Laserfiche WebLink
SWRCB,January 2002 Page of <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Pilot Flying J 618 Ripon Date of Testing: 06/15/2023 <br /> Facility Address: 1501 N. Jack Tone Rd. <br /> Facility Contact: Site Manager Phone: (209) 559-4141 <br /> Date Local Agency Was Notified of Testing: 06/09/2023 <br /> Name of Local Agency Inspector(ifpresent during testing): None <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Jones Covey Group, Inc. <br /> Technician Conducting Test: Shawn Rodriguez <br /> Credentials: C,/CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br /> License Type: A, B and Haz License Number: 804431 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> NOV Fiberglass Systems Secondary Pipe 05/22/2026 <br /> ICC 8412602 11/19/2024 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Diesel Syphon Secondary Line I ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Tank 1 Diesel Secondary Line I ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Tank 2 Diesel Secondary Line I ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Disp 27-28 Satellites Secondary 7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Disp 29-30 Satellite Secondary I ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Tank 4 87 Product Secondary 7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> N/A <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in thxa da—ment are accurate and in full compliance with legal requirements <br /> Technician's Signature: Date:06/15/2023 <br />