Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />T1 -87A <br />T2 -87B <br />T3 -87C <br />T5-91 <br />Are both vent and tank riser piping <br />521 Yes <br />52 Yes <br />52 Yes <br />52 Yes <br />secondarily contained? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />OPE Model <br />Defender 708590 <br />Defender 708590 <br />Defender 708590 <br />Defender 708590 <br />What is the OPE response when activated? <br />[0 Shut off <br />52 Shut off <br />5? Shut off <br />2 Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Restricts <br />❑ Restricts <br />❑ Restricts <br />❑ Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />521 No <br />52 No <br />52 No <br />521 No <br />At what level in the tank is the OPE set to <br />activate? Inches from bottom of tank <br />105 5/8" <br />105 5/8" <br />105 5/8" <br />106" <br />What is the percent capacity of the tank at <br />94% <br />94% <br />94% <br />94% <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />[0 Yes <br />52 Yes <br />52 Yes <br />5a Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />52 Pass <br />52 Pass <br />52 Pass <br />52 Pass <br />OPE Inspection Results <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />New installation of Franklin Fueling Drop tubes for Tank 1-87A, Tank 2-87B, Tank 3-87C, and Tank 5-91. All Drop <br />tubes were installed below 95% tank capacity. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />