection performed ? Flapper moves Yes Te, Yes 7 Yes r Yes o Y'es _ Yes <br /> freely into the flow path ? No No No i No i No No <br /> Measure "A ' lin ) . <br /> Subtract " Z " ( in ) D j <br /> Subtract 4 5 in 45 4 . 5 4 . 5 45 4 5 - 4 5 <br /> = Calculated 9500 Final Shutoff 2 2 2 2 2 2 <br /> Volume Height ( in inches) Based on �V <br /> Measurements Above <br /> Difference Between 1 and 2 (equal or <br /> less than = pass, greather than = fad ) 4'1A 5`j <br /> 3. DETERMINE WHETHER THE OVERFILL PREVENTION VALVE INSTALLATION PASSES THE INSPECTION. <br /> Find the Final Shutoff Volume in the <br /> manufacturer 's tank chart . Enter the 4O <br /> closest corresponding volume (gal) . <br /> - Divide by Actual TanN Capacity (gall 7 <br /> Multiply by 100 D CII I <br /> = Equals Final Shutoff Volume % L, ?J 24 T <br /> If the final shutoff volume percentage is 95 % or less , the installation meets FFS and industry recommended practices, This percentage <br /> can , however, exceed 95 % as long as the ullage volume remaining is greater than or equal to 250 gallons so that " none of the fittings <br /> located on the top of the tank are exposed to product due to overfilling " according to EPA 40 CFR, Part 280. The installation must also meet <br /> all applicable regulatory requirements, and must be acceptable to the Authority Having Jurisdiction , <br /> Enter Actual Tank Capacity ( gal ) <br /> Subtract Final Shutoff Volume (gal ) <br /> = Equals Ullage Volume Remaining (gal ) <br /> The OPV passes the installation Yes Yes Yes Yes Yes Yes <br /> inspection ? No No No No No No <br /> 'bmments <br /> Tester 's Name ( print) ` • tit nlLlt,t ( ' 1 Tester's Signature "Li <br /> - tr_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.