Laserfiche WebLink
C <br /> MARK AND CUT THE DROP TUBES <br /> 1. Mark the upper drop tube with the length X. <br /> Upper Drop Tubes <br /> Dual Point <br /> Measure from flange <br /> X <br /> Lj l Poppeted Coaxial (EBW) <br /> Measure from retaining ring <br /> X <br /> Non-Poppeted Coaxial (EBW) <br /> Measure from bottom of lug <br /> I� X <br /> OPW®Inlet Tube (for use with OPW°spill containers) <br /> Measure from end without flange,then remove flanged top <br /> I <br /> X <br /> 2. Mark the lower tube with the length Y. <br /> Lower Drop Tube <br /> Cut straight <br /> j <br /> I /Option: <br /> cut approx.450 <br /> Y 0.1 <br /> NOTE: FFS recommends the FFS pipe cutter, but if you use a metal saw to cut the drop tube, <br /> make sure you cut it as squarely as possible. Use the band clamp included with the warning tag <br /> as a guide. <br />�-.. 8 C <br />