Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard P Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 52 Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID T1 Diesel STP T4 87 STP T5 91 STP T6 Auto Dsl STP <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 65" 58" 57" 59" <br /> Sump Bottom to Top of 36" 18" 17" 18" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:10am 11:51am 11:28am 11:28am <br /> Initial Reading 4.3312" 2.2382" 5.0488" 5.9202" <br /> Test End Time 9:25am 12:06pm 11:43am 11:43am <br /> Final Reading 4.3311" 2.2364" 5.0488" 5.9201" <br /> Change in Reading -0.00011, -0.0018" 0.0000" -0.00011, <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/-0.002 +/-0.002 <br /> Tightness Test Results 52 Pass ❑ Fail 52 Pass ❑ Fail 52 Pass ❑ Fail 52 Pass ❑ Fail <br /> Sump/UDC ID UDC 14-15 UDC 26M <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) 30" 30" <br /> Sump Bottom to Top of 9" 12" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:25am 9:04am <br /> Initial Reading 2.0524" 5.4967" <br /> Test End Time 10:40am 9:19am <br /> Final Reading 2.0521" 5.4963" <br /> Change in Reading -0.0003" -0.0004" <br /> Pass Fail Criteria +/-0.002 +/-0.002 <br /> Tightness Test Results 52 Pass ❑ Fail 52 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />