Laserfiche WebLink
Desi Underground Storage Tank <br /> gnated UST Operator Visual Inspection Report <br /> 10- TESTING AND MAINTEN <br /> ANCE <br /> Has monitorin Yes No NA Date last <br /> 9 system certification been performeC 1 <br /> 12 months? completed within the <br /> las spill container testing been completed past ® ❑ 01-13-22 <br /> 2 months? p ted within the past <br /> 3s overfill prevention equipment ® ❑ 01-13-22 <br />' past 36 months? inspection been completed within <br /> s secondary ® ❑ ❑ 01-17- <br /> rycontainment testing been completed within the 2021 <br /> I sero ? <br /> tank tightness testin past ® ❑ ❑ 01-17- <br /> Frames? 9 been completed within re 2021 <br /> required <br /> ine tightness testing been com ED E <br /> ames? plated within the required <br /> Test/Maintenance.- <br />'est <br /> aintenance."est/Maintenance: ❑ ❑ ❑ <br /> est/Maintenance: ❑ ❑ ❑ <br />:ILITY EMPLOYEE TRAINING ❑ ❑ E <br /> individuals performing facility employee <br /> trainingfacility duties received the required fa ' ' Yes No <br /> within the past 12 months? <br /> 7IIENTS <br />�n maybe used to record comments or <br /> S. observations that are not current compliance <br />'munication cables caused brief short in system. Ravi <br />'o be ok but recommended u awed set u <br /> upgrading software at annual. p With technician - <br /> WAMM <br /> i <br />