My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A = The distance from the seat surface of the upper drop tube to the bottom of the underground <br />storage tank. The seat surface will vary depending on the type of installation. See below. <br />Underneath Fill Adapter Underneath Bucket Inside Bucket <br />(EBW Legacy Series) (Phil-Tite Series) (Defender Series) <br />NOTE: If you are installing into an OPW® spill container, measure from the bottom of the tank to <br />the top face of the OPW® seal adaptor in the OPW® spill bucket. <br />B = FINAL SHUTOFF VOLUME HEIGHT-- According to industry recommended practices, FFS <br />recommends that you set the final shutoff volume to a maximum of 95% of the actual tank <br />capacity. To find the final shutoff volume height, multiply the actual tank capacity (gallons) by <br />the final shutoff volume percentage. (If you are using 95% tank volume, multiply the actual tank <br />capacity by .95.) You then locate the closest volume on the tank chart (provided by the tank <br />manufacturer), and record the corresponding height for "B." <br />** NOTE: To accommodate tank tilt or increased/decreased usage of tank capacity, the final <br />shutoff volume can be adjusted to a value other than 95%, providing it meets all applicable <br />regulatory requirements, and is acceptable to the Authority Having Jurisdiction (AHJ). If the final <br />shutoff volume is not installed at 95%, the installing contractor should document the new volume <br />as intended and include it with the station records as reference for compliance inspections. The <br />installing contractor can do this on the "OPV Installation Record Sheet" or any other applicable <br />station records. <br />If the final shutoff volume is installed greater than 95%, make sure in all cases that there is at <br />least 250 gallons of ullage volume remaining so that "...none of the fittings located on the top of <br />the tank are exposed to product due to overfilling" according to EPA 40 CFR Part 280. <br />
The URL can be used to link to this page
Your browser does not support the video tag.