My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 1:35:46 PM
Creation date
1/30/2023 2:56:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Saetern, Kristina Gaen [EHD] <br /> From: Baban Virk <baban.virk@yahoo.com> <br /> Sent: Thursday,January 26, 2023 5:14 PM <br /> To: Saetern, Kristina Gaen [EHD] <br /> Subject: 1097 E.Yosemite Ave. Escalon Mini Mart Update <br /> Attachments: 2.23.22 Overfill Prevention.pdf, Overfill Prevention 11-15-21.pdf; Spill Container. <br /> Secondary Containment 3.16.22.pdf <br /> Hi Kristina, <br /> I hope you're doing well. I want to give you an update on how we're doing. I received the overfill prevention equipment <br /> inspection form, I noticed there was no CERS ID in the one you were sent so I'm attaching the form with the CERS ID. I <br /> asked Bonnie from Donlee Pump to provide the secondary containment testing report from 3/16/22 and they sent me the <br /> spill container testing report from 3/16/22, 1 believe they are both the same but If they are different please let me know. <br /> The same pdf also includes the monitoring system certification from 12/21/21. For the overfill prevention conducted on <br /> 2/23/22, I'm sending you the one with the correct date of 2/23/22 as the one you were sent didn't have the correct date. <br /> For verifying the ball floats, I'm in touch with Sandi from Afford-a-test and I'm checking in on them every 2-3 days to see if <br /> they have an update. If you can please give me a little more time for that because they were trying to figure out what was <br /> going on and I think they will help us resolve this. Also, when I talked to Stacy she confirmed Afford-a-test has sent you <br /> the repair for the STP sensor on 91 product that was conducted on 12/15/22, sorry I forgot to mention that in my previous <br /> email. Also, Stacy mentioned we don't need to reschedule the spill container testing because it has already been <br /> performed, we should just be careful about providing a 48-hour notice in the future. I will stay in touch with you and give <br /> you an update about the confirmation on ball floats when I get an update from Afford-a-test. Please let me know if you <br /> have any questions or if you need anything else. Thank you <br /> Best regards, <br /> Baban <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.