Laserfiche WebLink
1 <br /> Use wrenches in this area. Use wrenches in this area. <br /> Do not use wrenches in this area. <br /> 4. Spill containment must be grounded to earth to discharge any static electricity. <br /> 5. Carefully lower the completed OPV assembly into the riser pipe. <br /> Do not drop the assembly or force it down the riser pipe. If it does not fit, clean the riser <br /> pipe, and attempt to insert the OPV assembly again. If it still does not fit, the riser pipe may <br /> need to be replaced. <br /> 6. Reinstall the spill bucket components. <br /> 7. Use the stainless steel band clamp to install the warning plate around the 4" (102 mm) riser <br /> pipe below the threaded section. <br /> 8. Perform the operational inspection procedure. <br /> 12 <br />