My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jones Covey Group, Inc. <br />9595 Lucas Ranch Rd. <br />Rancho Cucamonga, CA 91730 <br />888-972-7581 <br />Costco 658 Tracy <br />3250 W Grantline Rd. <br />Tracy, CA 95304 <br />Job Details <br />Jones Covey Group <br />9595 Lucas Ranch Rd. <br />Rancho Cucamonga, CA 91730 <br />Job Order Trip Field <br />Trip Date <br />PO # <br />Tech Name <br />2254140-1-2 <br />Posted <br />1111111111111111111111111111 <br />2254140-1 <br />8/26/22 <br />GC21030 <br />Shawn P Rodriguez <br />Description: <br />............................................................................................................................................................................................................................................................................................................................................................................................ <br />08/25 - Beto Drive Day - Take the calibration trailer and purge hoses. <br />Onsite 08/26 - 08/30 please be onsite at 7am 08/26 <br />Purge/Calibrate <br />Test the Line & Leak Detector <br />Assist GC with any other items needed <br />09/01 beto drive home <br />............................................................................................................................................................................................................................................................................................................................................................................................ <br />Completion Notes: <br />8/26/22 Shawn/Alberto: <br />Arrived on site and checked in with Austin Downey Project Manager and Roberto Benito from construction. While on site <br />today we installed new Franklin Fueling drop tubes for all tanks. Drop tubes were installed at or below 95% tank capacity. At <br />this time the new premium tank did not have fuel and the vapor recover piping was not plumbed in. Because of these reason <br />a drop tube and leak decay testing was not performed. We also assisted construction by installing two FE Petro Turbin motors <br />for new 91 tank, connected product and vapor return piping for 91 lines, and assisted with tracking down leaks from ELD <br />testing. By end of day the 91 Tank did not have fuel, 91 turbines still needed to be wired, all dispensers did not have power, <br />and vapor recovery line was still not plumbed in. Construction did not have keys for old dispensers so we could not access the <br />upper cabinet. <br />Product Description Order Quantity Order <br />Uom <br />Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.