My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: For additional information, refer to the Defender Series° Overfill Prevention Valve <br />Installation Guide. <br />1. Determine Dimension A: <br />• Measure from bottom of the tank to the top of OPW face seal adaptor in the OPW spill <br />container. <br />2. Determine Dimension X: <br />• Measure required length for the upper drop tube from the non -flanged end. <br />• Remove the flanged top. <br />• Follow steps 3 to 16 in OPW 71SO Installation & Maintenance Instructions (H15524PA) <br />referenced in Executive Order VR -102 to cut the upper drop tube and install the OPW <br />inlet tube. <br />3 <br />Remove the flanged top of the upper drop tube. <br />OPERATIONAL INSPECTION <br />Use the FFS remote test tool to inspect the OPV. <br />PW <br />1. Assemble the remote test tool with enough extension sections to reach the OPV. <br />2. Insert the remote test tool into the drop tube. You should feel a "pull" when the magnets <br />are positioned correctly and attract. <br />3. Slowly raise the remote test tool about 1%" (38 mm). You should see the flapper move into <br />the flow path. If you see the flapper moving back and forth, the OPV is functioning normally. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.