My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:39 AM
Creation date
2/6/2023 9:14:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
Razi Petroleum Inc.
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Environmental Reporting System (CERS) Underground Storage Tank- Monitoring Plan <br /> Facility/Site <br /> Razi Petroleum Inc. UST Tank#/CERS Tank CERSID <br /> ID# 10182093 <br /> 50 W ELEVENTH ST TA0140106/ <br /> 10182093-003 <br /> RACY,CA 95376 Tank Info:Installed Date:1/1/1988 12:00:00 AM-Tank Use:Motor Vehicle Fueling-Tank <br /> Contents:Regular Unleaded-Type Of Tank:Double Wall-Piping Construction:Double- <br /> walled <br /> Recordkeeping <br /> Yes Alarm Logs <br /> Visual Inspection Records <br /> Tank Integrity Testing Results <br /> SIR Testing Results <br /> Tank Gauging Results <br /> ATG Testing Results <br /> Corrosion Protection Logs <br /> es Equipment Maintenance and Calibration Records <br /> Training <br /> Yes Personnel with UST Monitoring Responsibilities are Familiar with Training Documents <br /> Specify Other Training Documents <br /> UST Monitoring Plan,Operating Manual <br /> Yes Designated Operator Training <br /> omments/Additional Information <br /> omments and Additional Information <br /> ver filled prevention set with mechanical flapper at 95%tank capacity <br /> Personnel Responsibilities <br /> Name of First Person Having Responsibility Name of Second Person Having Responsibility <br /> Mohammad Fayzi Farht Fayzi <br /> itle of First Person Having Responsibility Title of Second Person Having Responsibility <br /> ,Co-Owner Co-Owner <br /> Printed on 10/24/2023 12:22 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.