Laserfiche WebLink
5/11/2015 Pilot Flying J#518 Ripon Site Map <br /> UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> LIST Munitvring Site Plan <br /> Site Address. Pilot Flying J 1501 N. Jack Tone Rd., Ripon CA <br /> U-U6per>ier <br /> P-Mxrbru�Can"ra.aA <br /> S-Sr.rgx <br /> STP-Uelre S:+mi <br /> F=rte a,�i <br /> V-VdxF Bu.M.et <br /> A-An.ukA 5"j. <br /> le-ALWn%Alu Iank4 e, <br /> TS-TrareWn S, V <br /> P,udu.A Lw?m- <br /> ,`� ' Ven WIC:= <br /> Vapi.Lines= <br /> --, <br /> CAS--Jeal;Al,Sari aA1i <br /> VT=Vel II LII Wa <br /> "amphr SINK.IWI*MV se"Kr/U.- <br /> a V <br /> -AM <br /> 7 V <br /> Lb <br /> IN FM L, rn <br /> 5 <br /> 12 <br /> � r <br /> K r <br /> Lre <br /> ab-Purra� <br /> i 11 <br /> EUdrg <br /> L <br /> - LH &'10 111'. 11tl <br /> .LS _ <br /> _2 <br /> 3 <br /> Lb <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page,with your <br /> Monitoring System Certification.On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locationsof the following equipment, it installed: monitoring system control panels-, sensors monitoring tank annular <br /> spaces,sumps,dispenser pans,spill containers,or other secondary containment areas; mechanical or electronic line <br /> leak detectors; and in-tank liquid level probes(if used for leak detection). In the spare provided,note the date this Site <br /> Plan was prepared. <br /> httpsAvww.glirty.cam/9DtArni51329784n? xe=&app=1b5094bG-6042-11e2-odd-OB00200c 9a56&deu=false 113 <br />