My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION WORKSHEET <br /> Facility Name: owner: <br /> Address: <br /> City,State,Zip Code: Phone: <br /> Testing Company: Phone: Date: <br /> Product Grade: <br /> 1.REFER TO THE MANUFACTURER'S TANK CHART. <br /> Tank Volume(gal) <br /> Tank Diameter(ft) <br /> 95%Tank Volume(gal) <br /> (x Multiply Tank Volume by 0.95) <br /> 95%Volume Height(in inches)Based 1 1 1 1 1 1 <br /> on Calculation Above <br /> 2.PERFORM THE OVERFILL PREVENTION VALVE INSPECTION. <br /> Inspection performed?Flapper moves Yes Yes ❑ Yes Yes ❑ Yes ❑ res o <br /> freely into the flow path? No No ❑ No No ❑ No ❑ No <br /> Measure"A'(in) <br /> Subtract"Z"(in) <br /> Subtract 4.5 in -4.5 -4.e -4.5 -4.5 45 45 <br /> =Calculated 95% Final Shutoff 2 2 2 2 2 2 <br /> Volume Height(in inches)Based on <br /> Measurements Above <br /> Difference Between t and 2(equal or <br /> less than=pass,greather than=fail) <br /> 3.DETERMINE WHETHER THE OVERFILL PREVENTION VALVE INSTALLATION PASSES THE INSPECTION. <br /> Find the Final Shutoff Volume in the <br /> manufacturer's tank chart.Enter the <br /> closest corresponding volume(gap. <br /> Divide by Actual Tank Capacity(gal) <br /> x Multiply by 100 <br /> =Equals Final Shutoff Volume% <br /> If the final shutoff volume percentage is 95%or less,the installation meets FFS and industry recommended practices.This percentage <br /> can,however,exceed 95%as long as the ullage volume remaining is greater than or equal to 250 gallons so that"none of the fittings <br /> located on the top of the tank are exposed to product due to overfilling"according to EPA 40 CFR,Part 280.The installation must also meet <br /> all applicable regulatory requirements,and must be acceptable to the Authority Having Jurisdiction. <br /> Enter Actual Tank Capacity(gal) <br /> Subtract Final Shutoff Volume(gal) <br /> =Equals UllageVolume Remaining(gal) <br /> The OPV passes the installation Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ <br /> inspection? No ❑ No ❑ No ❑ No ❑ No ❑ No ❑ <br /> Comments: <br /> Tester's Name(print) Tester's Signature <br /> w19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.