Laserfiche WebLink
<2��> <br />Jones Covey Group, Inc. <br />9595 Lucas Ranch Rd. <br />Rancho Cucamonga, CA 91730 <br />888-972-7581 <br />Job Details <br />!.M <br />T2 has an overfill flapper that is faulty and JCG will need to replace the drop tube, <br />Job Order Field <br />2256026-1 <br />Posted <br />13140933 <br />Completion Notes: <br />10/10/22: Arrived onto site, checked in with site attendant. Unable to check in/out of FMS. Explained reason for being present <br />on site. On site to install a Defender Series Drop Tube inside of Tank 2 87B. <br />Installed a Defender Series Drop Tube inside of Tank 2 87B at 94% of the total tank capacity. <br />Conducted 201.3 Static Pressure Performance Test and Drop Tube integrity Test. Both tests passed with no issues found. <br />Testing reports were submitted to Testing Test Reports. <br />Nothing else to be noted at this time. Installation of Drop Tube and testing is completed. <br />Product I Description <br />Order Order <br />Quantity Uom <br />EBW708692902 OVERFILL, 10' TOP / 10' BOTTOM <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />1 each <br />FSC - Gilbarco Fuel Surcharge <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />1 <br />Travel - Gilbarco O' Travel Charges - Overtime <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />5 <br />Mileage - Gilbarco Mileage Tech 1 <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />230 <br />Labor - Gilbarco 01 Labor Charges - Overtime <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />4 <br />Travel - Gilbarco 0' Travel Charges - Overtime 10/10 Tech 1 <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />5 <br />Mileage - Gilbarco Mileage <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />230 <br />Labor - Gilbarco 01 Labor Charges - Overtime <br />......................................................................................................................................................................................................................................................................................................................................................................................... <br />4 <br />Permit Fee Billing Permit Fee <br />1 <br />Signed By Signed By <br />