My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2800 - Aboveground Petroleum Storage Program
>
PR0516364
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 3:54:25 PM
Creation date
1/27/2023 11:52:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0516364
PE
2832
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. MATHEWS RD. <br />IW��gI <br />(•)YEEDER E�_ L <br />"FF <br />J L _ y <br />TLSPA 350 Dax <br />vaEL [� <br />mvECERRWT—1 1 <br />7 <br />c) <br />APPROVED AS NOTED <br />07/28/2023 <br />SCOPE OF WORK, <br />• LINE THE DIESEL TANK AND RAISE THE CONTAINMENT WALLS TO HOLD 10,000 <br />GALLONS. <br />• CORS WILL WORK INJUNCTION WITH BAT&C COATINGS LLC TO INSPECT AND LINE THE <br />AST, (SEE ATTACHED SCOPE OF WORK). BAT&C TO GAIN ENTRY INTO THE TANK. <br />• TANK TESTING AND STAND INSPECTIONS AS REQUIRED PER CUPAS REQUIREMENTS. <br />• BUILD BLOCK WALL 2' HIGHER AND SEAL BLOCKS TO HELP CONTAIN PRODUCT IF <br />FAILURE OF TANK OCCUR$. <br />1. TANK UN1NG <br />a. PREPARE SITE FOR BAT&C TO PERFORM TANK ENTRY & LININGIREPAIR OF THE <br />TANK <br />b. BAT&C'S LIN INGIREPAI R INSTALLATION <br />rn c. PROVIDE SOIL SAMPLING PER APPROVED WORK PLAN <br />m d. CALL FOR INSPECTIONS AS REQUIRED BY CUPA <br />p e. PREFORM TANK TESTING <br />o f. CALL FOR REQUIRED INSPECTIONS <br />2. BLOCK WORK FOR ABOVE GROUND TANK ENCLOSURE CON'TAINMEN'T <br />ENLARGEMENT <br />a. REMOVE AND DISPOSE OF MORTAR CAP ON EXISTING IY X 30' ABOVE GROUND <br />TANK ENCLOSURES, <br />b. IN5TALLATION OF 64-#4 REBAR VERTICAL EPDXY DOWELS 16" O.C. AT <br />EXISTING ABOVE GROUND TANK ENCLOSURE. <br />c. INSTALLATION OF 80• L. F. SIKA SWELL -STOP. PRICE INCLUDES GRINDING TOP <br />OF WALL TO REMOVE ANY LOOSE MATERIALS. PRESSURE WASH TOP OF WALL <br />APP LY SIKA S W E LL -STOP PRIMER AND I NSTALL SWELL -STOP. <br />d. EXTEND EXISTING 10' X 30' X 3.5' ABOVE GROUND TANK ENCLOSURE 2' HIGHER. <br />e. 3 ADDITIONAL COURSES OF CMU'S, <br />f. INSTALLATION OF #4 VERTICAL REBAR AT 16" O.C., <br />g. INSTALLATION OF lid HORIZONTAL REBAR 24" O.C. <br />h. GROUT SOLID ALL CELL'S. <br />3. CALL FOR FINAL INSPECTIONS * REVISED 6-8-2x23 <br />KEY: <br />J&L PG.1 SCOPE OF WORK <br />MARKET DELI PG. 2 BAT&C INFO <br />PG. 3 LINING MATERIAL "A" <br />PG. 4 LINING MAT ER[AL "B" <br />J PG. 5 TANK BLASTING MATERIAL <br />-� PG. 6 PICTURES <br />PG. 7 BLOCKWALL DETAILS <br />185' <br />5' 15' 25' <br />PLANK <br />TO BE LINED <br />CPE OF WORK <br />�+ <br />r <br />+I <br />f <br />11 <br />TO BE MENDED 7 HIGHERr <br />1 <br />7 <br />c) <br />APPROVED AS NOTED <br />07/28/2023 <br />SCOPE OF WORK, <br />• LINE THE DIESEL TANK AND RAISE THE CONTAINMENT WALLS TO HOLD 10,000 <br />GALLONS. <br />• CORS WILL WORK INJUNCTION WITH BAT&C COATINGS LLC TO INSPECT AND LINE THE <br />AST, (SEE ATTACHED SCOPE OF WORK). BAT&C TO GAIN ENTRY INTO THE TANK. <br />• TANK TESTING AND STAND INSPECTIONS AS REQUIRED PER CUPAS REQUIREMENTS. <br />• BUILD BLOCK WALL 2' HIGHER AND SEAL BLOCKS TO HELP CONTAIN PRODUCT IF <br />FAILURE OF TANK OCCUR$. <br />1. TANK UN1NG <br />a. PREPARE SITE FOR BAT&C TO PERFORM TANK ENTRY & LININGIREPAIR OF THE <br />TANK <br />b. BAT&C'S LIN INGIREPAI R INSTALLATION <br />rn c. PROVIDE SOIL SAMPLING PER APPROVED WORK PLAN <br />m d. CALL FOR INSPECTIONS AS REQUIRED BY CUPA <br />p e. PREFORM TANK TESTING <br />o f. CALL FOR REQUIRED INSPECTIONS <br />2. BLOCK WORK FOR ABOVE GROUND TANK ENCLOSURE CON'TAINMEN'T <br />ENLARGEMENT <br />a. REMOVE AND DISPOSE OF MORTAR CAP ON EXISTING IY X 30' ABOVE GROUND <br />TANK ENCLOSURES, <br />b. IN5TALLATION OF 64-#4 REBAR VERTICAL EPDXY DOWELS 16" O.C. AT <br />EXISTING ABOVE GROUND TANK ENCLOSURE. <br />c. INSTALLATION OF 80• L. F. SIKA SWELL -STOP. PRICE INCLUDES GRINDING TOP <br />OF WALL TO REMOVE ANY LOOSE MATERIALS. PRESSURE WASH TOP OF WALL <br />APP LY SIKA S W E LL -STOP PRIMER AND I NSTALL SWELL -STOP. <br />d. EXTEND EXISTING 10' X 30' X 3.5' ABOVE GROUND TANK ENCLOSURE 2' HIGHER. <br />e. 3 ADDITIONAL COURSES OF CMU'S, <br />f. INSTALLATION OF #4 VERTICAL REBAR AT 16" O.C., <br />g. INSTALLATION OF lid HORIZONTAL REBAR 24" O.C. <br />h. GROUT SOLID ALL CELL'S. <br />3. CALL FOR FINAL INSPECTIONS * REVISED 6-8-2x23 <br />KEY: <br />J&L PG.1 SCOPE OF WORK <br />MARKET DELI PG. 2 BAT&C INFO <br />PG. 3 LINING MATERIAL "A" <br />PG. 4 LINING MAT ER[AL "B" <br />J PG. 5 TANK BLASTING MATERIAL <br />-� PG. 6 PICTURES <br />PG. 7 BLOCKWALL DETAILS <br />185' <br />5' 15' 25' <br />
The URL can be used to link to this page
Your browser does not support the video tag.