My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200-12 <br />records or the ATG readout. Prepare a monitoring <br />fluid solution to add to the interstitial space. <br />4.3.6 Steel Tanks. Liquid -filled (hydrostatic) <br />tests on steel tanks require the same fluid as the <br />monitoring fluid. Contact the manufacturer for <br />instructions. <br />4.3.7 Fiberglass Tanks. Determine tank size <br />and diameter and apply the appropriate method. <br />4.3.8 Test Equipment. Test equipment shall <br />include: <br />• monitoring fluid; <br />• stopwatch or other time -measurement device <br />capable of measuring a 1 -second increment; <br />• tape measure. <br />4.3.9 Test Procedure. <br />5.. PIPING SECONDARY <br />CONTAINMENT INTEGRITY <br />TESTING <br />5A General. Underground product piping is available <br />with single and double walls. Double -walled piping pro- <br />vides containment for leaks from primary containment <br />and must be leak -free to prevent release of product into <br />the environment. <br />5.2 Purpose. This method is used to test the integrity <br />of piping interstitial space(s). <br />5.3 Description of Test. The interstitial space is <br />seated at the ends and is pressurized with an inert gas. <br />The pressure is monitored for 1 hour. If any pressure drop <br />occurs, the secondary containment fails the test. <br />1. Remove any sensor that may be installed in the 5.4 Test Conditions. The primary pipe may contain <br />tank interstitial space. fuel, and dispensing activities may continue during the <br />test without affecting test results. <br />2. Determine and record the groundwater level. <br />5.5 Preparation. If the interstitial space contains prod - <br />3. Add test liquid to the tank interstitial space uct, ensure that the interstice is open to the atmosphere <br />bringing the fluid level into the riser (stand- and perform a precision test on the primary piping before <br />pipe) to the appropriate level based on the conducting a test on the secondary containment piping. <br />manufacturer's written procedure. <br />4. Document the starting level and start time of Termination fittings must be sealed at all piping termina- <br />the test. tions, and test fittings must be accessible to perform the <br />Lest. <br />5. Start the time -measurement device. <br />6. Wait the appropriate time according to the <br />manufacturer's test procedure. <br />7. Document the ending level and ending time of <br />the test. <br />S. Determine and record the groundwater level. <br />9. Remove liquid added to the tank interstitial <br />space, and restore the liquid level in the tank <br />interstitial to normal operating condition. <br />10. Reinstall the sensor so that it is installed within <br />manufacturer's specifications. <br />4.3.10 Pass/Fail Criteria. Compare the data to <br />the manufacturer's pass/fail criteria in Appendix A <br />to determine if the tank has passed the test. <br />0 <br />pei.org <br />Check with the piping manufacturer regarding testing <br />procedures and the proper pressure before testing. Test- <br />FIGURE 5-1. Boots on piping transitions and through <br />sump walls must be leak -tight when piping secondary <br />containment integrity testing is performed. <br />1� <br />iii f_,• { .� _ <br />{��'-y:5 � <br />3 K <br />, <br />Aq- <br />vY> <br />FIGURE 5-1. Boots on piping transitions and through <br />sump walls must be leak -tight when piping secondary <br />containment integrity testing is performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.