My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015345
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUSTIN
>
25476
>
2600 - Land Use Program
>
PA-2300002
>
SU0015345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:34:59 PM
Creation date
2/6/2023 10:13:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015345
PE
2690
FACILITY_NAME
PA-2300002
STREET_NUMBER
25476
Direction
N
STREET_NAME
DUSTIN
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
00704001, -26, -27
ENTERED_DATE
1/11/2023 12:00:00 AM
SITE_LOCATION
25476 N DUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & Electric Company <br /> 11 . Cathodic Protection : PG & E pipelines are protected from corrosion with an " Impressed <br /> Current " cathodic protection system . Any proposed facilities , such as metal conduit , pipes , <br /> service lines , ground rods , anodes , wires , etc . that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG & E Corrosion Engineering . <br /> 12 . Pipeline Marker Signs : PG & E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines . <br /> With prior written approval from PG & E Pipeline Services , an existing PG & E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work . The pipeline marker must be moved back once construction is <br /> complete . <br /> 13 . PG & E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California . Therefore , any plans that impact PG & E ' s facilities must be reviewed and <br /> approved by PG & E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities . <br /> PG & E Gas and Electric Facilities Page 4 <br /> Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.