My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 12:32:29 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Verification of leak monitoring communication for all installed vacuum, pressure, or hydrostatic (VPH) <br /> components including piping, sumps, under dispenser containment sumps (UDCs), and all chase <br /> lines. Communication at end points of each vacuum zone and each vacuum monitored sump must be <br /> verified independently in operating condition. <br /> • Verification of the dispenser footprints contained by the UDCs. Any potential leaks from piping and fuel <br /> filters must drain directly into UDCs. <br /> • Verification of VPH components installation (shroud boots and band clamps for spill containers, <br /> appropriate rubber-type gasket or clamps on lids on all fill, vent and STP sumps, etc.). <br /> • Verification of overfill prevention: Measurement of drop tubes to verify 95% tank volume shut off and/or <br /> verification that external audible/visual alarm activates when tank is 90% full. <br /> • Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic test (or equivalent). <br /> Proper drainage method must be verified. <br /> • Monitoring system functionality: Functionality of the monitoring system must be verified to ensure it <br /> meets the requirements of California Code of Regulations (CCR)Title 23 and California Health & Safety <br /> Code (HSC) Chapter 6.7. <br /> ELD will be completed (tentatively) on 8-25 and will be submitted for review as soon as reasonably possible. <br /> Dates may be merged depending on testing company. <br /> Respectfully, <br /> �o6elf� ���a��cum <br /> Project Superintendent <br /> 909-276-0789 <br /> jmalcolm@ionescovey.com <br /> ►,� JCIN ESCOVEY GROUP,INC. <br /> This e-mail and any files transmitted with it are the property of Jones Covey Group,Inc are confidential,and are intended solely for the use of the individual or entity to whom this e-mail is addressed. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.