My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:39 AM
Creation date
2/14/2023 8:26:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
BILLJAR VALERO
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:1/19/2023 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> 5l Address AP 81LLJAR VALERO—153 E 11" ST TRACY CA <br /> . . . . . . . . . . <br /> . . . . . . . . . . . <br /> i <br /> ATG . . . . . . . <br /> a �. <br /> . . . . 91 87 MAIN 87 S)THQ—N <br /> X <br /> F F F <br /> . . . . . . . . . . . . . . . . . . . . . . . 7 A=Ax1iUult Sensor <br /> . . . . . . . . . . . . . . . . . . F=FELLS <br /> . . . . . . . . . . V=VAPOR <br /> . _ . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L=Turbine Leak Detector <br /> -bp-item radrrgroraaitha are na timble to thio cert6mg teelsridan are a X=SUN EP SENSOR <br /> p�essiwnl oFirran or i and are sdeh far i�ornntiwnl prnpaa- Drmrrrg B=Brine Sensor <br /> rot to scde S=Smart Sensor <br /> C=Floats&Chains <br /> E=E Stop <br /> Date map was drawn:17211121 <br /> Instructions <br /> If you already have a diagram that shows at required information,you may include it rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitorng system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas.mechanical a electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.