Laserfiche WebLink
PEI/RP1200-12 <br />records or the ATG readout. Prepare a monitoring <br />fluid solution to add to the interstitial space. <br />4.3.6 Steel Tanks. Liquid -filled (hydrostatic) <br />tests on steel tanks require the same fluid as the <br />monitoring fluid. Contact the manufacturer for <br />instructions. <br />4.3.7 Fiberglass Tanks. Determine tank size <br />and diameter and apply the appropriate method. <br />4.3.8 Test Equipment. Test equipment shall <br />include: <br />• monitoring fluid; <br />• stopwatch or other time -measurement device <br />capable of measuring a 1 -second increment; <br />• tape measure. <br />4.3.9 Test Procedure. <br />5.. PIPING SECONDARY <br />CONTAINMENT INTEGRITY <br />TESTING <br />5A General. Underground product piping is available <br />with single and double walls. Double -walled piping pro- <br />vides containment for leaks from primary containment <br />and must be leak -free to prevent release of product into <br />the environment. <br />5.2 Purpose. This method is used to test the integrity <br />of piping interstitial space(s). <br />5.3 Description of Test. The interstitial space is <br />seated at the ends and is pressurized with an inert gas. <br />The pressure is monitored for 1 hour. If any pressure drop <br />occurs, the secondary containment fails the test. <br />1. Remove any sensor that may be installed in the 5.4 Test Conditions. The primary pipe may contain <br />tank interstitial space. fuel, and dispensing activities may continue during the <br />test without affecting test results. <br />2. Determine and record the groundwater level. <br />5.5 Preparation. If the interstitial space contains prod - <br />3. Add test liquid to the tank interstitial space uct, ensure that the interstice is open to the atmosphere <br />bringing the fluid level into the riser (stand- and perform a precision test on the primary piping before <br />pipe) to the appropriate level based on the conducting a test on the secondary containment piping. <br />manufacturer's written procedure. <br />4. Document the starting level and start time of Termination fittings must be sealed at all piping termina- <br />the test. tions, and test fittings must be accessible to perform the <br />Lest. <br />5. Start the time -measurement device. <br />6. Wait the appropriate time according to the <br />manufacturer's test procedure. <br />7. Document the ending level and ending time of <br />the test. <br />S. Determine and record the groundwater level. <br />9. Remove liquid added to the tank interstitial <br />space, and restore the liquid level in the tank <br />interstitial to normal operating condition. <br />10. Reinstall the sensor so that it is installed within <br />manufacturer's specifications. <br />4.3.10 Pass/Fail Criteria. Compare the data to <br />the manufacturer's pass/fail criteria in Appendix A <br />to determine if the tank has passed the test. <br />0 <br />pei.org <br />Check with the piping manufacturer regarding testing <br />procedures and the proper pressure before testing. Test- <br />FIGURE 5-1. Boots on piping transitions and through <br />sump walls must be leak -tight when piping secondary <br />containment integrity testing is performed. <br />1� <br />iii f_,• { .� _ <br />{��'-y:5 � <br />3 K <br />, <br />Aq- <br />vY> <br />FIGURE 5-1. Boots on piping transitions and through <br />sump walls must be leak -tight when piping secondary <br />containment integrity testing is performed. <br />