Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:6/14/2022 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: 824 E Yosemite Ave Manteca 95336 <br /> *PIPING <br /> EMC (ARROWS) <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawing of <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . piping exit of <br /> . . . . . . . . . . . . . . . . . . . . . . sump and UDC's. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No underground <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . drawing is <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . accurate,we <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . cannot speculate <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . blue prints. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . X . . . . X . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89 87 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L L <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . P X P X . . <br /> . . . . . . . . . . . X . . . . . X . . . . . . . . . . . . . . O <br /> V <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . O <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9I . . <br /> L <br /> P X E O <br /> . . . . . . . . . . . . O <br /> KEY <br /> AR Sensor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . V O <br /> A=ANNUL . . . . . . . . . . . . . . . . . . . . . . . . . . . . A . <br /> F=FILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . E <br /> V=VAPOR . . . . . . I . . I . . I . . . . . . . . . . . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . . . . . . . A . . <br /> L=Turbine/Leak Detector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X=SUMP SENSOR . . . . . . I . . I . . I . . . . . . . . . . . . . . . <br /> B=Brine Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> S=Smart Sensor <br /> c=Floats&chains YOSEMITE AVE <br /> E=E Stop <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing not to <br /> scale. <br /> Date map was drawn 6/3/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />