My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
255
>
2300 - Underground Storage Tank Program
>
PR0537549
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 11:49:02 AM
Creation date
1/17/2023 11:06:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0537549
PE
2351
FACILITY_ID
FA0021617
FACILITY_NAME
HARNEY LANE AM PM
STREET_NUMBER
255
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
062-580-40
CURRENT_STATUS
01
SITE_LOCATION
255 E Harney Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix VI <br /> Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated rate verified: (Check all that apply) <br /> ® 3 GPH El0.1 GPH [:] 0.2GPH Yes No NA <br /> Has the testing apparatus been properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual ❑ ❑ <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a leak is ® ❑ ❑ <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ® ❑ ❑ <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ® ❑ ❑ <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected ® ❑ ❑ <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist ® ❑ ❑ <br /> completed? <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> Q1 PLLD 87 ® ❑ <br /> Q2 PLLD 91 ® ❑ <br /> Q3 PLLD DSL ® ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Describe al/answers marked `No"or `Fail"and proposed remedy in Section 9. <br /> List all Monitoring equipment either replaced or repaired in Section 9. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.