Laserfiche WebLink
• Verification of leak monitoring communication for all installed vacuum, pressure, or hydrostatic (VPH) <br />components including piping, sumps, under dispenser containment sumps (UDCs), and all chase <br />lines. Communication at end points of each vacuum zone and each vacuum monitored sump must be <br />verified independently in operating condition. <br />• Verification of the dispenser footprints contained by the UDCs. Any potential leaks from piping and fuel <br />filters must drain directly into UDCs. <br />• Verification of VPH components installation (shroud boots and band clamps for spill containers, <br />appropriate rubber -type gasket or clamps on lids on all fill, vent and STP sumps, etc.). <br />• Verification of overfill prevention: Measurement of drop tubes to verify 95% tank volume shut off and/or <br />verification that external audible/visual alarm activates when tank is 90% full. <br />• Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic test (or equivalent). <br />Proper drainage method must be verified. <br />• Monitoring system functionality: Functionality of the monitoring system must be verified to ensure it <br />meets the requirements of California Code of Regulations (CCR) Title 23 and California Health & Safety <br />Code (HSC) Chapter 6.7. <br />ELD will be completed (tentatively) on 8-25 and will be submitted for review as soon as reasonably possible. <br />Dates may be merged depending on testing company. <br />Respectfully, <br />'A,# a" <br />Project Superintendent <br />909-276-0789 <br />imalcolm@ionescovey.com <br />JCIN ES COVEY GROUP, INC. <br />This e-mail and any files transmitted with it are the property of Jones Covey Group, Inc are confidential, and are intended solely for the use of the individual or entity to whom this e-mailis addressed. <br />