My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2771
>
2300 - Underground Storage Tank Program
>
PR0234251
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2023 12:18:05 AM
Creation date
1/30/2023 10:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0234251
PE
2361
FACILITY_ID
FA0003508
FACILITY_NAME
TULARE FARMS LLLP
STREET_NUMBER
2771
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
17710025
CURRENT_STATUS
01
SITE_LOCATION
2771 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />She Addre=_s Tulare Farms 2TH T FREP&A-CAMP ROAR FRENCH CAMP CALIFOMLA 953M <br />REG. DISPENSER <br />. . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . - - - <br />*PIPItiG . . . . . . . . . <br />(i aDWS) . . . . . . . . . . . . . . <br />D=ine Of . . . . . . . . <br />]?rP exit of . . . . . . . . . <br />n— and LDC'x. . . . . . . . . . . . . <br />No tmdereraund . . . . . . . . <br />dra>,timg i . . . . . . . . <br />accura.te, Ive <br />cannot specu A- <br />KE <br />F = FELLS <br />T - TL1�Bi\'E <br />P = PROBE <br />V=VAPOR <br />7E=SUNN aNSOR <br />L=LeakDetamr <br />B =Brine Sensor <br />I = smart seosar <br />5 -STP <br />C =Ficete & Clraina <br />E -g stop <br />.DIEDISPENSER PrPUP . , . , , . _ . <br />000 <br />VENTS <br />hbe Pte= AW iamz t wkWoundrhm-a" nor vfsible ro the carr[&-!nKifchnkfat ave a <br />64t�' prgiassionai opinion ont: and masala{y,%rrrlformmianalpaoposas. Dvawrng <br />Am to scale <br />Date map was drau•r,: VID-21 <br />11STTMonitoring Site Plan <br />Jnstruetittns <br />If you already have a diagram that shcws al required information. you may include it rathe• Shan this page, with your Monitoring System Certification. On yaui-S& plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equypmerd. if installed: monitoring system control panels; senmrs monikKig Eank <br />annular spaces, sumps, dispenser pans, me <br />spill containers, or other secdary cortta"sun; m <br />em areas', or etccrmcm <br />nic Jine leak deters; and W tank liquid levet <br />probes {d used for ieak detection). In the space pmv&ded, nate the data rhis Site PLm was prepared. <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.