My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 10:29:54 AM
Creation date
1/25/2023 9:27:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill , Overfill, leak Detection and Secondary Containment Equipment at UST Facilities <br /> Ing requirements stated in this recommended practice are <br /> general statements and may vary. Recommended Pres- 60 SPILL -BUCKET AND , <br /> sure levels and test durations are addressed in Section 5 .7 . CONTAINMENT SUMP <br /> Piping manufacturers ' test procedures may differ, . . <br /> TESTING <br /> This test can be conducted in sections or as one con- <br /> tinuous pipe depending on the installation. Care should be 6 .1 General . Spill buckets and containment sumps for <br /> taken to ensure that the entire secondary containment of tank systems are neither intended nor designed for the <br /> the piping system is tested. storage of petroleum products , but rather to contain small <br /> 5.6 Test Equipment . Test equipment shall include: leaks and spills for short periods of time. This section <br /> describes the procedures used to test the integrity of spill <br /> • inert gas source (nitrogen , helium, etc, ) ; buckets and contairunent sumps to ensure that they do not <br /> • stopwatch or other time-measurement device capable leak' <br /> of measuring a 1 -second increment ; 6m2 Spill Bucket Integrity Testing --- Hydrostatic <br /> • test tubing assemblies (Tubing assemblies provide Test Method . <br /> access to the beginning and end of the interstitial <br /> space. ) ; WARNING% Do not use fuels such as gaso- <br /> • pressure gauge with a 15 psig maximum pressure read- line, E85 or diesel as a test fluid because <br /> Ing with 0, 5 increments . they present a serious fire and safety <br /> hazard , Gasoline vapors are flammable <br /> 5. 7 Test Procedure , and can explode if exposed to an ignition <br /> 1. If necessary, re-install termination (test) boots at pip- source such as a spark or open flame. If <br /> Ing terminations , a tank or containment area is not tight, <br /> using fuel as the test fluid will cause a <br /> 2. If necessary, connect the tubing assemblies to the sec- release Into the soil or groundwater, <br /> ondary containment termination fitting on each end of <br /> the section of piping to be tested . <br /> S . Connect the inert gas source and pressure gauge. <br /> 4 . Gradually pressurize the interstitial space to 5 psig. <br /> Close the valve and allow the pressure to stabilize. <br /> Repressurize to the specified test pressure if necessary. Water Level <br /> 5, Observe the pressure for a period of 1 hour. <br /> 6 . If thei in pressure after 1 hour is less than the test <br /> p P g P <br /> pressure, check termination fittings and test assemblies • °` • 3300 <br /> for <br /> for leaks . 3 ; ', v y '1F <br /> 7. Release the pressure on the system slowly. , <br /> 8 . Remove the test equipment. <br /> 9 . Restore the piping to its normal operating condition. ; , <br /> , <br /> 5.8 Pass/Fail Criteria. If no pressure change occurs � ' � " <br /> during the test period, the piping system passes the sec- <br /> ondary containment integrity test . FIGURE 6-1. The hydrostatic method of determining <br /> spill bucket integrity uses water to detect leaks. The <br /> If, there is any drop in pressure over the test period , the measuring stick must be placed in the same location <br /> piping fails the secondary containment integrity test , at the beginning and end of the test period to ensure <br /> If there is any increase in pressure over the test period, accurate water level readings . <br /> repeat the test. <br /> pei . org <br />
The URL can be used to link to this page
Your browser does not support the video tag.