My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />T1 87A <br />T2 87B <br />T3 87C <br />T4 91 <br />Are both vent and tank riser piping <br />® Yes <br />® Yes <br />® Yes <br />® Yes <br />secondarily contained? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />OPE Model <br />EBW <br />EBW <br />EBW <br />EBW <br />What is the OPE response when <br />® Shut off <br />® Shut off <br />M Shut off <br />® Shut off <br />activated? <br />Flow <br />Flow <br />Flow <br />Flow <br />(Check all that apply.) <br />❑ Restricts <br />❑ Restricts <br />❑ Restricts <br />❑ Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />piping that may interfere with the OPE <br />® No <br />® No <br />® No <br />® No <br />operation? <br />At what level in the tank is the OPE <br />103.5 inch <br />103.5 inch <br />103.5 inch <br />106.25 inch <br />set to activate? Inches from bottom of <br />What is the percent capacity of the <br />93.5% <br />93.5% <br />93.5% <br />94% <br />tank at which the OPE activates? <br />Is the OPE in proper operating <br />® Yes <br />® Yes <br />® Yes <br />® Yes <br />condition to respond when the stored <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />substance reaches the designated <br />regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />® Pass <br />® Pass <br />® Pass <br />® Pass- <br />ass❑ <br />OPE Inspection Results <br />0Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.