My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 10:29:54 AM
Creation date
1/25/2023 9:27:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200-12 <br /> records or the ATG readout. Prepare a monitoring <br /> fluid solution to add to the interstitial space. S. PIPING SECONDARY <br /> 4.3.6 steel Tanks. Liquid-filled (hydrostatic) CONTAINMENT INTEGRITY <br /> tests on Steel tanks require the same fluid as the TESTING <br /> monitoring fluid. Contact the manufacturer for <br /> instructions. 5.1 General. Underground product piping is available <br /> 4.3.7 Fiberglass Tanks. Determine tank size with single and double walls. Double-walled piping pro- <br /> and diameter and apply the appropriate method. vides containment for leaks from primary containment <br /> and must be leak-free to prevent release of product into <br /> 4.3.8 Test Equipment. Test equipment shall the environment. <br /> include: <br /> 5.2 Purpose. This method is used to test the integrity <br /> • monitoring fluid; of piping interstitial space(s). <br /> • stopwatch or other time-measurement device 5.3 Description of Test. The interstitial space is <br /> capable of measuring a 1-second increment; sealed at the ends and is pressurized with an inert gas. <br /> • tape measure. The pressure is monitored for 1 hour.If any pressure drop <br /> 4.3.9 Test Procedure. occurs,the secondary containment fails the test. <br /> 1. Remove any sensor that may be installed in the 5.4 Test Conditions. The primary pipe may contain <br /> tank interstitial space. fuel, and dispensing activities may continue during the <br /> test without affecting test results. <br /> 2. Determine and record the groundwater level. <br /> 5.5 Preparation. If the interstitial space contains prod- <br /> 3. Add test liquid to the tank interstitial space uct, ensure that the interstice is open to the atmosphere <br /> bringing the fluid level into the riser (stand- and perform a precision lesson the primary piping before <br /> pipe) the appropriate level based on the conducting a test on the secondary containment piping. <br /> manufacturer's written procedure. <br /> 4. Document the starting level and start time of Termination fittings must be sealed at all piping termina- <br /> the test. tions, and test fittings must be accessible to perform the <br /> lest. <br /> 5. Start the time-measurement device. <br /> Check with the piping manufacturer regarding testing <br /> 6. Wail the appropriate time according to the procedures and the proper pressure before testing. Test- <br /> manufacturer's test procedure. <br /> 7. Document the ending level and ending time of <br /> the test. <br /> S. Determine and record the groundwater level. "i <br /> 9. Remove liquid added to the tank interstitial ,x ; <br /> f <br /> space, and restore the liquid level in the tank x r <br /> interstitial to normal operating condition. <br /> 10.Reinstall the sensor so that it is installed within s <br /> manufacturer's specifications. <br /> 4.3.10 Pass/Fall Criteria. Compare the data to <br /> the manufacturer's pass/fail criteria in Appendix A <br /> to determine if the tank has passed the lest. , } t a.•. <br /> FIGURE 5.1. Boots on piping transitions and through <br /> sump walls must be leak-tight when piping secondary <br /> containment Integrity testing is performed. <br /> �i pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.