Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />GPH =Gallons Per Hour, Y = Yes, N = No, NA =Not Applicable, VPH = Vacuum/Pressure/Hydrostatic, ID =Identificati <br />Y <br />N <br />NA <br />Was a leak simulated to verify LLD performance? <br />all that apply.) Simulated leak rate verified: 3 GPH ❑ 0.1 GPH <br />❑ <br />0.2 GPH <br />® <br />❑ <br />El <br />Was the testing apparatus properly calibrated? <br />® <br />❑El <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected?El <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a <br />test? <br />❑ <br />❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />21 <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />® <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />© <br />❑ <br />❑ <br />For any answer of "M' above, describe in Section Xlll how and when these issues were or will be <br />corrected. <br />XIII. COMMENTS <br />RECEIVED <br />MAY 18 %0':3 <br />ENVIRONMENTAL <br />HEALTH DFRARTNAENT <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING <br />EQUIPMENT <br />TESTING <br />® Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID <br />Component(S) Monitored By This Sensor <br />Sensor Functionality <br />Test <br />Interstitial Communication <br />Test <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fall <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />I <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space p <br />❑ Other (Describe the method in section XV below.) <br />❑Visual <br />❑ <br />Gauge <br />Inspection <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br />For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />on <br />