Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used- <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer lia Industry Standard ❑ Professional Engineer <br /> Test Type 52 Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Analogue Gauge +-0.25 <br /> Pipe Run ID T1 auto dispensers to Tran sump T3 turbine to trans sump T5 91 complete T6 Auto diesel complete <br /> Pipe Manufacturer NOV Fiberglass Systems NOV Fiberglass Systems NOV Fiberglass Systems NOV Fiberglass Systems <br /> Test Start Time 9:30am 9:30am 9:30am 9:30am <br /> Initial Reading 5 psi 5 psi 5 psi 5 psi <br /> Test End Time 10:30am 10:30am 10:30am 10:30am <br /> Final Reading 5 psi 5 psi 5 psi 5 psi <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results 0 Pass ❑ Fail 1 2 Pass ❑ Fail bA Pass ❑ Fail [0 Pass ❑ Fail <br /> Pipe Run ID T3 trans sump to UDC 25-20 26 sal included <br /> Pipe Manufacturer NOV Fiberglass Systems <br /> Test Start Time 9:30am <br /> Initial Reading 5 psi <br /> Test End Time 10:30am <br /> Final Reading 5 psi <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results 10 Pass ❑ Fail I ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />