My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 11:27:43 AM
Creation date
1/13/2023 9:04:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) REGULAR PREMIUM DIESEL <br /> Are both vent and tank riser piping ❑Yes ❑Yes ❑Yes ❑Yes <br /> secondarily contained? ❑✓ No ❑✓ No ❑✓ No ❑ No <br /> OPE Model DEFENDER DEFENDER DEFENDER <br /> What is the OPE response when activated? OShut off OShut off Shut off ❑Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts ❑Restricts [—]Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑Audible ❑Audible ❑Audible ❑Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual ❑Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑Yes* ❑Yes* ❑Yes* ❑Yes* <br /> that may interfere with the OPE operation? ❑✓ No ❑✓ No ✓❑No ❑ No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 83.50 83.75 83.75 <br /> What is the percent capacity of the tank at <br /> 95.70% 95.88% 95.88% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ✓❑Yes ❑✓ Yes ❑✓ Yes ❑Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ❑ Pass ❑Pass ❑ Pass ❑ Pass <br /> ❑✓ Fail ❑✓ Fail ✓❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> All Failed Due to Being Over 95% Allowable. Replaced Drop Tube O-Rings on 87 & DSL Due <br /> to Being Damaged/Worn. <br /> * Mark here if: <br /> ❑Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.