Laserfiche WebLink
Presto, Carol [EHD] <br />From: Jennifer Manning <jmanning@Barghausen.com> <br />Sent: Monday, October 23, 2023 4:14 PM <br />To: Presto, Carol [EHD]; Rivera, Stacy [EHD] <br />Cc: Jay Grubb; Omar Vasquez; Alexia Inigues; Chealsea Biggs; Steven Nelson; Jamie Stewart <br />Subject: RE: CA - Costco Gasoline Tracy 658 / NOV for CERS ID 10146285 - Expansion / BCE # <br />10050.11 a <br />Good afternoon Carol, <br />We are reviewing the below and will provide responses as soon as possible. Thank you! <br />Jennifer Manning I Project Coordinator I Certified Class A/B Operator <br />Office: 425-251-6222 1 Direct: 425-656-7440 <br />Barghausen Consulting Engineers, Inc. <br />18215 72nd Avenue South, Kent, WA 98032 <br />www.barghausen.com <br />From: Presto, Carol [EHD] <cpresto@sjgov.org> <br />Sent: Monday, October 23, 2023 4:09 PM <br />To: Jennifer Manning <jmanning@Barghausen.com>; Rivera, Stacy [EHD] <srivera@sjgov.org> <br />Cc: Jay Grubb <jgrubb@barghausen.com>; Omar Vasquez <ovasquez@barghausen.com>; Alexia Inigues <br /><ainigues@barghausen.com>; Chealsea Biggs <cbiggs@barghausen.com>; Steven Nelson <snelson@barghausen.com>; <br />Jamie Stewart <jastewart@costco.com> <br />Subject: RE: CA - Costco Gasoline Tracy 658 / NOV for CERS ID 10146285 - Expansion / BCE #10050.11a <br />Good Afternoon Jennifer, <br />The document you submitted does not address the two items to close the last violation #203 that I requested. <br />- We need documentation on how Costco is complying with § 2712.(b) (1)Monitoring and maintenance records <br />shall be maintained for at least 36 months and (6) Records of repairs, lining, and upgrades shall be maintained <br />for the remaining life of the underground storage tank. Costco needs to provide documentation showing the <br />tank installation and upgrades. Refer to the inspection report from 11/8/2022 for more information. The <br />submitted document is a document discussing the plan of what will be done. It is a pre -project completion <br />document and not post -project completion document discussing what has been completed in regards to the <br />tank installation and upgrades. If you do not have a document discussing the tank installation and upgrades that <br />have occurred, please provide a statement that documentation for monitoring and maintenance records will be <br />maintained for at least 36 months moving forward. <br />Bruno stated that that Jones Covey was not on site until 10/10/2022 to replace the drop tube. Does this mean <br />the drop tube was not re-evaluated for functionality prior to being replaced on 10/10/2022? Bruno's email still <br />does not explain how the drop tube was evaluated for functionality. If you cannot provide documentation of <br />how the drop tubes were determined to be faulty, please provide a statement that documentation for <br />monitoring and maintenance records will be maintained for at least 36 months moving forward. <br />The 7/17/2023 6 month post installation secondary containment test is missing information in section 7 in the table for <br />87A Product Line but is marked as "pass". Please resubmit the test results to EHD to UST@sigov.or <br />I noticed you were also the last to make a CERS submittal for this facility. That CERS submittal: <br />