My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION WORKSHEET <br />LIST OVERFILL EQUIPMENT INSPECTION - DEFENDER SERIES" OVERFILL PREVENTION VALVE <br />Facility Name: owner: <br />Address: <br />City, State, Zip Code: <br />Phone: <br />Testing Company: <br />Phone: <br />Date: <br />Product Grade: <br />1. REFER TO THE MANUFACTURER'S TANK CHART. <br />Tank Volume (gal) <br />Tank Diameter (ft) <br />95%Tank Volume (gal) <br />(x Multiply Tank Volume by 0.95) <br />95% Volume Height (in inches) Based <br />on Calculation Above <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2. PERFORM THE OVERFILL PREVENTION VALVE INSPECTION. <br />Inspection performed? Flapper moves <br />freely into the flow path? <br />Yes ❑ <br />No ❑ <br />Ye, <br />no <br />Yes ❑ <br />No ❑ <br />gee <br />no <br />Yes ❑ <br />No ❑ <br />Yes ❑ <br />No ❑ <br />Measure 'A" (in) <br />Subtract "Z" (in) <br />Subtract 4.5 in <br />1 5 <br />1 5 <br />1 5 <br />4.5 <br />1 5 <br />= Calculated 95% Final Shutoff <br />Volume Height (in inches) Based on <br />Measurements Above <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />Difference Between 1 and 2 (equal or <br />less than = pass, greather than = fail) <br />3. DETERMINE WHETHER THE OVERFILL PREVENTION VALVE INSTALLATION PASSES THE INSPECTION. <br />Find the Final Shutoff Volume in the <br />manufacturer's tank chart. Enter the <br />closest corresponding volume (gal). <br />Divide by Actual Tank Capacity (gal) <br />x Multiply by 100 <br />= Equals Final Shutoff Volume % <br />If the final shutoff volume percentage is 95% or less, the installation meets FFS and industry recommended practices. This percentage <br />can, however, exceed 95% as long as the ullage volume remaining is greater than or equal to 250 gallons so that "none of the fittings <br />located on the top of the tank are exposed to product due to overfilling" according to EPA 40 CFR, Part 280.The installation must also meet <br />all applicable regulatory requirements, and must be acceptable to the Authority Having Jurisdiction. <br />Enter Actual Tank Capacity (gal) <br />-Subtract Final Shutoff Volume (gal) <br />= Equals UllageVolume Remaining (gal) <br />The OPV passes the installation <br />inspection? <br />Yes ❑ <br />No ❑ <br />Yes ❑ <br />No ❑ <br />Yes ❑ <br />No ❑ <br />Yes ❑ <br />No ❑ <br />Yes ❑ <br />No ❑ <br />Yes ❑ <br />No ❑ <br />Comments: <br />Tester's Name (print) Tester's Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.