My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 1:27:00 PM
Creation date
1/13/2023 9:56:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
91/23,9:13 AM ServiceChannel <br /> REPAIRS NEEDED <br /> FUEL ISLAND/FUEL CANOPY/COMPLIANCE/UST <br /> s� COMPLETED FUEL <br /> CONFIRMED SYSTEM <br /> P4 (20 BUSINESS REPAIR <br /> DAYS) <br /> 252231884 14 Days 18 Hrs 750.00 USD 2356(No Cal -N-CA) <br /> Tracking Age NTE 2356 <br /> 4219 East Morada Lane <br /> Aug 19,2023 23:09 PST 6 59371 90 8 Stockton,CA 95212,US <br /> Updated Closing Authorization (209)472-9842 <br /> Aug 28,202308:00 PST 6621-00 Walton Engineering, Inc. <br /> Scheduled GL Code Shawn Murray <br /> Ser\,ice@waftonengineering.com <br /> Aug 28,2023 08:00 PST dashboard3696 916-372-1888 <br /> Orig.ETA Source <br /> Erin Acosta <br /> Jul 30,2023 21:17 PST <br /> Created by <br /> Aug 14,2023 15:30 PST <br /> Work Date 0 <br /> 6 Aug 14,2023 Created By service@waltonengineering.com Walton Engineering,Inc. <br /> 15:31 PST <br /> Work Summary: Performed Job Safety Analysis and uploaded JSA form to Walton Work Orders. <br /> #9/10 remove liquid from UDC's and clean debris check for leaks.Inspected#9/10 for leaks <br /> and found#10 diesel filter leaking and 87 meter leaking from bottom of meter.Removed small <br /> amount of liquid from UDC by use of absorbent and left on site in solid tagged hazmat drum <br /> dated 031023 and is full.Tightened filter and bottom of meter and leaks stopped. Returned <br /> dispenser keyto clerk.Al in service with no products dispensed and observed customers <br /> dispense with no problems.Filled out maintenance and vendor logs. Checked in/out of <br /> Service Channel. <br /> Scheduled Aug 28,202308:00 PST <br />
The URL can be used to link to this page
Your browser does not support the video tag.