Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1 87A T2 87B T3 87C T4 91 <br /> Are both vent and tank riser piping ® Yes ® Yes ® Yes ® Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model EBW EBW EBW EBW <br /> What is the OPE response when ® Shut off ® Shut off ® Shut off ® Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> piping that may interfere with the OPE ® No ® No ® No ® No <br /> operation? <br /> At what level in the tank is the OPE 103.5 inch 103.5 inch 103.5 inch 106.25 inch <br /> set to activate? Inches from bottom of <br /> What is the percent capacity of the 93.5 % 93.5 % 93.5 % 94 % <br /> tank at which the OPE activates? <br /> Is the OPE in proper operating ® Yes ® Yes ® Yes ® Yes <br /> condition to respond when the stored ❑ No ❑ No ❑ No ❑ No <br /> substance reaches the designated <br /> regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass ® Pass ® Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />