Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for AISLE 1 #2356 as of October 18, 2022. <br /> 1 <br /> Open violations from July 13, 2022 inspection <br /> Violation#208 - Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the overfill test in the <br /> designated operator inspection reports. From 12/31/2021 to 6120122, overfill test date was not noted. The correct <br /> date for overfill testing is 711012018. <br /> REGULATION GUIDANCE: During the Inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> �k <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The 2/25/2022 designated operator report was not signed by the owner/operator. <br /> REGULATORY GUIDANCE Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report, Within 72 <br /> hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> i required time frame in the future. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#304-Failure to construct, operate, and maintain primary containment as product-tight. <br /> OBSERVATION: A pipe in dispenser 516 has drip, indicating a leak in the primary containment. <br /> REGULATION GUIDANCE: All primary containment for the UST system must be product tight, <br /> CORRECTIVE ACTION: Immediately have a properly licensed, trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> ❑ This violation was corrected ❑ This violation will be corrected by(date): <br /> ❑ Supporting documents Included <br /> Describe actions taken or will be taken to correct violation: <br /> i <br /> Page 1 of'I <br />