Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMPIUDC TEST(continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standar! ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used:Incon Taster <br /> SumpJUDC ID UDC 112 UDC 314 UDC 616 UDC 718 <br /> Sump Manufacturer Bravo Bravo Brava Bravo <br /> Sump Depth (inches) 12" 12" 12" 12" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 4" 4" 4" 4" <br /> (inches) <br /> Test Start Time 12:43 pm 12:43 pm 12:43 pm 12:45 pm <br /> Initial Reading 1.9867 1.0973 1.608 LON`! <br /> Test End Time 12:58 pm 12:68 pm 12:58 pm 12:68 pm <br /> Final Reading 1.9864 1.09se 1.6655 Lem <br /> Change in Reading 0.0003 0.0005 0.0003 0.0001 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results O Pass ❑ Fail 0 Pass ❑ Fail ' 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> AN tests marked `Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4of5 <br />